Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.3 CrAccepted-AOC 308 302 1ST FLOOR LABH CHAMBERS STATION ROAD CHHATRAPATI SAMBHAJINAGAR | CHHATRAPATI SAMBHAJINAGAR | CHHATRAPATI SAMBHAJINAGAR | MAHARASHTRA | L1 | Accepted-AOC L1 | |
| 2 | L2₹54.1 Cr+₹79.6 L (1.49%)Rejected-AOC UNIT NO 301 ABH TOWN SQUARE NEAR CITY CENTER MALL NASHIK TAL AND DIST NASHIK | NASHIK | NASHIK | MAHARASHTRA | L2 | Rejected-AOC L2 | |
| 3 | L3₹55.2 Cr+₹1.8 Cr (3.42%)Rejected-AOC AURANGABAD MAHARASHTRA | AURANGABAD | CHHATRAPATI SAMBHAJINAGAR | MAHARASHTRA | L3 | Rejected-AOC L3 | |
| 4 | L4₹55.8 Cr+₹2.4 Cr (4.52%)Rejected-AOC PLOT NO 1 2 AASHIYANA CO OP SOCIETY N 11 CIDCO AURANGABAD | AURANGABAD | AURANGABAD | MAHARASHTRA | L4 | Rejected-AOC L4 | |
| 5 | L5₹56.4 Cr+₹3.1 Cr (5.74%)Rejected-AOC YOGESHWARI NAGARI RING ROAD AMBAJOGAI | AMBAJOGAI | BEED | MAHARASHTRA | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | M/s. Baba Construction, Aurangabad L3 | Harsh Constructions Pvt Ltd L7 | Wonder Construction L4 | Hi Tech Infra, Aurangabad L1 | Vinayak Construction Ambajogai L5 | Shubham EPC Private Limited L6 | Atal Realtech Ltd L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Part A (Work Portion) | ||||||||||
| 2.00 | ITEM:1 Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. Parking/Stilt Floor | 941.85 | Per Cubic Meter | 220 ₹2,07,207 | 96.2 ₹90,605.97 Lowest | 100 ₹94,185 | 100 ₹94,185 | 102.66 ₹96,689.38 | 100.2 ₹94,373.37 | 96.42 ₹90,816.94 |
| 3.00 | ITEM: 2 Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means Parking/Stilt Floor | 4,773.21 | Per Cubic Meter | 220 ₹10,50,106.2 | 185.5 ₹8,85,430.46 | 190 ₹9,06,909.9 | 200 ₹9,54,642 | 190.51 ₹9,09,349.01 | 190.5 ₹9,09,296.51 | 178.94 ₹8,54,118.2 Lowest |
| 4.00 | ITEM: 3 Excavation for foundation in hard murum including removing the excavated materials upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m).By Mechanical means. Parking/Stilt Floor | 712.68 | Per Cubic Meter | 220 ₹1,56,789.6 | 210 ₹1,49,662.8 | 210 ₹1,49,662.8 | 250 ₹1,78,170 | 209.27 ₹1,49,139.69 | 225 ₹1,60,353 | 196.56 ₹1,40,081.53 Lowest |
| 5.00 | ITEM:4 Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 to 3.0m.) By Mechanical Means. Parking/Stilt Floor | 2,298.21 | Per Cubic Meter | 250 ₹5,74,552.5 | 235.4 ₹5,40,998.63 Lowest | 260 ₹5,97,534.6 | 270 ₹6,20,516.7 | 261.58 ₹6,01,172.67 | 280 ₹6,43,498.8 | 245.7 ₹5,64,658.71 |
| 6.00 | ITEM:5 Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.50 m upto 3.0 m.) By Mechanical Means . Parking/Stilt Floor | 1,150.65 | Per Cubic Meter | 280 ₹3,22,182 Lowest | 375 ₹4,31,493.75 | 370 ₹4,25,740.5 | 290 ₹3,33,688.5 | 373.43 ₹4,29,683.78 | 400 ₹4,60,260 | 350.75 ₹4,03,584.73 |
| 7.00 | ITEM:6 Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, to Per Numbert less than 97% of standard Proctor density for a lead of over 50m. to 300m. inclusive from the site of excavation to the site of deposition as directed. SSR I.Per Number. 2.25, Sr.Per Number. 98 P.Per Number.24 | 5,715.06 | Per Cubic Meter | 150 ₹8,57,259 Lowest | 199.04 ₹11,37,525.54 | 185 ₹10,57,286.1 | 250 ₹14,28,765 | 187.12 ₹10,69,390.6 | 197.05 ₹11,26,152.57 | 175.75 ₹10,04,433.23 |
| 8.00 | ITEM:7 Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including watering and compaction etc. complete.. .Parking/Stilt Floor | 3,041.03 | Per Cubic Meter | 700 ₹21,28,721 Lowest | 735 ₹22,35,157.05 | 740 ₹22,50,362.2 | 825 ₹25,08,849.75 | 749.79 ₹22,80,121.72 | 745 ₹22,65,567.35 | 704.25 ₹21,41,630.17 |
| 9.00 | ITEM:8 Filling in plinth and floors with approved excavated materials in 15 cm. to 20 cm. layers including watering and compaction etc. complete. Parking/Stilt Floor | 10 | Per Cubic Meter | 100 ₹1,000 Lowest | 118.65 ₹1,186.5 | 110 ₹1,100 | 110 ₹1,100 | 111.54 ₹1,115.43 | 117.46 ₹1,174.64 | 104.77 ₹1,047.68 |
| 10.00 | ITEM:9 Providing soling using 80 mm size t rap metal in 15 cm. layer including fi lling voids wi th Crushed sand/ gr i t , ramming, water ing etc. complete. Parking/Stilt Floor | 739.8 | Per Cubic Meter | 1,500 ₹11,09,700 Lowest | 1,740 ₹12,87,252 | 1,700 ₹12,57,660 | 1,550 ₹11,46,690 | 1,721.64 ₹12,73,670.75 | 1,750 ₹12,94,650 | 1,617.07 ₹11,96,310.61 |
Tender Value
₹60.2 Cr
EMD Value
₹30.1 L
Closing Date
24 Nov 2022, 6:55 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E E P.W.Division, Parbhani
E E P.W.Division, Parbhani
Construction of New District Court Building At Parbhani Tq.Dist.Parbhani
2022_PWR_850344_1
pwd/pbn/ento16/22-23
Open Tender
Civil Works
Item Rate
730 days
Parbhani
Please refer Tender documents.
6 documents required · 6 mandatory
₹3,000
₹30.1 L
C E ,Public Works Region,Nanded
28 Feb 2023
9 Nov 2022
26 Nov 2022
9 Nov 2022
24 Nov 2022
9 Nov 2022
14 Nov 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part A (Work Portion) | - | - | - | - |
| 2 | ITEM:1 Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. Parking/Stilt Floor | 941.85 | Per Cubic Meter | 109.2 | ₹1,02,850.02 |
| 3 | ITEM: 2 Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means Parking/Stilt Floor | 4,773.21 | Per Cubic Meter | 202.65 | ₹9,67,291.01 |
| 4 | ITEM: 3 Excavation for foundation in hard murum including removing the excavated materials upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m).By Mechanical means. Parking/Stilt Floor | 712.68 | Per Cubic Meter | 222.6 | ₹1,58,642.57 |
| 5 | ITEM:4 Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 to 3.0m.) By Mechanical Means. Parking/Stilt Floor | 2,298.21 | Per Cubic Meter | 278.25 | ₹6,39,476.93 |
| 6 | ITEM:5 Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.50 m upto 3.0 m.) By Mechanical Means . Parking/Stilt Floor | 1,150.65 | Per Cubic Meter | 397.22 | ₹4,57,061.19 |
| 7 | ITEM:6 Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, to Per Numbert less than 97% of standard Proctor density for a lead of over 50m. to 300m. inclusive from the site of excavation to the site of deposition as directed. SSR I.Per Number. 2.25, Sr.Per Number. 98 P.Per Number.24 | 5,715.06 | Per Cubic Meter | 199.04 | ₹11,37,525.54 |
| 8 | ITEM:7 Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including watering and compaction etc. complete.. .Parking/Stilt Floor | 3,041.03 | Per Cubic Meter | 797.56 | ₹24,25,403.89 |
| 9 | ITEM:8 Filling in plinth and floors with approved excavated materials in 15 cm. to 20 cm. layers including watering and compaction etc. complete. Parking/Stilt Floor | 10 | Per Cubic Meter | 118.65 | ₹1,186.5 |
| 10 | ITEM:9 Providing soling using 80 mm size t rap metal in 15 cm. layer including fi lling voids wi th Crushed sand/ gr i t , ramming, water ing etc. complete. Parking/Stilt Floor | 739.8 | Per Cubic Meter | 1,831.34 | ₹13,54,825.33 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_1474107.xls
BOQ Document • 0.86 MB
108517036.pdf
Tender Document • 0.07 MB
1Parbahni_Court.pdf
Tender Document • 2.97 MB
108517038.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .