| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAdmitted-Finance | ₹2.2 Cr | L1 | Admitted-Finance |
| 2 | L1₹2.2 CrAdmitted-Finance | ₹2.2 Cr | L1 | Admitted-Finance |
| 3 | L2₹3.8 Cr+₹1.6 Cr (71.5%)Admitted-Finance | ₹3.8 Cr+₹1.6 Cr (71.5%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GANGA ELECTRICALS L2 | M/S Ajay Tripathi L1 | KHAN ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 0.00Installation of additional 250 KVA, 11/0.4KV new T/F with tray at DP with accessories, Capacity enhancement Replacement of Jarjar/Damaged AB Cable, 11KV Feeder Bifurcation, Guarding of line and other System Improvement Works at various Substations under EUDC-I, Prayagraj under the Business Plan 2024-25 (Phase-II), including loading, unloading & Carriage of materials from Store Centre Naini to work site. In the direct supervision of E.E., EUDD-RB/Naini/KD/KB, Prayagraj. | ||||||
| 1.00 | Erection, grouting, plinthing, earthing & Painting of 11 Mtr. long STP Double pole including fixing of all necessary clamps, other accessories like Top channel, base channel, Pin insulator with pin etc. and its grouting in ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr. with cement, coarse sand & brick blast in ratio 1:4:8 and 12 mm thick plastering around the plinth in ratio 1:2:4 with 12 mm thickness curing of plinth should be done properly for 11 KV line (Grouting, plinthing & required materials like Clamps, Stone pad, nut & bolt, M.S. Channel, Base Channel, M.S. Bracing Angle etc. as per site requirement will be arranged by the contractor and STP, Earthing Rod with G.I. wire, pin insulator with pin and Disc Insulator with Fitting will be provided by the department.) | 32 | No. | 35,999 ₹11,51,968 | 28,888 ₹9,24,416 Lowest | 29,000 ₹9,28,000 |
| 2.00 | Erection, grouting, plinthing, earthing & Painting of 9 Mtr. long STP Single pole including fixing of all necessary clamps and its grouting in ratio 1:4:8, cement, stone grit & coarse sand, (Grouting,& all required materials will be provided by contractor except 9 Mtr STP) | 8 | No. | 9,999 ₹79,992 | 8,888 ₹71,104 | 8,500 ₹68,000 Lowest |
| 3.00 | Erection, grouting, plinthing & earthing of 8.5/9 Mtr. long PCC Single pole including fixing of all necessary clamps and its grouting in ratio 1:4:8, cement, stone grit & coarse sand, (Grouting,& all required materials will be provided by contractor except 8.5/9 Mtr PCC) | 471 | No. | 11,999 ₹56,51,529 | 6,888 ₹32,44,248 | 6,800 ₹32,02,800 Lowest |
| 4.00 | Erection, grouting, plinthing, earthing & Painting of 11 Mtr. long STP Single pole for cable hanging including fixing of all necessary clamps, side bracket/channel and Stringing of stay wire 7/10 SWG with turn buckle at each pole for hanging of 11 KV XLPE Cable its grouting in ratio 1:4:8, cement, stone grit & coarse sand, (Grouting,& all required materials will be provided by contractor except 11 Mtr STP) | 8 | No. | 9,999 ₹79,992 | 6,888 ₹55,104 Lowest | 7,000 ₹56,000 |
| 5.00 | Installation & commissioning of T/F 100/250 KVA along with tray with accessories, HT/LT connections including DO, GO & 11 KV TPMO set Complete in all respect At DP. (All materials will be provided by the contractor at his own cost. Only T/F will be provided by the Department.) | 33 | No. | 30,999 ₹10,22,967 | 28,888 ₹9,53,304 Lowest | 29,000 ₹9,57,000 |
| 6.00 | Chemical pipe Earthing of Transformer body and neutral by lowering of GI pipe of size 1.50” dia 10’ deep, connecting with GI Strip of size 50x6 mm with clamp. (All materials will be provided by the contractor at his own cost.) | 66 | Job | 9,999 ₹6,59,934 | 8,888 ₹5,86,608 Lowest | 9,000 ₹5,94,000 |
| 7.00 | Supply and installation of LT Distribution Box complete with 4 no. Alluminium Busbar capacity 800Amp, 1100 Volt with MCB built in each phase capacity of MCB 400 Amp covered with box with indication ISI Mark. | 10 | Job | 40,999 ₹4,09,990 Lowest | 48,888 ₹4,88,880 | 47,800 ₹4,78,000 |
| 8.00 | Installation, grouting and commissioning of L.T. tailless unit 1 no 500 amp and 3 no 300amp for each transformer with cubical Box at DP/land with grouting. (All materials will be arranged by the contractor at his own cost.) | 23 | Job | 55,999 ₹12,87,977 | 48,888 ₹11,24,424 | 47,000 ₹10,81,000 Lowest |
| 9.00 | Earthing of L.T. Cubical box by M.S. earthling rod and connecting with G.I. Strips of size 50x6 mm with clamp for neutral & L.T. cubical box body. (Only M.S. Earthing rod with G.I. Wire will be provided by the Department and all other required materials will be provided by the contractor at his own cost.) | 33 | Job | 1,599 ₹52,767 Lowest | 2,888 ₹95,304 | 2,800 ₹92,400 |
Tender Value
₹2.3 Cr
EMD Value
₹4.5 L
Closing Date
15 Apr 2024, 2:00 pmClosed
Superintending Engineer
Superintending Engineer, E.U.D.C.-1, 57, George Town, Prayagraj
Refer to Tender Description
2024_PVVNV_919893_1
55/SE/EUDC-I-Pra/2023-24
Open Tender
Electrical Works
Lump-sum
180 days
Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Yes
Account Number-0012002100504911
₹4.5 L
Yes
29 Apr 2024
22 Mar 2024
15 Apr 2024
22 Mar 2024
15 Apr 2024
22 Mar 2024
Amount
Installation of additional 250 KVA, 11/0.4KV new T/F with tray at DP with accessories, Capacity enhancement Replacement of Jarjar/Damaged AB Cable, 11KV Feeder Bifurcation, Guarding of line and other System Improvement Works at various Substations under EUDC-I, Prayagraj under the Business Plan 2024-25 (Phase-II), including loading, unloading & Carriage of materials from Store Centre Naini to work site. In the direct supervision of E.E., EUDD-RB/Naini/KD/KB, Prayagraj.
Erection, grouting, plinthing, earthing & Painting of 11 Mtr. long STP Double pole including fixing of all necessary clamps, other accessories like Top channel, base channel, Pin insulator with pin etc. and its grouting in ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr. with cement, coarse sand & brick blast in ratio 1:4:8 and 12 mm thick plastering around the plinth in ratio 1:2:4 with 12 mm thickness curing of plinth should be done properly for 11 KV line (Grouting, plinthing & required materials like Clamps, Stone pad, nut & bolt, M.S. Channel, Base Channel, M.S. Bracing Angle etc. as per site requirement will be arranged by the contractor and STP, Earthing Rod with G.I. wire, pin insulator with pin and Disc Insulator with Fitting will be provided by the department.)
Erection, grouting, plinthing, earthing & Painting of 9 Mtr. long STP Single pole including fixing of all necessary clamps and its grouting in ratio 1:4:8, cement, stone grit & coarse sand, (Grouting,& all required materials will be provided by contractor except 9 Mtr STP)
Erection, grouting, plinthing & earthing of 8.5/9 Mtr. long PCC Single pole including fixing of all necessary clamps and its grouting in ratio 1:4:8, cement, stone grit & coarse sand, (Grouting,& all required materials will be provided by contractor except 8.5/9 Mtr PCC)
Erection, grouting, plinthing, earthing & Painting of 11 Mtr. long STP Single pole for cable hanging including fixing of all necessary clamps, side bracket/channel and Stringing of stay wire 7/10 SWG with turn buckle at each pole for hanging of 11 KV XLPE Cable its grouting in ratio 1:4:8, cement, stone grit & coarse sand, (Grouting,& all required materials will be provided by contractor except 11 Mtr STP)
Installation & commissioning of T/F 100/250 KVA along with tray with accessories, HT/LT connections including DO, GO & 11 KV TPMO set Complete in all respect At DP. (All materials will be provided by the contractor at his own cost. Only T/F will be provided by the Department.)
Chemical pipe Earthing of Transformer body and neutral by lowering of GI pipe of size 1.50” dia 10’ deep, connecting with GI Strip of size 50x6 mm with clamp. (All materials will be provided by the contractor at his own cost.)
Supply and installation of LT Distribution Box complete with 4 no. Alluminium Busbar capacity 800Amp, 1100 Volt with MCB built in each phase capacity of MCB 400 Amp covered with box with indication ISI Mark.
Installation, grouting and commissioning of L.T. tailless unit 1 no 500 amp and 3 no 300amp for each transformer with cubical Box at DP/land with grouting. (All materials will be arranged by the contractor at his own cost.)
Earthing of L.T. Cubical box by M.S. earthling rod and connecting with G.I. Strips of size 50x6 mm with clamp for neutral & L.T. cubical box body. (Only M.S. Earthing rod with G.I. Wire will be provided by the Department and all other required materials will be provided by the contractor at his own cost.)
Laying of 1x400/1x240/3.5x400/3.5x240 sqmm L.T. cable from T/F to L.T. Cubicle Box and from LT Cubical Box to LT Line with proper lugging and tagging with the help of copper Z/L Clamp. (Only L.T. Cable will be provided by the Department and all other required materials will be arranged by the contractor at his own cost.)
Hanging of 3x120+1x95+1x16/3x95+1x70+1x16 sqmm LT ABC on already existing/erected 8.5/9/11 mtr pole complete in all respect .(all required material for hanging of AB cable like dead end clamp , piercing connecter, suspension clamp with i-hook ,LT DB box at each pole and others required materials will be provided by the contractor as per site requirement, only LT AB cable will be provided by the department)
Hanging of XLPE 3X120/3X185/3x70 sq mm existing & Newly Constructed 8.5/9/11 Mtr. Long STP/ Rail pole with the help of Turn-buckle & stay wire at each pole. (except XLPE cable and stay wire all required material will be provided by contractor)
Laying of 11KV 3X120/3X185/3x70 sq mm cable. The cable to be laying by digging of trench of size 1050mm deep 750mm wide as per ISS. The cable boxing with brick, sand & stone slab after cable laying filling of trench leveling and ramming. (Only 11 KV Cable will be provided by department rest all material to be provided by contractor)
Erection & grouting of stay Rod with Cement, Sand and Bricks ballast in ratio 1:4:8 and fastening the stay wire with pole and stay rod nuzzling.
Stringing of ACSR Dog/Weasel conductor for neutral wire for LT ABC to be replaced / installed
Dismantling of existing jarjar/damaged AB Cable
Fixing of following 11 KV Heat Shrinkable Type Cable Termination kits conforming to VDE-0278/1EEE-48-1975/IS – 13573-1992 and ESI STD. 09-13 all other relevant Standards complete with all accessories for 11 KV, XLPE cable (Jointing kit will be provided by the contractor for the guarantee period of 2 Years from the date of measurement at ERP).
Outdoor jointing kit (3x70 mm2, 11 KV)
Outdoor jointing kit (3x120 mm2, 11 KV)
Outdoor jointing kit (3x185 mm2, 11 KV)
Outdoor jointing kit (3x300 mm2, 11 KV)
Straight through jointing kit (3×120 mm2, 11 KV)
Straight through jointing kit (3×185 mm2, 11 KV)
Carriage, erection, earthing, testing and commissioning of 11 KV panel CT ratio 400/200/5 amp
Dismantling of 100/63/25 KV TF and carriage back to store centre Naini, Prayagraj.
Guarding of 11 KV Line (Guarding Angle Channel Clamp with nut bolt will be provided by contractor).
KHAN ENTERPRISES
GANGA ELECTRICALS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .