Loading…
Loading…
Tender Value
₹97,900
EMD Value
₹4,895
Closing Date
15 Sept 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD COMPLEX BUDGAM
Construction of Drain from House of Gh Mohidin Dar to Graveyard at Paul Mohallah Wadipora
2026_RDPR_322876_77
NIT_61_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
BK PORA
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
EXECUTIVE ENGINEER REW BUDGAM
₹4,895
31 Aug 2026
31 Aug 2026
16 Sept 2026
31 Aug 2026
15 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Earth work in excavation by Mech means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shaftswells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 14.3 | Cum | 479.3 | ₹6,853.99 |
| 0_) | Providing and laying of stone soling hand packed complete Job including by MT incl. plum. | - | Cum | 937 | - |
| 0_) | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 8.9 | Cum | 5,733.6 | ₹51,029.04 |
| 0_) | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 37.6 | Sqm | 286.35 | ₹10,766.76 |
| 0_) | CEMENT PLASTER (IN FINE SAND)
12mm Cement plaster of mix: 1 : 6 ( 1 cement : 4 fine sand) | 37.6 | Sqm | 266.2 | ₹10,009.12 |
| 0_) | Providing and laying reinforced cement concrete pipe (non-pressure) for pipe culverts/crossings in single/double row in proper gradient as directed by EIC including jointing, trench excavation by mechanical means and backfilling the exavating earth and disposal of surplus excavated earth as directed from site . (Complete Job) incl carriage | 4.88 | RM | 1,200 | ₹5,856 |
| 0_) | Carraige of stone aggregate, 20 mm from Source to Site. | - | cum | 305.5 | - |
| 0_) | Carraige of sand from Source to Site. | - | cum | 305.5 | - |
| 0_) | Carraige of stone soling from Source to Site. | - | cum | 359.31 | - |
| 0_) | Add provisions for signboard, Photographes and other unforseen items., Head load | 1 | job | 3,500 | ₹3,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.34 MB
BOQ_1085016.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .