| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹9.9 LAccepted-Finance | H1 | Accepted-Finance TECHNICALLY AND FINANCIALLY QUALIFIED | |
| 2 | H2₹9.0 L−₹96,315 (9.71%)Accepted-Finance | H2 | Accepted-Finance TECHNICALLY AND FINANCIALLY QUALIFIED | |
| 3 | H3₹8.9 L−₹1.0 L (10.4%)Accepted-Finance | H3 | Accepted-Finance TECHNICALLY AND FINANCIALLY QUALIFIED | |
| 4 | H4₹7.7 L−₹2.2 L (22.0%)Accepted-Finance | H4 | Accepted-Finance TECHNICALLY AND FINANCIALLY QUALIFIED |
Tender Value
₹9.9 L
EMD Value
₹19,788
Closing Date
20 Nov 2024, 11:00 amClosed
EXECUTIVE ENGINEER KPDCL DIVISION SHOPIAN
EXECUTIVE ENGINEER KPDCL DIVISION SHOPIAN
CREATION OF 25 KVA SUB-STATIONS ALONG WITH HT.LT NETWORK
2024_PDD_264156_1
EDS/E-TENDER/36 OF 2024-25 DATED 11-11-2024
Open Tender
Electrical and Maintenance Works
Turn-key
40 days
KPDCL SD CHITRAGAM
PLEASE REFER TO SBD
7 documents required · 7 mandatory
₹1,000
EXECUTIVE ENGINEER KPDCL DIVISION SHOPIAN
₹19,788
Yes
21 Nov 2024
11 Nov 2024
20 Nov 2024
11 Nov 2024
20 Nov 2024
12 Nov 2024
12 Nov 2024 - 12 Nov 2024
Amount
Supply,Errection, testing & commissioning of ST poles 9 mtr long 410-SP-33 with base plate and cap including transportation as per REC Standard
Supply and laying of Cement bottoming 1:2:4 mix as per REC standards 0.5 cum/pole, muffing 20 cm above ground level ,including plaster and curing of concrete for (9mtr poles)
Supply, Transportation, Laying, stringing and binding of conductor including joints with PG clamps of required size 50mm2 ACSR
Supplying and erection of GI channel (100x50x6 mm) ,(75x40x6 mm) , GI Angle( 50x50x6 mm), 50X50X6 mm angle support including clamps for Sub-Station Frame / GI Channel “V’ cross-arm (75 x 40x6mm) with GI Angle Pole Top Bracket (50x50x6 mm) including back clamps of 50X8 mm for fixing V-Cross arm and pole top bracket as per REC approved Drawings.
Providing and Fixing of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Supply and erection of Danger Plates with clamps with writing in English and Regional Language
Supply and fixing of anti-climbing Device with Clamps
Supply,Installation testing & commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
SITC LT Fuse of suitable capacity (Please refer Tender Drawing of Fuse set)
SITC of 11KV D.O FUSE SET 3 Phase Horn Gap
SITC of 11 KV LA SET 9 KVA ,10 KA,LA WITH Polymer ,Porcelain Housing Station Type
Providing and Fixing of Nut & Bolts GI
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Painting of each Pole 1 coat red oxide paint and 2 coats of aluminium paint (@ 1 ltr/pole red oxide paint and 1 ltr/pole aluminium paint)
Supply,Fixing of Spike Earthing Rod 20mm 2,5 Mtr long with GI strip (25x3)mm
Geo Tagged Photographs of high resolution (Pre and Post Photographs) Both hard and soft copy (for e-compendium) 4 Photographs Per site
D.S ENTERPRISES (BID ID -2243582)
M/S S.B.ELECTRICALS (BID ID -2242978)
Reaching Rays Infra Electricals (BID ID -2243746)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .