Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-Finance | ₹3.2 L | L1 | Accepted-Finance L1 |
| 2 | L2₹3.2 L+₹5,833.98 (1.84%)Rejected-Finance | ₹3.2 L+₹5,833.98 (1.84%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.3 L+₹11,228.05 (3.54%)Rejected-Finance | ₹3.3 L+₹11,228.05 (3.54%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Ramanujam L3 | M K NASIRUDEEN L1 | SIVARAJ V L2 |
|---|---|---|---|---|---|---|
| 1.10 | Earth work excavation for Foundation with ordinary soil and subsoil's except hard rock requiring blasting and depositing the excavated earth on bank with initial lead and lift etc., complete | 5 | m3 | 188 ₹940 | 184 ₹920 Lowest | 184 ₹920 Lowest |
| 2.00 | Centering for sides and sofits with out strutting including shuttering and strutting etc., using Ms sheets complete including all material and labour charges etc., complete complying with standard specifications and as directed by the departmental officers | 40 | m2 | 448 ₹17,920 | 319 ₹12,760 Lowest | 441 ₹17,640 |
| 3.00 | Reinforced Cement concrete M25 (Design mix) mix 40mm and ISS gauge HBG metal including cost and conveyance of all materials to site and all other initial charges etc., complete as per std.specification. | 8.25 | m3 | 11,220 ₹92,565 | 11,020 ₹90,915 Lowest | 11,023 ₹90,939.75 |
| 4.00 | Plain Cement concrete 1:4:8 one cement four M-sand and eight aggregate) mix using 40mm and ISS gauge HBG metal including cost and conveyance of all materials to site and all other initial charges etc., complete as per std.specification. | 1.5 | m3 | 7,508 ₹11,262 | 7,375 ₹11,062.5 Lowest | 7,376 ₹11,064 |
| 5.00 | Plain Cement concrete M20 mix (one cement, one and half M sand and three aggregates) using 20mm ISS HBG metal including cost and conveyance of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS | 12.6 | m3 | 8,818 ₹1,11,106.8 | 8,660 ₹1,09,116 Lowest | 8,663 ₹1,09,153.8 |
| 6.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 495 | kg | 90 ₹44,550 | 89 ₹44,055 Lowest | 89 ₹44,055 Lowest |
| 7.00 | Goods & Services Tax (GST) 18% | 0.01 | Tax | 0.18 - Lowest | - | - |
Tender Value
₹3.9 L
EMD Value
₹3,900
Closing Date
9 Mar 2026, 3:00 pmClosed
Commissioner,Nelliyalam municipality
Nelliyalam Municipality,Pandalur
General Fund - Improvements to the CC Footpath at ward No.12 Devala Valavayal master house to Gnanprakasam House (067012L123) in Nelliyalam Municipality
2026_MAWS_670223_1
2947/E1/2025
Open Tender
Civil Works
Works
Nelliyalam Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,900
Yes
8 Jun 2026
4 Mar 2026
9 Mar 2026
4 Mar 2026
9 Mar 2026
4 Mar 2026
4 Mar 2026 - 9 Mar 2026
Earth work excavation for Foundation with ordinary soil and subsoil's except hard rock requiring blasting and depositing the excavated earth on bank with initial lead and lift etc., complete
Centering for sides and sofits with out strutting including shuttering and strutting etc., using Ms sheets complete including all material and labour charges etc., complete complying with standard specifications and as directed by the departmental officers
Reinforced Cement concrete M25 (Design mix) mix 40mm and ISS gauge HBG metal including cost and conveyance of all materials to site and all other initial charges etc., complete as per std.specification.
Plain Cement concrete 1:4:8 one cement four M-sand and eight aggregate) mix using 40mm and ISS gauge HBG metal including cost and conveyance of all materials to site and all other initial charges etc., complete as per std.specification.
Plain Cement concrete M20 mix (one cement, one and half M sand and three aggregates) using 20mm ISS HBG metal including cost and conveyance of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Goods & Services Tax (GST) 18%
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_805448.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .