Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical All document complete |
| 2 | Accepted-Technical | Accepted-Technical All document complete |
| 3 | Accepted-Technical | Accepted-Technical All document complete |
| 4 | Accepted-Technical STAKMO | Accepted-Technical All document complete |
Tender Value
₹12.2 L
EMD Value
₹24,300
Closing Date
12 Jun 2026, 2:00 pmClosed
Executive Engineer REW Leh
REW Leh
Infrastructure Development at Leh Castle (Tsemo Khar)
2026_RDD_19014_2
17- UTL REW Leh of 2026-27
Open Tender
Civil Works - Others
Percentage
30 days
Leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹121
Payable To Executive Engineer REW Leh
₹24,300
16 Jun 2026
2 Jun 2026
15 Jun 2026
2 Jun 2026
12 Jun 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
All Kind of soil | 4.38 | cum | 208.42 | ₹912.88 |
| - | Earth work inexcavation by mechanical means (Hydraulicexcavator) overareas (exceeding 30cm in depth,1.5min width aswellas 10sqm on plan) including getting out and disposal of excavated earth lead upto 50m and liftupto 1.5m,as directed by Engineer-in-charge. 2.7.1 All kinds of soil | 169.8 | cum | 383.88 | ₹65,182.82 |
| - | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12(1cement :6coarsesand:12graded stone aggregate 20 mm nominal size) upto plinth level with : 7.1.1 Cement mortar 1:6 (1 cement : 6 coarse sand) | 32.36 | cum | 5,730.38 | ₹1,85,435.1 |
| - | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size). | 18.11 | cum | 486.19 | ₹8,804.9 |
| - | Providing & fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position in cement mortar 1:3 (1cement:3 coarse sand), cost of required centring, shuttering and curing complete 1:3:6 (1 cement : 3 coarse sand : 6 graded crushed stone aggregate 20 mm nominal size) | 15.11 | cum | 14,111.48 | ₹2,13,224.46 |
| - | 15 mm cement plaster on the rough side of single or half brick wall of mix : 13.2.1 1:4 (1 cement: 4 fine sand) | 154.98 | sqm | 359.59 | ₹55,729.26 |
| - | Providing and applying white cement based putty of average thickness 1 mm of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | 154.98 | sqm | 142.74 | ₹22,121.85 |
| - | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade : 13.41.1 Newwork(twoormorecoats)overandincludingwaterthinnableprimingcoat with cement primer | 154.98 | sqm | 157.36 | ₹24,387.65 |
| - | French spirit polishing : Two or more coats on new works including a coat of wood filler | 27.23 | sqm | 380.61 | ₹10,364.01 |
| - | Steel work welded inbuiltup sections/framed work, including cutting,hoisting, fixing in position and In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 378 | kgs | 180.24 | ₹68,130.72 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.91 MB
BOQ_45364.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .