Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹62.9 L
EMD Value
₹63,000
Closing Date
21 Oct 2026, 4:00 pm7d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SuperintendingEngineer Ganjam RandB DivNoIBAM
O/O SuperintendingEngineer Ganjam RandB DivNoIBAM
Construction of RCC Ramp at Trauma Care Center G plus1 for Fire Safety Measures of MKCG Medical College and Hospital Berhampur Buildings
2026_EICCL_143413_1
SE (R and B) Divn. I BAM No.20/2026-27
Open Tender
Civil Works - Buildings
Percentage
90 days
Ganjam
2 documents required · 2 mandatory
₹10,000
₹63,000
Yes
13 Oct 2026
13 Oct 2026
22 Oct 2026
13 Oct 2026
21 Oct 2026
13 Oct 2026
13 Oct 2026 - 21 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation in all kinds of soil including hard moorum, stony earth mixed with boulders (except sheet rock and boulders requiring blasting) with all leads and lifts including dressing and levelling the bed and depositing the excavated earth at places away from worksite with all leads and lifts including cost of all labour and T&P cess and dewatering if required for the work etc. complete and as directed by the Engineer-in-charge. | 122.52 | cum | 311.52 | ₹38,167.43 |
| 2 | Carriage of earth by mechanic means with cost of all leads and lift upto 5.00 km including with cost conveyance cess and royalties of all materials and labour with T&P required for the work etc. complete | 129.4 | cum | 276.01 | ₹35,715.69 |
| 3 | Filling in foundation and plinth with SAND well watered and rammed in 23.5 (9'') thick layers with all leads and lifts with cost conveyance, cess and royalities of materials and labour with T&P with cost, conveyance for the work etc. complete as directed by the engineer in charge (measurement will be taken on finished compacted section only) | 52.45 | cum | 822.46 | ₹43,138.03 |
| 4 | Cement concrete of proportion (1:3:6) in foundation and floors using 4cm (3.2) size clean hard black broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15cm (6) thick to the required level ramming watering and curing etc. complete including cost conveyance and royalties of all materials and labour with T&P required for the work etc. complete including dewatering if required. | 52.45 | cum | 5,991.05 | ₹3,14,230.57 |
| 5 | R.C.C. work (1:1.5:3) M-25 having minimum compressive strength in work test of 200kg/square meter in 15cm cubes at 28 days after mixing and tests conducted in accordance with IS 456 and 516 using 12mm to 20mm size (20mm not to exceed 25%) hard black broken granite stone chips of approved quality and from approved quarry including hoisting lowering laying and compacting concrete, watering and curing for 4 weeks centring, shuttering and finishing the exposed surfaces smooth providing grooves to beads where necessary, providing drip cess and proper randy the joint with wall surface where necessary and providing fan hooks as per requirement and ceiling smooth to receive white washing or painting including cost, conveyance, royalties, of all materials and labour with T&P required for the work etc .complete in all respect but excluding cost of binding wire of 18 to 20 gauge and labour charges for straightening cutting bending binding and laying the grills and placing in proper position etc. complete as per specification and direction of the Engineer-in-charge. COLUMN BASE | 23.8 | cum | 6,790.7 | ₹1,61,618.66 |
| 6 | Plinth Bend | 11.57 | cum | 7,665.14 | ₹88,685.67 |
| 7 | Column G.F | 17.13 | cum | 16,173.6 | ₹2,77,053.77 |
| 8 | Column F.F | 15.81 | cum | 17,629.5 | ₹2,78,722.4 |
| 9 | Beam G.F | 11.56 | cum | 16,173.6 | ₹1,86,966.82 |
| 10 | Beam F.F | 11.56 | cum | 17,629.5 | ₹2,03,797.02 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.96 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_613798.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .