Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹73.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹86.0 L+₹12.5 L (17.1%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹89.8 L+₹16.4 L (22.3%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹83.9 L+₹10.4 L (14.2%)Admitted-Finance I G NAGAR JAGATHPURA JAIPUR RAJ 30201 | 30201 | L4 | Admitted-Finance |
Tender Value
₹1 Cr
EMD Value
₹2 L
Closing Date
5 Mar 2026, 3:00 pmClosed
ACE CIVIL JPD JAIPUR
BANI PRAK NEAR RAM MANDIR JAIPUR
Construction of sub-division office bldg., and app. road, bore well, store and other misc. civil work at Bandikui Rural.
2026_JVVNL_539288_1
ACE CIVIL E-NIT 35/2025-26
Open Tender
Civil Works
Percentage
300 days
BANDIKUI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
AO (O AND M) JVVNL, ALWAR
₹2 L
Yes
XEN CIVIL ALWAR
9 Mar 2026
17 Feb 2026
6 Mar 2026
17 Feb 2026
5 Mar 2026
17 Feb 2026
17 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.001 | PART-A (Bldg.) | - | - | - | - |
| 1 | 1.8
E/W in excavation by mechanical means (hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5m in which or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering &ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils. | 230 | Cum | 178 | ₹40,940 |
| 2 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.
(A) 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). (3.1.6) | 81 | P.cum | 3,302 | ₹2,67,462 |
| 3 | RR stone masonry for with hard stone in foundation and plinth in CSM above 30cm thick wall in CM 1:6 (1cement :6 Sand) (6.1.6) | 36 | Cum | 2,838 | ₹1,02,168 |
| 4 | 4.1
Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement.
M20 grade Nominal Mix / Design Mix | 83 | Cum | 4,934 | ₹4,09,522 |
| 5 | 4.9
Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | 245 | Sqm | 157 | ₹38,465 |
| 6 | 4.2
"Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcement for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc.
M20 grade Nominal Mix / Design Mix " | 111 | Cum | 5,609 | ₹6,22,599 |
| 7 | 4.3
Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for Beams, suspended floors, roofs, griders having slopes up to 15º, landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral staircases etc.
M20 grade Nominal Mix / Design Mix | 87 | Cum | 5,185 | ₹4,51,095 |
| 8 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :
(A) Columns, pillars, posts and struts etc. (4.10.3) | 260 | Sqm | 375 | ₹97,500 |
| - | (B) Walls (any thickness) including attached pilasters, buttresses plinth and string course. (4.10.1) | 675 | Sqm | 289 | ₹1,95,075 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
BOQ_961568.xls
BOQ • 0.53 MB
CORR_BANDIKUI_NEW.pdf
PDF • 0.41 MB
CORR.pdf
PDF • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .