Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.9 CrAccepted-AOC | ₹34.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹37.1 Cr+₹2.2 Cr (6.38%)Rejected-AOC | ₹37.1 Cr+₹2.2 Cr (6.38%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical E 30 2ND FLOOR 2ND AVENUE BESANT NAGAR CHENNAI 600 090 | CHENNAI | TAMIL NADU | 600090 | - | - | Rejected-Technical Not Prequalified |
| 4 | Rejected-Technical MADURAI MADURAI TAMIL NADU | - | - | Rejected-Technical Not Prequalified |
| Sl No | Description | Qty | Unit | SPL INFRASTRUCTURE PVT. LTD L2 | jawahar constructions L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of soils and depositing on bank, with all leads and lifts as per SS20B, Including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs,stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifation, for PILE CAP UNDER RETAINING WALL AND EMBANKMENT CUTTING FOR APPROACH ROAD, WIDENING PORTION as per Section 300 of MORT&H Specifications (Fifth Revision). | 17,554 | Cubic Metre | 501 ₹87,94,554 Lowest | 550.89 ₹96,70,323 |
| 2.00 | Providing Vibrated reinforced cement concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal Bored-cast-in situ piles of 1200mm diameter, as per Cl.709.1.9 of IRC:78-2014, including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel and placing it in position before concreting, setting up of piling equipment, shifting the same from one pile location to another pile location, dismantling and including all labour for boring through all soils, leading the excavated earth to a distance 200 m including forming of working platform over the river bed for accomodating piling equipment, forming approaches to the working platform, mixing concrete, filling it in position by tremie pipe, cutting of pile head to cut-off level for casting pilecap, including diversion of water course if necessary and all other incidental charges etc., complete as per standard specifications, forming and maintaining protective bunds and all other incidental charges etc., complete for PILES BELOW RETAINING WALL as per Sections 1100 & 1700 of MORT&H Specifications (Fifth Revision). | 3,006 | Running Metre | 18,000 ₹5,41,08,000 | 15,470.79 ₹4,65,05,195 Lowest |
| 3.00 | Providing and driving in position permanent M.S Liner including cost and conveyance to the site and fabrication charges and tools and plants and driving M.S 6.mm thick liner to be left premanenty with the pile shaft as per the requirement and as per the specifications and placing from the bottom with all leads and lifts using 6mm M.S. Sheet etc., complete. | 179 | Metric Tonne | 90,000 ₹1,61,10,000 | 86,219.06 ₹1,54,33,212 Lowest |
| 4.00 | Plain cement concrete of grade M15 (Nominal mix 1:2:4) using 40mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site including potable water, labour charges for mixing, transporting, laying, compacting, curing concrete, tools and plants and incidential charges such as bailing out water, maintaining protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification, for LEVELLING COURSE BELOW PILECAPS as per Sections 1100 of MORT&H Specifications (Fifth Revision). | 653 | Cubic Metre | 7,700 ₹50,28,100 | 7,040.41 ₹45,97,388 Lowest |
| 5.00 | Vibrated Reinforced Cement Concrete M25 using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of form work and centering, labour charges for mixing,transporting, laying and curing concrete, working at heights , soft water, hire charges for tools and plants, including all other incidental charges thereto etc., complete as per relevant standard specification for KERB. (As per MoR&TH Spec.No: 1719,Rev-v-2013) | 232 | cubic meter | 10,000 ₹23,20,000 Lowest | 10,707.56 ₹24,84,154 |
| 6.00 | Filling with Stone Dust below footpath including cost & conveyance of sand to work site, labour for filling, watering and compacting by tamping with all leads for water and all other incidental charges etc. complete as per relevant standard specifications. | 271 | cubic meter | 750 ₹2,03,250 | 665.34 ₹1,80,307 Lowest |
| 7.00 | Vibrated reinforced cement concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification for PILECAPS UNDER RETAINING WALL as per Sections 1100,1500 & 1700 of MORT&H Specifications (Fifth Revision). | 1,219 | cubic meter | 9,500 ₹1,15,80,500 | 8,723.47 ₹1,06,33,910 Lowest |
| 8.00 | Vibrated reinforced cement concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete for RETAINING WALL, VUP BOX as per Sections 1500,1700 & 2200 of MORT&H Specifications (Fifth Revision). | 2,881 | cubic meter | 13,000 ₹3,74,53,000 | 12,616.53 ₹3,63,48,223 Lowest |
| 9.00 | Vibrated reinforced Cement Concrete of grade M40 (Design mix) using 20mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site,but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying, curing concrete, working at heights, potable water, hire charges for tools and plants, including all other incidental charges, etc., complete for CRASH BARRIER ON RETAINING WALL as per Sections 811,1700 &2703.3 of MORT&H Specifications (Fifth Revision). | 313 | cubic meter | 14,000 ₹43,82,000 | 13,062.97 ₹40,88,710 Lowest |
| 10.00 | Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for Retaining walls including costs and conveyance of all materials to work site and labour charges for fixing , etc., complete to drain the backfill as per Section 2706 of MORT&H Specifications (Fifth Revision). | 762 | Number | 230 ₹1,75,260 | 212.48 ₹1,61,910 Lowest |
Tender Value
Refer Docs
EMD Value
₹19.5 L
Closing Date
23 Feb 2026, 11:00 amClosed
Superintending Engineer H, CMDP Circle
O o Superintending Engineer H CMDP Circle Saidapet
Construction of Road Over Bridge at Km 75 6 of Chennai Tiruttani Renigunta Road SHU 148 in addition to existing two lane Road Over Bridge
2026_HWAY_654547_1
Tender Notice No 15 2025 26 CMDP DO dt. 03.02.2026
Open Tender
Civil Works - Bridges
Item Rate
450 days
ambattur
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹19.5 L
Yes
O o Superintending Engineer H CMDP Circle
9 Apr 2026
11 Feb 2026
23 Feb 2026
11 Feb 2026
23 Feb 2026
11 Feb 2026
13 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all classes of soils and depositing on bank, with all leads and lifts as per SS20B, Including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs,stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifation, for PILE CAP UNDER RETAINING WALL AND EMBANKMENT CUTTING FOR APPROACH ROAD, WIDENING PORTION as per Section 300 of MORT&H Specifications (Fifth Revision). | 17,554 | Cubic Metre | - | - |
| 2 | Providing Vibrated reinforced cement concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal Bored-cast-in situ piles of 1200mm diameter, as per Cl.709.1.9 of IRC:78-2014, including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel and placing it in position before concreting, setting up of piling equipment, shifting the same from one pile location to another pile location, dismantling and including all labour for boring through all soils, leading the excavated earth to a distance 200 m including forming of working platform over the river bed for accomodating piling equipment, forming approaches to the working platform, mixing concrete, filling it in position by tremie pipe, cutting of pile head to cut-off level for casting pilecap, including diversion of water course if necessary and all other incidental charges etc., complete as per standard specifications, forming and maintaining protective bunds and all other incidental charges etc., complete for PILES BELOW RETAINING WALL as per Sections 1100 & 1700 of MORT&H Specifications (Fifth Revision). | 3,006 | Running Metre | - | - |
| 3 | Providing and driving in position permanent M.S Liner including cost and conveyance to the site and fabrication charges and tools and plants and driving M.S 6.mm thick liner to be left premanenty with the pile shaft as per the requirement and as per the specifications and placing from the bottom with all leads and lifts using 6mm M.S. Sheet etc., complete. | 179 | Metric Tonne | - | - |
| 4 | Plain cement concrete of grade M15 (Nominal mix 1:2:4) using 40mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site including potable water, labour charges for mixing, transporting, laying, compacting, curing concrete, tools and plants and incidential charges such as bailing out water, maintaining protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification, for LEVELLING COURSE BELOW PILECAPS as per Sections 1100 of MORT&H Specifications (Fifth Revision). | 653 | Cubic Metre | - | - |
| 5 | Vibrated Reinforced Cement Concrete M25 using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of form work and centering, labour charges for mixing,transporting, laying and curing concrete, working at heights , soft water, hire charges for tools and plants, including all other incidental charges thereto etc., complete as per relevant standard specification for KERB. (As per MoR&TH Spec.No: 1719,Rev-v-2013) | 232 | cubic meter | - | - |
| 6 | Filling with Stone Dust below footpath including cost & conveyance of sand to work site, labour for filling, watering and compacting by tamping with all leads for water and all other incidental charges etc. complete as per relevant standard specifications. | 271 | cubic meter | - | - |
| 7 | Vibrated reinforced cement concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification for PILECAPS UNDER RETAINING WALL as per Sections 1100,1500 & 1700 of MORT&H Specifications (Fifth Revision). | 1,219 | cubic meter | - | - |
| 8 | Vibrated reinforced cement concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete for RETAINING WALL, VUP BOX as per Sections 1500,1700 & 2200 of MORT&H Specifications (Fifth Revision). | 2,881 | cubic meter | - | - |
| 9 | Vibrated reinforced Cement Concrete of grade M40 (Design mix) using 20mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site,but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying, curing concrete, working at heights, potable water, hire charges for tools and plants, including all other incidental charges, etc., complete for CRASH BARRIER ON RETAINING WALL as per Sections 811,1700 &2703.3 of MORT&H Specifications (Fifth Revision). | 313 | cubic meter | - | - |
| 10 | Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for Retaining walls including costs and conveyance of all materials to work site and labour charges for fixing , etc., complete to drain the backfill as per Section 2706 of MORT&H Specifications (Fifth Revision). | 762 | Number | - | - |
stage.html
html • 0.04 MB
techsummary_784863.pdf
BOQ Comparative Chart
xlsx
finsummary_784863.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_784863.xls
BOQ • 0.36 MB
Pricebid.pdf
Tender Documents • 0.80 MB
PQFinal.pdf
Tender Documents • 0.48 MB
Drawings.pdf
Additional Documents • 2.46 MB
corrigendum.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .