| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹46.9 LAdmitted-Finance | -18.55% | ₹46.9 L | L1 | Admitted-Finance |
| 2 | L2₹47.2 L+₹32,239.53 (0.69%)Admitted-Finance | -17.99% | ₹47.2 L+₹32,239.53 (0.69%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Rejected due to not submit proper authorization |
Tender Value
₹57.6 L
EMD Value
₹57,600
Closing Date
24 Mar 2026, 4:00 pmClosed
SE R and B Division No I Berhampur
SE R and B Division No I Berhampur
Construction of Gents Hostel (1st floor ) inside KATS college, Ankushpur
2026_EICCL_127390_1
SE R and B Divn NoI Bam 68/2025-26
Open Tender
Civil Works - Buildings
Percentage
120 days
Berhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹57,600
Yes
3 Jul 2026
18 Mar 2026
25 Mar 2026
18 Mar 2026
24 Mar 2026
18 Mar 2026
18 Mar 2026 - 24 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Civil work:-Fly Ash Brick masonry in C.M. (1:6) using 9" size using of 23cmx11cmx8cm size brick in Super Structure having a crushing strength of not less than 75 kg per Sq.cm including splays, cuttings, circular moldings, watering & curing for 7 days, cost, conveyance, royalties of all materials, labour with T&P etc. complete in all respect as directed by the Engineer-in-charge | 101.68 | Cubic Meters | 6,194.44 | ₹6,29,850.66 |
| 2 | R.C.C. M-20 grade including cost of all materials, cost of labour, machinery, T&P charges for suspended type staging / centering & shuttering suported on girders with MS bracket arrangement for cantilever portion as per approved Drawing & Technical Specifications and as per Section -1500, 1700 & 2300 of MoRT&H Specifications for Road & Bridge works (5th Revision) COLUMN | 9.55 | Cubic Meters | 17,342.8 | ₹1,65,623.74 |
| 2.01 | Lintel | 7.14 | Cubic Meters | 14,996.2 | ₹1,07,072.87 |
| 2.02 | ROOF SLAB | 52.29 | Cubic Meters | 14,347.6 | ₹7,50,236 |
| 2.03 | Roof Beam | 17.2 | Cubic Meters | 17,342.8 | ₹2,98,296.16 |
| 2.04 | Chajja | 26.2 | Square Meters | 1,274.2 | ₹33,384.04 |
| 2.05 | Stair case | 2.49 | Cubic Meters | 17,139.8 | ₹42,678.1 |
| 8 | Cutting, straightening coiled or bent up M.S. Rod or tor steel of SAIL/ TATA / RINL (VIZAG) make including bending, binding, welding and joining if necessary and tying the grills and placing in position as required for R.C.C. Work and for providing fan hooks as required, hoisting, lowering, laying including cost, conveyances, taxes of M.S. Rod or tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all floors (Linear measurement will be taken and quantity will be calculated basing on the standard weight of B.I.S. for M.S. Rods or tor steel only. Wastage if any, including weight of binding wire will not be considered for measurement) etc. complete as per specification & direction of Engineer-in-charge. | 110.08 | Quintal | 9,012.3 | ₹9,92,073.98 |
| 9 | Providing 16 mm thick C.P. with C.M. (1:6) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties of all materials with cost of all labour, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge. | 580.55 | Square Meters | 297.29 | ₹1,72,591.71 |
| 10 | Providing 12 mm thick cement plaster with cement mortar of mix (1:6) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties of all materials with cost of all labour,labour cess, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge. | 642.72 | Square Meters | 204.08 | ₹1,31,166.3 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_585578.xls
BOQ • 3.68 MB
1.pdf
Tender Documents • 1.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .