The EE Hajo Jalukbari Div Irrigation Amingaon
The EE Hajo Jalukbari Div Irrigation Amingaon
Hybrid Irrigation Scheme Solar and Electric operated in 1 no Bagta area of Kamrup District under Hajo Jalukbari Division Irrigation Amingaon Guwahati 31
2022_ID_24144_1
HJDI(T)/118/2022/01 date 27/01/2022
Open Tender
Civil Works
Item Rate
180 days
Amingaon
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,000
Yes
₹1.9 L
Yes
15 Mar 2022
29 Jan 2022
18 Feb 2022
29 Jan 2022
18 Feb 2022
29 Jan 2022
Amount
Final Survey :
Final Survey
Boring & Installation of tubewell
Drilling Drilling of telescopic vertical bore well in alluvium area as per IS -2800 (Part-I)/1991 upto a depth of 45 M for Tube well assembly (150 mm dia x45 Metre ) and collecting & storing strata sample in suitable container at every 3.0 M including preparation of site, providing and movement of rig up to boring point, water supply, temporary accomodation, consumable like bantonite power, POL and all other materials reqd for the purpose including transportation, labour all complete as directed.
Supply & Lowering of Pipes :-Supplying sinking, lowering and fitting in position of UPVC Casing pipe/ blind Pipe/ Ribbed screen filter pipe conforming to IS 12818/2010 and of approved brand (Jindal/ Prince/ Oriplast) including well cap, socket reducer, MS housing clamp etc up to a depth of 50 metre as reqd and as directed i)150 mm dia UPVC pipe thickness 6.5 mm to 8.0 mm
ii)150 mm dia UPVC Ribbed Screen pipe 5 mm to 6.5 mm
iii)65 mm sluice valve
Shrouding of TW Shrouding of the Tube wel assembly by packing of river Pea Gravel of size 4mm to 8 mm free from sand, dust and any othei foreign materials after staking at site including screening, washing etc as per IS 4097/2006 along with transportation, labour etc. complete as directed and (Packing to done after lowering tube well assembly and also during development as reqd) As per Annexure II
Developing of TW Developing the Tube well assembly by air compressor of capacity 8-12 kg/sqcm so as to get sand free discharge including trial pumping and providing following data as directed. 1. Static water level 2. available average discharge 3. Drawdown at different discharge (arrangement of pump for trial pumping is in the scope of the work
MS Clamp Pump Support Supplying, fitting fixing of 150 mm dia MS clamp of size 15 mm thick and 150 mm width having projection of 300 mm and three holes of 20 mm dia for clamping the plates by 16 mm dia hexagonal bolts of length 75 mm and nuts on both sides encircling the column pipe including two coat of enamel paint over one primary coat of different dia all complete as directed and specified.
INSTALLATION & COMMISSIONING OF SOLAR POWER PLANT
Cost for Supply, Installation & commissioning of Solar Photovoltaic Power Plant for energizing the 3HP submersible pump set with solar pump, panel mounting structures etc. SPV Module 3 KW, Solar Pump Controller Unit, cables, including LT panel, earthing and lighting arrestor etc. 3.0 HP SPV Module for 3 HP Pump As per MNRE benchmark cost ( MNRE Notification No. 30/11/2012-13/NSM )Work as per the MNRE norms and with following instructions as per direction of the department : (1) Supply, installation and commissioning of Solar PV for water pumping system consisting of solar panels framed in anodized aluminium frame mounted on stable hot dipped galvanized ( min 80 micron thickness) mild steel structure of rectangular hollow sections, angles, heavy duty pipes (all materials duly IS marked ) for providing sufficient strength with dual axis manual tracking arrangement which can withstand load of modules and high wind velocities upto 150 Km/hr, having RCC foundation designed against all possible loads (Dead, Live and imposed load). Modules supplied with the SPV system should have certificate as per IEC 61215 specification or equivalent National or International standards and must be interconnected with cables of required specification routed in PVC conduits properly fitted along the G.I structure to provide a good aesthetic view. Modules must qualify to IEC 61730 part I and part II for safety qualification testing. The power output of individual PV modules used in the PV array, under STC, should be of minimum 250 Watts peak, with adequate provision for measurement tolerances. Solar cells should be crystalline silicon cell with min. efficiency of 15% and fill factor more than 70%, should be laminated between sheet of -Ethylene Vinyl Acetate (EVA) and high transmissivity 3.2mm tempered glass including appropriate DC to AC inverter and power controlling unit with MPPT technology to run at low sunshine and minimum 6 hours a day run with all necessary accessories suitable for solar + grid operation and including all protections of AC induction motor pump. (SPV panel should be of reputed make of MNRE and carry at least 20 years warrenty & comprehensive maintenance for 1 year and should preferably above HFL ) (2) Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (Hot Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. Below the ground level as below: (a) By ISI-Medium GI pipe including excavation of soil for installation of Earth Electrode and filling & ramming and connecting to individual structure to earth electrode including S&F 20 mm x 3 mm galvanised (Hot Dip) MS flat on wall/floor with GI saddles as required and connectionto equipments incl.drilling holes, withbolts,nuts, washers etc. (3) Lightning protection (Arrestor)(pole mounted)(: Lightning protection with 3" X 1.5" G.I pipe of 4 mts height with base flange in proper RCC foundation and S & F Lightning Conductor Air Terminal made of 20 mm dia 1000 mm long GI pipe (ISI Medium) having five discharge prongs of 4 SWG GI (Hot Dip) wire at top duly soldered with 7/16 stranded GI (Hot Dip) wire and 85 mm dia 6 mm thick GI base plate at bottom incl. necessary holes etc including supply & fixing GI (Hot Dip) strips 20 mm x 3 mm thick for horizontal run on the /Roof with GI Saddles 1100 mm apart. (4) Supply, installation and commissioning of BIS marked submersible pump set of 3 HP with 100mm outlet as per specification using necessary requisite, tools and plants by lowering the same within the tubewell housing pipe upto the following depth as per direction by fitting, fixing column pipes and other accessories, fixtures with necessary nuts, bolts and washers and suspending the entire assembly of pump set vertically by fixing the same supported by M.S. clamps over the top of housing pipe, binding the motor cable with each column pipes and drawing cable upto pump controller/starter point including opening out of the top cap of housing pipe of the tubewell and testing of motor both in loading as well as in unloaded condition before and after installation of the same. (Solar Pumpset and cables should be of reputed make and carry 5 years warrenty). Solar submersible pumpset with 3 HP DC induction motor suitable for 150 mm borewell and minimum discharge capacity approximately 400 LPM at 10 m head working with 3000W of Solar Power array alongwith cables etc. in complete as per MNRE norms & as per IS.(5) Controller : Controller should be of the approved make; as per BIS/IS/MNRE specifications and it should be in accordance with the electrical parameters of the 3HP D.C. Motor/Pump. Controllers should be fixed in suitable IP 54 Box with the provision of SPD as per norms of SNA. Controller must have Remote Monitoring Arrangement as per MNRE guidelines. Some of the requirements of the Controller are : Controller capacity is minimum 3000W, operating freq. 50Hz± 10%, MMPT, IP65 enclosure, DC circuit breaker disconnect switch, GSM/GPRS, LCD display etc.
LT Electrical Power Connecting:-
(i) Supply and erection of 7.5 metre Iong PCS pole of standard dimension for 230 Volt overhead line including digging of Earth pit (O.75 m ' 0.5 m) having a depth of 1/5th of the pole length with PCC Base Plate of size 60 cm ' 60 cm ’ 12 cm at the bottom, refilling with boulder packing (size 150mm to 200 mm), refilling the voids with soil and hard ramming as directed.
Supply and Erection of LT Stay Set complete
Anchor clamp LT ABC
LT XLPE Insulated ABC 1C x 35 Sq mm+1C 25Sq mm
I. Hook
Suspension Clamp for ABC as per NFC standard
ASA Distribution Box 40 A 1 Ph
LT Guy insulator
DP MCB With Enclosure
Medium quality GI Pipe 40mm dia for service connection
Supply laying and connection of XLPE insulated Aluminium conductor armoured cable,10 sq mm* 2 Core (For Service Connection from Pole to Panel Board)
Erection of Static Electronic Energy Meter including payment of Meter Cost to APDCL, testing of the installation and power connection to the installation complete as directed.
EXIM Meter
Sundry Materials
Transportation Cost @ 5% on (D) --
APDCL Supervision Charge ,Storage Charge etc L.S @ 5% on(D)
Supply of Canvas Pipe
Supply of Canvas Pipe 65 mm Dia
ENAJORI ENTERPRISE
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .