| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹24.4 L+₹98,316 (4.21%)Rejected-Finance | L2 | Rejected-Finance not being lowest | |
| 3 | L3₹24.5 L+₹1.2 L (5.03%)Rejected-Finance | L3 | Rejected-Finance not being lowest | |
| 4 | L4₹27.5 L+₹4.1 L (17.7%)Rejected-Finance | L4 | Rejected-Finance not being lowest | |
| 5 | L5₹28.8 L+₹5.4 L (23.1%)Rejected-Finance | L5 | Rejected-Finance not being lowest |
| Sl No | Description | Qty | Unit | SINGH CONST CO L6 | RAMAN CONSTRUCTION CO L4 | khajuria builders L2 | M/S Ashok Kumar Jaswal L7 | AKBAR FURNITURE HOUSE AND TIMBER MERCHANT L1 | M/S R S Builders L8 | VISHWANATH AND SONS L3 | M/S SUSHEEL KUMAR Govt. CONTRACTOR L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition and beaking up drain CI pipe/AC pipes/ PVC Pipe set in cement mortar 100 mm and below complete all as specified and as directed. | 285 | Running Metre | 5 ₹1,425 | 10 ₹2,850 | 10 ₹2,850 | 10 ₹2,850 | 2 ₹570 Lowest | 30 ₹8,550 | 10 ₹2,850 | 5 ₹1,425 |
| 2.00 | Demolition of Cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for complete all as specified. | 22 | Cubic Metre | 100 ₹2,200 | 100 ₹2,200 | 50 ₹1,100 Lowest | 100 ₹2,200 | 50 ₹1,100 Lowest | 100 ₹2,200 | 100 ₹2,200 | 50 ₹1,100 Lowest |
| 3.00 | Demolition of cement concrete, unreinforced, in ground floors and pavings not exceeding 15cm thickness below or above ground level, complete all as specified and as directed. | 15 | Cubic Metre | 100 ₹1,500 | 100 ₹1,500 | 50 ₹750 Lowest | 100 ₹1,500 | 50 ₹750 Lowest | 200 ₹3,000 | 100 ₹1,500 | 50 ₹750 Lowest |
| 4.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified. | 165 | Square Metre | 3 ₹495 Lowest | 20 ₹3,300 | 10 ₹1,650 | 10 ₹1,650 | 5 ₹825 | 30 ₹4,950 | 50 ₹8,250 | 5 ₹825 |
| 5.00 | Dismantling wrought iron or mild steel work of any description not otherwise provided for etc. complete all as specified. | 2.15 | Quintal | 100 ₹215 | 100 ₹215 | 100 ₹215 | 50 ₹107.5 Lowest | 100 ₹215 | 500 ₹1,075 | 50 ₹107.5 Lowest | 100 ₹215 |
| 6.00 | M&L for steel water tubing medium grade galvanised with all fittings including short lengths, fixed to walls, concealed in wall and ceiling or laid in floor complete with all fittings (such as bends, elbows, Tee, short pieces, connectors, back nuts, diminishing pieces, caps and plugs, unions etc.) of nominal bore 20 mm including taking down steel tubing with connections complete all as specified. | 195 | Running Metre | 90 ₹17,550 | 150 ₹29,250 | 60 ₹11,700 Lowest | 90 ₹17,550 | 100 ₹19,500 | 300 ₹58,500 | 150 ₹29,250 | 180 ₹35,100 |
| 7.00 | M&L for steel water tubing medium grade galvanised with all fittings including short lengths, fixed to walls, concealed in wall and ceiling or laid in floor complete with all fittings (such as bends, elbows, Tee, short pieces, connectors, back nuts, diminishing pieces, caps and plugs, unions etc.) of nominal bore 25 mm including taking down steel tubing with connections complete all as specified. | 184 | Running Metre | 130 ₹23,920 | 170 ₹31,280 | 80 ₹14,720 Lowest | 110 ₹20,240 | 100 ₹18,400 | 300 ₹55,200 | 155 ₹28,520 | 195 ₹35,880 |
| 8.00 | S&F in repair ball valves of size 20mm bore dia high pressure of PTMT with epoxy coated aluminium rod and high density plastic ball (Minimum weight not less than 210 gms) screwed for iron pipe and fixed including necessary fitting as reqd at site complete all as specified and directed by Engr-in-Charge | 160 | Each | 120 ₹19,200 | 200 ₹32,000 | 120 ₹19,200 | 400 ₹64,000 | 75 ₹12,000 Lowest | 300 ₹48,000 | 125 ₹20,000 | 230 ₹36,800 |
| 9.00 | S&F fixing in repair ball valves of size 25 mm bore dia high pressure of PTMT with epoxy coated aluminium rod and high density plastic ball (Minimum weight not less than 210 gms) screwed for iron pipe and fixed including necessary fitting as reqd at site complete all as specified and directed by Engr-in-Charge | 35 | Each | 200 ₹7,000 | 250 ₹8,750 | 200 ₹7,000 | 410 ₹14,350 | 95 ₹3,325 Lowest | 300 ₹10,500 | 150 ₹5,250 | 250 ₹8,750 |
| 10.00 | Taking down cement plaster, any description on brick or stone or cement concrete walls including raking out joints, hacking for key, scrubbing down with water complete all as specified. | 990 | Square Metre | 5 ₹4,950 | 5 ₹4,950 | 5 ₹4,950 | 5 ₹4,950 | 2 ₹1,980 Lowest | 10 ₹9,900 | 5 ₹4,950 | 4 ₹3,960 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
20 Oct 2025, 6:00 pmClosed
Col Neelima CWE
Military Engineer Services, Commander Works Engineer, Udhampur, PO - Garhi, Udhampur-182121
REPAIRS TO ROOF TREAMENT, RAIN WATER PIPES AND MISC B/R WORKS AT NCSR, CEDU, CMDC, CCOSW, HQ 1EW BDE, 135 (I)EME WKSP, 9 R/O, HELIPAD COLONY, NSOI, SORTS COMPLEX, 250 TRANSIT CAMP, BIKRAM PARK, TARAMOUNT AND AOR OF AGE B/R-II, GE (SOUTH) UDHAMPUR
2025_MES_732290_1
CWE/U(S)-57/2025-26
Open Tender
Civil Works
Item Rate
180 days
UDHAMPUR
AS PER NIT
6 documents required · 6 mandatory
₹500
GE (SOUTH) UDHAMPUR
₹80,000
19 Nov 2025
23 Sept 2025
28 Oct 2025
23 Sept 2025
20 Oct 2025
7 Oct 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Tender_57.pdf
Tender Documents • 1.73 MB
BOQ_819896.xls
BOQ • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .