| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹88.0 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹94.8 L+₹6.8 L (7.72%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹97.1 L+₹9.2 L (10.4%)Rejected-AOC C O ANISH KUMAR GOYAL PURENAH PARA ROAD WARD NO 5 SAKTI SAKTI CHHATTISGARH 495689 | JANJGIR CHAMPA | CHHATTISGARH | 495689 | 3 | Rejected-AOC L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical Invalid similar work experience, So Not Qualify with the eligibility criteria | |
| 5 | Rejected-Technical VILLAGE DOLIPUR PASANA KARCHANA PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | - | Rejected-Technical Invalid similar work experience, So Not Qualify with the eligibility criteria |
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
25 Sept 2024, 3:00 pmClosed
SUPERINTENDING ENGINEER, FOURTH CIRCLE IRRIGATION
OFFICE OF THE SUPERINTENDING ENGINEER, FOURTH CIRCLE IRRIGATION WORKS JHANSI, STATION ROAD JHANSI.
LOT NO.11- RESTORATION AND DEMARCATION WORK OF CANAL LAND FROM KM 0.000 TO KM 13.679 OF AMGAON DY. IN DISTRICT JHANSI UNDER BETWA CANAL DIVISION- I ORAI.
2024_UPIDC_953571_11
01/SE-IV/2024-25
Open Tender
Civil Works
Item Rate
300 days
Jhansi
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,360
₹2.3 L
12 Nov 2024
12 Sept 2024
25 Sept 2024
12 Sept 2024
25 Sept 2024
12 Sept 2024
Amount
Earth work in Mar, Rankar and kankar mixed soil in filling, raising & Strengthening of Bank & Service Road i/c lead up to 30.00 M. and lift up to 1.50 M.With manual compaction and dressing making profile for proper completion of work as per direction of engineer-in-charge.
Earth work in Mar, Rankar and Kankar mixed borrowed soil in filling, raising & Strengthening of Bank & Service Road i/c lead upto 195 mtr. With manual compaction and dressing making profile for proper completion of work as per direction of engineer-in-charge.
Earth work in Mar, Rankar and Kankar mixed borrowed soil in filling, raising & Strengthening of Bank & Service Road i/c lead upto 1.00 Km. With manual compaction and dressing for proper completion of work as per direction of engineer-in-charge.
Supply, Laying, jointing ,testing and commisionning the HDPE pipe in standard length confirming to I.S. 4984 , I.S. 7634 etc . including cost of Transportation , fright charges , inspection charges ,loading unloading charges , conveyance to departmental store / site and stacking the same , sand cusion of 15 cm thick all around the pipe etc. Complete in all respect to the operational form as per direction of Engineer in charge. HDPE pipe 160 mm PE 100 pipe PN6, IS-498
Supply , Laying , jointing ,testing and commisionning the HDPE pipe in standard length confirming to I.S. 4984 , I.S. 7634 etc . including cost of Transportation , fright charges , inspection charges ,loading unloading charges , conveyance to departmental store / site and stacking the same , sand cusion of 15 cm thick all around the pipe etc. Complete in all respect to the operational form as per direction of Engineer in charge. HDPE pipe 125 mm PE 110 pipe PN4, IS-4984
Providing and Laying of LDPE(200 micron) Film on footing box including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Fixing of RCC Boundry pillar(Cast-in-Site) size (250mmx250mmx1650mm) including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Centering and shuttering of RCC & C.C Work including cost of material, labour, T&P etc. proper completion of work as per direction of Engineer-in-charge.
Two coat of synthetic enamel paint over a coat of primer for painting of RCC boundary pillar T&P etc. proper completion of work as per direction of Engineer-in-charge.
Dismantling of old and damaged brick/stone masony and plain concrete with lime or cement motar work as per direction of Engineer-in-charge.
Earth work in Mar kaber ranker mixed soil for excavation foundation i/c all cost of labour materials and T&Pf or proper completion of work as per direction of Engineer-in-Charge.
Laying & spreading of Local sand in foundationfor including all cost material labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge.
Laying cement concrete mix with 1:3:6 in foundation with compaction and curing including all cost material labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge.
Laying cement concrete mix 1:2:4 with stone grit (10 to 20mm) i/c all cost of labour and T&P etc.required for proper completion of work as per direction of Engineer-in-Charge.
C.C. 1 : 1.5 : 3 with Stone Grit (10 to 20 mm) size i/c all cost of labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge.
Brick work (M-150) with 1:4 cement motar including all cost material labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Stone Bolder (40-60 kg)with 1:4 cement motar including all cost material labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Reinforcement (Fe500) for R.C.C. work i/c cutting , bending,& binding& placing in position including cost of material, labour, T& P etc. as per direction of Engineer-in-charge.
Struck pointing 1:2 cement mortar including all cost of material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Two coat of exterior emulsion paint , i/c supply of all materials, labour and T&P etc. required for proper completion of workas per direction of Engineer-in-Charge. Make ( Asian Apex, Berger All Weather Guard or equivalent). as per direction of Engineer-in-Charge.
ARUN CONSTRUCTION
M/S MAA SHARDA CONSTRUCTION AND SUPPLIERS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .