Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹3.3 L+₹6,698.72 (2.06%)Accepted-Finance | L2 | Accepted-Finance ok | |
| 3 | L3₹3.6 L+₹39,172.64 (12.1%)Accepted-Finance 1008 A PREMIER ENGINEERING COMPANY PURVI RITHANI MEERUT DELHI ROAD MEERUT UTTAR PRADESH 250103 INDIA | MEERUT | UTTAR PRADESH | 250103 | L3 | Accepted-Finance ok | |
| 4 | L4₹5.7 L+₹2.5 L (76.0%)Accepted-Finance 4314 FIRST FLOOR KIKAR BAZAR BATHINDA 151001 PUNJAB | BATHINDA | BATHINDA | PUNJAB | 151001 | L4 | Accepted-Finance ok |
Tender Value
Refer Docs
Closing Date
2 Mar 2021, 11:15 amClosed
Executive Engineer (EnM) WnS (WEST)
C-2A Block Janakpuri BPS New Delhi-110058
Renovation of LT Panel at Subhash Nagar Pump House in Hari Nagar Const.
2021_DJB_200453_19
e-NIT No.23 / EnM (WEST)/ 2020-21
Open Tender
Miscellaneous Works
Works
30 days
C-2A Block Janakpuri BPS New Delhi
Please refer Tender Documents.
3 documents required · 3 mandatory
₹500
Yes
DJB Account No. 50448339804
Exempted
11 Mar 2021
23 Feb 2021
2 Mar 2021
23 Feb 2021
2 Mar 2021
23 Feb 2021
Dismantling & changing of following parts in LT panel installed at Subhash Nagar BPS by removing of defective parts & other parts i.e. indicating lights, amp. Meter etc. dismantling of all incoming & outgoing connection.
MCB Single pole 6 Amp. Make L&T/Siemens/Schineder
MCB Triple pole 63Amp. Make L&T/Siemens/Schineder
Switch disconnector fuse unit open execution with fuse links, of rating 125 Ampere, triple pole, & HRC Fuse. Make: C&S / L&T.
DIN HRC fuse links of 250 amp current rating. Make: C&S / L&T.
MCCB 415 V TP 36 KA 63Amp. Make: L&T/Schineder/L&T/GE/Siemens/ALL DJB Approved.
Protection relays having sensitive earth fault , over current, S/C protection with following features-High set elements, highly immune to harmonics, both 1A & 5A CT input in one relay, 6 output contacts, Non-volatile memory for trip indication, self monitoring facility, status indication LED display & sealable front cover to prevent unauthorized access Make: L&T
Digital Amp. Meter. –Make AE/UE/L&T
Digital Volt Meter 0-500V –Make AE/UE/L&T
Auxiliary Terminal block
U/V release 220V
Arcing contact
Indicating lights LED type RYB & On/off Make : L&T /Havells/SG
Current Transformer 800/5. Make AE /Advance
Current Transformer 1200/5. Make AE /Advance
Making of outgoing/incoming bus bar links for main & cable connection duly sleeve with heat shrinkable PVC sleeve
Bus bar Aluminum of electrolytic grade conductivity covered with heat shrinkable PVC sleeve throughout in red, yellow & blue color to identify three phases & black for neutral current carrying capacity 1000Amp. For incoming from transformer. The bus-bar support insulator made of non-deteriorating, vermin proof, non hygroscopic materials such as SMC/DMC.
Fixing of the IDMT O/C E/F relay complete with wiring and setting of protections parameters as per site requirements.
Servicing, over hauling of complete ACB of various rating installed as incomer & bus coupler (1250Amp.)& out going/spare 800Amp.(3Nos.) in panel, removal of old grease and re-greasing of all movable parts with recommended grease, setting of tripping mechanism ,re-wiring of under voltage coil ,changing of plunger of UV assembly complete servicing of ACB Fixing of above components in place of defective components as required complete with control wiring, fixing of amp. Meter, indicating lights etc. & re-installation of A.C.B. in existing LT panel complete with all incoming & out going cable connection with thimbling, setting of relay parameters for proper tripping in case of any fault..
Changing of cable terminal block, current transformer after dismantling of bus bar, fitting of CT as suitability in panel for proper functioning of amp. Meter
Insulation on bus bar of complete panel PVC Sleeve /tape as required replacement of nut bolt, support insulator as required after cleaning & de-carbonizing of bus bar.
Testing & commissioning of panel & allied accessories as per required parameters with relevant IS .testing of the panel prior to switching on as follow i) Continuity and earth testing ii) Meggaring of all equipments for phase to phase, neutral to body, neutral to earth and phase to earth. iii) checking for all tightness of nut and bolts iv) Alignments of doors etc. v) Interlocking tests. All function tests
RRPN GROUP OF SOLUTIONS
Premier Engineering Company
SANJAY SALES CORPORATION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .