| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹7.4 L (4.47%)Admitted-Finance | ₹1.7 Cr+₹7.4 L (4.47%) | L2 | Admitted-Finance |
| 3 | L3₹1.8 Cr+₹15.6 L (9.41%)Admitted-Finance | ₹1.8 Cr+₹15.6 L (9.41%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Sharada Electricals L1 | M.K.S Enterprises L2 | M/s Ayush Enterprises L3 |
|---|---|---|---|---|---|---|
| 1.00Supply of following Decentralized materials at the works site as per RESSPO norms. | ||||||
| 1.01 | Exctention Bracket (Provided by Contractor) | 48 | No. | 1,200 ₹57,600 Lowest | 2,500 ₹1,20,000 | 2,150 ₹1,03,200 |
| 1.02 | Stone pad 300x300x75 mm (Provided by Contractor) | 174 | No. | 120 ₹20,880 | 175 ₹30,450 | 16 ₹2,784 Lowest |
| 1.03 | X-arms holding clamps with bolts & nuts. (Provided by Contractor) | 25 | No. | 150 ₹3,750 | 175 ₹4,375 | 145 ₹3,625 Lowest |
| 1.04 | F-bracket with bolts & nuts (Provided by Contractor) | 22 | No. | 250 ₹5,500 Lowest | 350 ₹7,700 | 450 ₹9,900 |
| 1.05 | All. Lugs (Provided by Contractor) | 396 | Kg. | 250 ₹99,000 Lowest | 350 ₹1,38,600 | 450 ₹1,78,200 |
| 1.06 | M.S clamp for Top, T-off channel with bolts & nuts (Provided by Contractor) | 322 | No. | 210 ₹67,620 Lowest | 265 ₹85,330 | 325 ₹1,04,650 |
| 1.07 | Copper L-Pice 50x225x10mm (Provided by Contractor) | 60 | Mtr. | 125 ₹7,500 Lowest | 210 ₹12,600 | 255 ₹15,300 |
| 1.08 | Copper L-Pice 62x225x12mm (Provided by Contractor) | 60 | Mtr. | 125 ₹7,500 Lowest | 210 ₹12,600 | 255 ₹15,300 |
| 1.09 | Z- Clamps (Provided by Contractor) | 76 | No. | 251 ₹19,076 Lowest | 365 ₹27,740 | 800 ₹60,800 |
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
4 Apr 2024, 1:00 pmClosed
SUPERINTENDING ENGINEER EDC Mirzapur
SUPERINTENDING ENGINEER EDC Mirzapur
Supply of De-centralized materials and work for Increasing capacity Power Transformer, Increasing capacity 11/0.4 kV substation, Installation of 11/0.4 kV substation,Replacement of Damaged 33/ 11 kV line Mirzapur in additional B.P 24-25 EDD-II MZP
2024_PVVNV_919067_1
97/EDC(M)/23-24
Open Tender
Electrical Works
Lump-sum
90 days
SUPERINTENDING ENGINEER EDC Mirzapur
Please refer tender
2 documents required · 2 mandatory
₹5,900
Executive Engineer(A)
₹1.7 L
SUPERINTENDING ENGINEER EDC Mirzapur
10 May 2024
18 Mar 2024
5 Apr 2024
18 Mar 2024
4 Apr 2024
18 Mar 2024
20 Mar 2024
Amount
Supply of following Decentralized materials at the works site as per RESSPO norms.
Exctention Bracket (Provided by Contractor)
Stone pad 300x300x75 mm (Provided by Contractor)
X-arms holding clamps with bolts & nuts. (Provided by Contractor)
F-bracket with bolts & nuts (Provided by Contractor)
All. Lugs (Provided by Contractor)
M.S clamp for Top, T-off channel with bolts & nuts (Provided by Contractor)
Copper L-Pice 50x225x10mm (Provided by Contractor)
Copper L-Pice 62x225x12mm (Provided by Contractor)
Z- Clamps (Provided by Contractor)
P.G clamps for weasel conductor (Provided by Contractor)
Danger board with clamp & bolts (Provided by Contractor)
Dead end clamp for pole/bracket with nuts & bolts (Provided by Contractor)
I Hook ( for dead end Clamp) (Provided by Contractor)
Suspension clam with nuts & bolts (Provided by Contractor)
I Hook ( for suspension Clam) (Provided by Contractor)
M.S clamp with nuts bolts painted with redoxide (Provided by Contractor)
All. Binding wire 6 mm (Provided by Contractor)
Distribution boxes/Kiosk for LT pole/bracket with clamp & nut bolt (Provided by Contractor)
LT Fuse Set (Provided by Contractor)
11 KV Cable jointing Kit O/G, I/C (Provided by Contractor)
Cartage of following materials from ESC, Mirzapur to work site including loading & unloading charge.
ST Pole 11 Mtr long (Provided by Department)
PCC Pole 9 Mtr long (Provided by Department)
ACSR Dog Conductor (Provided by Department)
ACSR Weasal Conductor (Provided by Department)
Arial Bunch Cable 3x120+95+1x16 mm2 (Provided by Department)
11 KV XLPE Cable size 185 mm2 (Provided by Department)
11 KV XLPE Cable size 120 mm2 (Provided by Department)
11 KV XLPE Cable size 70 mm2 (Provided by Department)
33 KV XLPE Cable size 3x300 mm2 (Provided by Department)
33 KV XLPE Cable size 120 mm2 (Provided by Department)
Cartage of all Line Materials LT/11 /33 and All Size LT PVC Cable
T/F 63 KVA 11/0.4 KVA (Provided by Department)
T/F 100 KVA 11/0.4 KVA (Provided by Department)
T/F 250 KVA 11/0.4 KVA (Provided by Department)
10 MVA Transformer (Provided by Department)
Erection
Erection of single support ST11 mtr and PCC 9 mtr pole for construction of 33 KV/11 KV /LT line including digging of pit, fitting of all accessories, back filling of earth & others required work.
Erection of Double Pole Structure for DP STpole11 MTR including fitting of accessories,
Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Earthing of Poles
Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering.
Stringing & sagging of 3 phase 33 KV line upto proper sag including laying with 3x120XLPE cable Overhead
Stringing & sagging of 3 phase 11 KV line upto proper sag including laying with 3x120XLPE cable Overhead Double CKT
Stringing & sagging of 3 phase 11 KV line upto proper sag including laying with 3x70XLPE cable Overhead Double CKT
Laying, Streaching of Arial Bunch Cable size 3x120+95+1x16 mm2 as per RESSPO norms(double Ckt)
Instalation of 10 MVA T/F
Laying of 33 KV Cable including cost of sand & Bricks
Instalation of 250 KVA T/F
Well type earthing of 250 KVA Transformer by using B class G.I. pipe of 1.5 " dia and making hand pipe type earth boring IInd strata of water or 60 ft. whichever is deeper about 6" of G.I. pipe shall remain above ground level 2 No. G.I. earth clamp shall also be welded to the portion of pipe which is above the ground level. Through this G.I. Clamp and G.I. Strip 30x5mm duly galvanized shall be connected with nut & bolts. Every DT shall have 2 such earthing, One earthing for T/F neutral and second earthing for T/F body. All requred materials shall by provided by the contractor.
Construction of Transformer plinth for 250 KVA Transformer of 2x2x1.5 mtr. Including the work of excavation for foundation of plinth plastering of walls and finishing including cost of all materials.
Fencing of 250 KVAT/F with M.S. Square mesh welded/fixed on M.S. Angle of size 65x65x6 mm with gate hinges & shutter assembly, of over all size 3x3x2.5 mtr as per drawing
Instalation of 100 KVA T/F
Instalation of 63 KVA T/F
Recived Back Side to store 5 MVA T/F
Recived Back Side to store 100 KVA T/F
Recived Back Side to store 63 KVA T/F
Recived Back Side to store 25 KVA T/F
M.K.S Enterprises
M/s Ayush Enterprises
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
TDno.pdf
Tender Documents • 0.19 MB
BOQ_1588163.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .