Loading…
Loading…
Tender Value
₹2.0 Cr
EMD Value
₹3.9 L
Closing Date
5 Oct 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
TRD
14 conditions · 3 needing a document upload
AS PER TENDER DOCUMENT
AS PER TENDER DOCUMENT
10 conditions · 9 needing a document upload
Cl.no.1.1.22 of of volume II, part 1 Chapter-1,Documents for the proof of ownership:- company registration certificate to be uploaded.
As per the cl.no.1.1.22 of of volume II, part 1 Chapter-1,In case of Sole Proprietorship Firm: All documents in terms of Para 10 of the Tender Form (Second Sheet) of GCC April 2022.
as per the cl.no.1.1.22 of of volume II, part 1 Chapter-1 ,In case of Partnership Firm: All documents as mentioned in para18 of the Tender Form (Second Sheet)of GCC April 2022.
as per the cl.no.1.1.22 of of volume II, part 1 Chapter-1,In case of Joint Venture (JV) All documents as mentioned in para 17 of the Tender Form (Second Sheet)of GCC April 2022 .
as per the cl.no.1.1.22 of of volume II, part 1 Chapter-1,In case of Company registered under Companies Act2013: (i)The copies of MOA (Memorandum of Association) / AOA (Articles of Association) of the company (ii)A copy of Certificate of Incorporation (iii)A copy of authorization/Power of Attorneyissued by the Company (backed by the resolution of Board of Directors) in favors of the individual to sign the tender on behalf of the company and create liability against the company. (iv)All other documents in terms Para 10 of the Tender Form (Second Sheet) of GCC April 2022 .
as per the cl.no.1.1.22 of of volume II, part 1 Chapter-1,In case of LLP (Limited Liability Partnership): (vi)A copy of LLP Agreement (vii)A copy of Certificate of Incorporation (viii)A copy of Power of Attorney/Authorization issued by the LLP in favour of the individual to sign the tender on behalf of the LLP and createliability against the LLP. (ix)An undertaking by all partners of the LLP that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India fromparticipation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm/LLP or JV in which they were / are partners/members. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the Standard GeneralConditions of Contract. (x)All other documents in terms of Para 10 of the Tender Form (Second Sheet) of GCC April 2022.
as per the cl.no.1.1.22 of of volume II, part 1 Chapter-1,In case of Registered Society & Registered Trust: (vi)A copy of Certificate of Registration (vii)A copy of Memorandum of Association of Society/Trust Deed (viii)A copy of Power of Attorney in favour of the individual to sign the tender documents and create liability against the Society/Trust. (ix)A copy of Rules & Regulations of the Society (x)All other documents in terms of Para 10 of the Tender Form (Second Sheet) of GCC April 2022 .
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Information/ certificates required as per Tender document for partnership deed, Article of association, MOU, JV AGREEMENT, Proprietary firm etc.
Self Attested copy of Experience Certificate of Previous Work Done -The bidder should submit documents related to completed/on-going similar service contracts during the last three previous financial years and the current financial year along with the details of payments received and percentage penalties imposed therein, to classify the completed/ on-going similar service contracts.
Replacement of Bent/Leaned Masts in yards along with protection of masts by providing sacrificial masts in sidings in Chennai division.
M-TRD-29-I-OT-2026-27-17~SR
M-TRD-29-I-OT-2026-27-17
Open
Works - General
9 Months
Chennai, Tamil Nadu
₹0
₹3.9 L
11 Sept 2026
11 Sept 2026
21 Sept 2026
128 items across 5 schedules · ₹1,79,30,182 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | 1(a) Preparation of designs and drawings for overhead equipment and verification of purchaser's pegging plan. | Per Track KM | 4.00 | 23,562 | 94,248 |
| 2 | 5(a)(i) Supply without insulator of mounting arrangements for span wire. | Each | 2.00 | 7,083 | 14,166 |
| 3 | 5(a)(i) Erection of mounting arrangements for span wire. | Each | 2.00 | 1,559 | 3,118 |
| 4 | 32/5(a)(i) Extra charges for erection of mounting arrangements for span wire under Power block. | Each | 2.00 | 1,559 | 3,118 |
| 5 | 8(a)(xii) Marking/painting of temperature &'Y'- Measurement of OHE mast at BWA Locations | Each | 2.00 | 180 | 360 |
| 6 | 32/8(a)(xii) Extra on Marking/Painting of temperature & 'Y'- Measurement of OHE mast at BWA locations under a power block. | Each | 2.00 | 180 | 360 |
| 7 | 8(b)(vi) Supply without insulator of materials for termination of tramway type OHE (Regulated) | Each | 2.00 | 3,913 | 7,826 |
| 8 | 8(b)(vi) Erection of materials for termination of tramway type OHE (Regulated). | Each | 2.00 | 1,445 | 2,890 |
| 9 | 32/8(b)(vi)Extra charges for erection of materials for termination of tramway type OHE (Regulated) under power block. | Each | 2.00 | 1,445 | 2,890 |
| 10 | 9(dz) Supply without insulator of anti- creep with Cadmium copper catenary wire in polluted area. | Each | 1.00 | 6,091 | 6,091 |
| 11 | 9(dz) Erection of anti- creep with Cadmium copper catenary wire in polluted area. | Each | 1.00 | 4,788 | 4,788 |
| 12 | 32/9(dz) Extra charges for erection of anti- creep with Cadmium copper catenary wire in polluted area under power block. | Each | 1.00 | 4,788 | 4,788 |
| 13 | 9(ez) Supply without insulator of anti- creep with Cadmium copper catenary wire suitable for tramway type OHE (Regulated) in polluted area. | Each | 1.00 | 6,300 | 6,300 |
| 14 | 9(ez) Erection of anti- creep with Cadmium copper catenary wire suitable for tramway type OHE (Regulated) in polluted area. | Each | 1.00 | 4,788 | 4,788 |
| 15 | 32/9(ez) Extra charges for erection of anti- creep with Cadmium copper catenary wire suitable for tramway type OHE (Regulated) in polluted area under power block. | Each | 1.00 | 4,788 | 4,788 |
| 16 | 11(a)(i)Supply without insulator of cut-in (9 tone) insulator. | Each | 4.00 | 1,627 | 6,508 |
| 17 | 11(a)(i)erection of cut-in (9 tone) insulator. | Each | 4.00 | 1,017 | 4,068 |
| 18 | 32/11(a)(i)Extra charges for erection of cut-in (9 tone) insulator under power block. | Each | 4.00 | 1,017 | 4,068 |
| 19 | 11(b)Supply without insulator 25kV post insulator. | Each | 8.00 | 831 | 6,648 |
| 20 | 11(b) Erection of 25kV post insulator. | Each | 8.00 | 414 | 3,312 |
| 21 | 32/11(b)Extra charges for erection of 25kV post insulator under power block. | Each | 8.00 | 414 | 3,312 |
| 22 | 17(b) Extra on item 17(a) for special embedment of Earth Electrode. | Each | 1.00 | 1,310 | 1,310 |
| 23 | 31(a) Modification to erected equipment's: Transfer of equipment from one mast or support to another/ supply. | Each | 110.00 | 2,302 | 2,53,220 |
| 24 | 31(a) Modification to erected equipment's: Transfer of equipment from one mast or support to another/ erection. | Each | 110.00 | 4,319 | 4,75,090 |
| 25 | 32/31(a) Modification to erected equipments:Extra charges for Transfer of equipment from one mast or support to another under power block. | Each | 110.00 | 4,319 | 4,75,090 |
| 26 | 31(b) Modification to erected equipments: Provision of an additional bracket assembly/assemblies on a mast or support. | Each | 10.00 | 3,834 | 38,340 |
| 27 | 32/31(b) Modification to erected equipments: Extra charges for Provision of an additional bracket assembly/assemblies on a mast or support under power block. | Each | 10.00 | 3,834 | 38,340 |
| 28 | 31(f)Modification to erected equipments:Splicing & extension of an anchored overhead equipment | Each | 4.00 | 4,269 | 17,076 |
| 29 | 32/31(f) Modification to erected equipments:Extra charges for Splicing & extension of an anchored overhead equipment under power block. | Each | 4.00 | 4,269 | 17,076 |
| 30 | 31(gz)Modification to erected equipments: Dismantling of a section insulator assembly. supply. | Each | 2.00 | 1,919 | 3,838 |
| 31 | 31(gz)Modification to erected equipments: Dismantling of a section insulator assembly. Erection | Each | 2.00 | 4,269 | 8,538 |
| 32 | 32/31(gz) Modification to erected equipments:Extra charges for Dismantling of a section insulator assembly under power block. | Each | 2.00 | 4,269 | 8,538 |
| 33 | 31(i) Modification to erected equipments:Dismantling of an isolator. | Each | 1.00 | 2,393 | 2,393 |
| 34 | 32/31(i)Modification to erected equipments:Extra charges for Dismantling of an isolator under power block. | Each | 1.00 | 2,393 | 2,393 |
| 35 | 31(j) Modification to erected equipments:Dismantling a post/pedastal insulator | Each | 8.00 | 761 | 6,088 |
| 36 | 32/31(j)Modification to erected equipments:Extra charges for Dismantling of a post/pedastal insulator under power block. | Each | 8.00 | 761 | 6,088 |
| Schedule total | ₹15,41,853 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Bent_Mast_Leaned_Mast_Tender_Document.pdf tender document
ATTACHMENT
NEWGCC_APRIL2022.pdf
ATTACHMENT
CorrectionSlip1to11ofGCC2022.pdf
ATTACHMENT
Checklist.pdf
ATTACHMENT
Bent_Mast_Leaned_Mast_Tender_Document.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .