Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.1 CrAccepted-AOC | ₹3.1 Cr Quoted ₹3.3 Cr | 1 | Accepted-AOC ACCEPTED AS L1 CONTRACTOR |
| 2 | 2₹3.4 Cr+₹11.2 L (3.40%)Rejected-AOC SF NO 454 RAGHUPATHYNAICKENPALAYAM RAILWAY COLONY POONDURAI MAIN ROAD ERODE | ERODE | ERODE | TAMIL NADU | ₹3.4 Cr+₹11.2 L (3.40%) | 2 | Rejected-AOC REJECTED SINCE RATE QUOTED ARE HIGHER THAN L1 |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
23 Jan 2024, 11:00 amClosed
SPECIAL CHIEF ENGINEER
SPECIAL CHIEF ENGINEER, PWD, BUILDINGS CONSTRUCTION AND MAINTENANCE CIRCLE, COIMBATORE
Construction of Road Formation Gradient for Institute and Residential Block for New Government Medical College at Udhagamandalam in the Nilgiris District.
2024_PWD_408725_1
33BCMCBE030124
Open Tender
Civil Works - Buildings
Lump-sum
153 days
UDHAGAMANDALAM IN NILGIRIS DISTRICT
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.6 L
5 Mar 2024
11 Jan 2024
23 Jan 2024
12 Jan 2024
23 Jan 2024
12 Jan 2024
Amount
CEMENT CONCRETE 1:5:10 [One cement, Five crushed stone sand and Ten hard broken stone] using 40 mm gauge hard broken jelly for FLOORING including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers.
Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/ms and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu'm') 7670 kg. of sand,
but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).
For Foundation and Basement
Supplying, fabricating and placing in position MILD STEEL / RIBBED TOR STEEL grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. [Contractor has to make his own arrangements for the supply of steel and binding wire]
RPP INFRA PROJECTS LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .