Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹4.8 L
Closing Date
10 Jan 2022, 6:55 pmClosed
Executive Engineer,REW Poonch
Office of Executive Engineer, REW Poonch
Please refer to BOQ.
2022_RDPR_156097_1
e-NIT No. 465 of REW POONCH, Dated 05-01-2022-2nd
Open Tender
Civil Works
Item Rate
15 days
Poonch
Please refer to technical Bid as per Conditions of e-NIT.
5 documents required · 5 mandatory
₹600
Executive Engineer, REW Poonch
Exempted
12 Jan 2022
5 Jan 2022
11 Jan 2022
5 Jan 2022
10 Jan 2022
5 Jan 2022
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.... All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with . 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 30% Stone 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
Supplying spreadin river bed Material incl. loading and Unloading complete job
Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for column
Centering and shuttering including strutting, propping etc. and removal of form for:Lintel, beams, plinth beams, girders, bressumers and cantilevers.
Centering and shuttering including strutting, propping etc. and removal of form work for Suspended floors, roofs, landings, balconies and access platforms.
Centering and shuttering including strutting, propping etc. and removal of form work for: Columns, pillars, piers, abutments, posts and struts.
Edges of slabs and breaks in floors and walls Under 20 cm wid
Carriage of Stone with Distance 500 mtr by H/L
Carriage of Sand / Bajree with Distance 50 KM bt MT
Installation / Construction of Sign Board (C.I.B) Showing details of project of required specifications, as directed by Engineer Incharge at Site.
M/s Moheen Khan
M/S GHULAM MUSTAFA
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .