Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹2.3 LAccepted-AOC 232 PATEL CHOWK PHUSRO BAZAR BOKARO 829104 | BOKARO | JHARKHAND | 829104 | ₹2.3 L | l1 | Accepted-AOC l1 |
| 2 | l2₹2.4 LRejected-Finance AT BALU BANKER PO BERMO DIST BOKARO 825102 | BOKARO | JHARKHAND | 825102 | ₹2.4 L | l2 | Rejected-Finance l2 |
| 3 | l3₹2.4 LRejected-Finance AT JANTA NAGAR BOKARO THERMAL DIST BOKARO PIN 829107 | BOKARO | JHARKHAND | 829107 | ₹2.4 L | l3 | Rejected-Finance l3 |
| Sl No | Description | Qty | Unit | M/S UPENDRA ELECTRICAL L2 | M/S SINGH ENTERPRISES L3 | SANJAY KUMAR TIWARI L1 |
|---|---|---|---|---|---|---|
| 1.01 | Dismantling of 8" dia M/S Pipeline (29 nos. x 6.15 m = 178.35 m) | 178.35 | metre | 150 ₹26,752.50 | 155 ₹27,644.25 | 148.36 ₹26,460.01 |
| 1.02 | Laying of 8" dia G.I. Pipeline (31 nos. x 6.15 m = 190.65 m) | 190.65 | metre | 200 ₹38,130 | 205 ₹39,083.25 | 196.6 ₹37,481.79 |
| 1.03 | Loading and unloading including transporting of 8" dia G.I. Pipeline | 31 | no. | 370 ₹11,470 | 380 ₹11,780 | 365.5 ₹11,330.50 |
| 1.04 | Cutting of 8" dia M.S./ G.I. Pipes for smooth surface making as required for flange (one side = 27") | 1,674 | inch | 13.5 ₹22,599 | 14 ₹23,436 | 13.18 ₹22,063.32 |
| 1.05 | Double layer welding of 8" dia M.S./ G.I. Pipes | 3,348 | inch | 16.5 ₹55,242 | 17 ₹56,916 | 16.13 ₹54,003.24 |
| 1.06 | Supply of G.I. Flange 08" dia (H.D.) | 48 | no. | 1,155 ₹55,440 | 1,190 ₹57,120 | 1,152.85 ₹55,336.80 |
| 1.07 | Making and fixing of Rubber Joints | 56 | no. | 125 ₹7,000 | 130 ₹7,280 | 123.08 ₹6,892.48 |
| 1.08 | Laying of 8" dia Sluice Valve/ NR Valve/ Foot Valve | 3 | no. | 880 ₹2,640 | 900 ₹2,700 | 879 ₹2,637 |
| 1.09 | Providing and fixing of M.S. Nut & Bolts | 220 | set | 21 ₹4,620 | 25 ₹5,500 | 20.88 ₹4,593.60 |
| 1.10 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth,1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50m and for all lift, as directed by Engineer-in- charge. (All kinds of soil) | 90 | sqm | 145 ₹13,050 | 150 ₹13,500 | 140.72 ₹12,664.80 |
Tender Value
₹2.5 L
EMD Value
₹3,200
Closing Date
7 Apr 2025, 11:55 amClosed
PE EnM Karo OCP
OFFICE OF PE EnM Karo OCP
Dismantling, repairing and laying of the 8 inch dia M.S. Pipes of the delivery pipeline of the 2000 G.P.M. Pump Motor Set, in operation at the H Patch in Mine, w.r.t. Karo OCP, under BnK Area
2025_CCL_333444_1
P.E. (EnM)/ Karo OCP/ e-tender/ 2024-25/ 125
Open Tender
Electrical and Maintenance Works
5 days
KARO OCP
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,200
14 Mar 2026
28 Mar 2025
8 Apr 2025
28 Mar 2025
7 Apr 2025
28 Mar 2025
28 Mar 2025 - 7 Apr 2025
Amount
Dismantling of 8" dia M/S Pipeline (29 nos. x 6.15 m = 178.35 m)
Laying of 8" dia G.I. Pipeline (31 nos. x 6.15 m = 190.65 m)
Loading and unloading including transporting of 8" dia G.I. Pipeline
Cutting of 8" dia M.S./ G.I. Pipes for smooth surface making as required for flange (one side = 27")
Double layer welding of 8" dia M.S./ G.I. Pipes
Supply of G.I. Flange 08" dia (H.D.)
Making and fixing of Rubber Joints
Laying of 8" dia Sluice Valve/ NR Valve/ Foot Valve
Providing and fixing of M.S. Nut & Bolts
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth,1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50m and for all lift, as directed by Engineer-in- charge. (All kinds of soil)
Total impact of GST for the purpose of CTC
M/S UPENDRA ELECTRICAL (BID ID -1147450)
M/S SINGH ENTERPRISES (BID ID -1147456)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid