Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹4,697.72 (0.04%)Admitted-Finance | ₹1.3 Cr+₹4,697.72 (0.04%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not qualiifed as per SBD |
| 4 | Rejected-Technical | - | - | Rejected-Technical Foundation work missing |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not qualiifed as per SBD |
| Sl No | Description | Qty | Unit | AWAJ INFRA ENGINEERING SOLUTIONS L1 | M/S ALJAN ENGINEERS AND CO L2 |
|---|---|---|---|---|---|
| 1.00ERS & DIMENTALLING WORKS | |||||
| 2.00 | Loading of ERS at Divisional Stores including manual , mechnical carriage ,and unloading and stacking at site including Errection of ERS at site including hire charges of land for erection of ERS till dismantaling of ERS | 2 | Set | 1,35,000 ₹2,70,000 | 1,30,000 ₹2,60,000 Lowest |
| 3.00 | Shifting of conductor from the existing towers on the ERS to make one circuit of 220kv MirBazar Pampore Line functional and lowering of conductor of the 2nd circuit and earth wire as per requirement at site including opening of jumpers and making at ERS complete job. | 1 | Job | 1,00,000 ₹1,00,000 | 83,000 ₹83,000 Lowest |
| 4.00 | Dismantaling of existing tower superstructures including,stacking ,manual carrage , loading at site ,mechnical carriage from site to Divisional stores ,unloading at divisonal stores | 18.63 | MT | 8,000 ₹1,49,040 Lowest | 11,300 ₹2,10,519 |
| 5.00 | Dismantaling of existing foundations if needed for excavation of foundation pits complete | 2 | Job | 5,000 ₹10,000 | 4,000 ₹8,000 Lowest |
| 6.00 | Dismantaling of existing protection wall including stacking of useful material and reuse for construction of protection /bounderay wall including material of sand ,cement as per site requirement | 1 | Job | 5,000 ₹5,000 Lowest | 8,000 ₹8,000 |
| 7.00SUPPLY OF MATERIAL | |||||
| 8.00 | Supply of Tower Structures as per BOM | 28.17 | MT | 1,51,000 ₹42,53,670 | 1,47,000 ₹41,40,990 Lowest |
| 9.00Tower Accessories | |||||
| 10.00 | Danger Plates | 2 | Nos. | 500 ₹1,000 | 200 ₹400 Lowest |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
6 Apr 2024, 2:00 pmClosed
Executive Engineer TLMD-IVPampore
TLMD-IV Pampore
Increasing of ground clearance between tower location no. 151/1 and 151 of 220kv (D/C) Mirbazzar Pampore Transmission line under the jurisdiction of TLMD-IV Pampore
2024_PDD_246537_1
TLMD-IV/27 of 2023-24
Open Tender
Electrical Works
Item Rate
90 days
Baghi Wanpoh Anantnag
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,600
Yes
Executive Engineer TLMD-IV Pampore
₹2.6 L
Yes
26 Apr 2024
6 Mar 2024
8 Apr 2024
6 Mar 2024
6 Apr 2024
11 Mar 2024
6 Mar 2024 - 10 Mar 2024
Amount
ERS & DIMENTALLING WORKS
Loading of ERS at Divisional Stores including manual , mechnical carriage ,and unloading and stacking at site including Errection of ERS at site including hire charges of land for erection of ERS till dismantaling of ERS
Shifting of conductor from the existing towers on the ERS to make one circuit of 220kv MirBazar Pampore Line functional and lowering of conductor of the 2nd circuit and earth wire as per requirement at site including opening of jumpers and making at ERS complete job.
Dismantaling of existing tower superstructures including,stacking ,manual carrage , loading at site ,mechnical carriage from site to Divisional stores ,unloading at divisonal stores
Dismantaling of existing foundations if needed for excavation of foundation pits complete
Dismantaling of existing protection wall including stacking of useful material and reuse for construction of protection /bounderay wall including material of sand ,cement as per site requirement
SUPPLY OF MATERIAL
Supply of Tower Structures as per BOM
Tower Accessories
Danger Plates
Number Plates
Circuit Plates
Phase Plate
Anti Climbing Devices
Stubs
Galvanised Nuts & Bolts with Washers
Supply Of Line Material & Accessories
ACSR ZEBRA , 54/3.18mm Al & 7/3.18 mm Steel
Conductor Accosseries
Mid Span Compression Joint
Vibration Dampers
Repair Sleeves
Galvanised Stranded Steel Ground Wire 7/3.15 mm
Ground Wire Accessories
Mid Span Compression Joint
Vibration Dampers
Hardware Fittings
Single Tension Fittings For Conductor
Double Tension Fittings For Conductor
Tension Clamps with Flexible Cu Bonds for Earth Wire
Insulators 120 KN EM Strength Porcelain Disc Insulators
CIVIL WORKS
Pit marking, Tower spottingand and providing of approved drawings of (D+9)EMC type fully submerged foundations
Laying Of Tower Foundations
Earth exacavation for tower foundations including all labour, leads & lifts,shoring & stock piling, carriage, back filling, disposal & dressing of surplus excavated earth in all types of soils.
Providing and laying of stone soiling including all carriage.
Dewatering of foundations
Providing & laying of Concrete including carriages and cost of all material,labour, leads & lifts, shoring &, stock piling, carriage, use of admixtures, curing and other associated works
Centering and shuttering.including strutting proppingetc including removal of same for foundations,footings ,base of columns etc for mass concreate
Close timbering/strutting in trenches in loose soil assuming only 10% towers in semi hilly, hilly and plain areas require close timbering for 4 pits, 4x4x4x3m
Supply & placement of reinforcement steel including cutting ,bending as per drawing and transporttion.
Stub Setting including transportation, carriage of stubs and templates
Large Angle & Dead End Towers , DD Type
Supply of good earth including carrige
Protection Works
Earth exacavation of protection wall including all labour, leads & lifts, shoring & stock piling, carriage, back filling, disposal & dressing of surplous excavated earth & in all types of soils.
Providing and laying of stone soling including carriage.
Providing & laying of Concrete other than foundations including cost of all material,labour, T&P, leads & lifts, stock piling, carriage, use of admixtures, curing and other associated works including Carriages etc.
Centering and shuttering.including strutting proppingetc including removal of same for foundations,footings ,base of columns etc for mass concreate
Earthing of Towers Pipe Type complete incuding material as per standard.
ERECTION
Erection of towers complete with nuts & Bolts including, transportation to site.
Tag welding of first two stories.
Tower Accessories
Danger Plates,Number Plates,Circuit Plates and Phase Plate
Anti Climbing Devices
Route clearance
Laying & Stringing of ACSR ZEBRA conductor including installation of insulator strings, hardware fittings, arching horns, vibration dampers , making of compression joints and repair sleeves ,jumpering and other accessories including transportation to site and temporary anchoring of towers.( Six conductors)
Laying & Stringing of Earth Wire including installation of hardware clamps, vibration dampers and other accessories including transportation to site and temporary anchoring of towers.
Lowering of conductors from the ERS.
Loading of spared conductor, insulators etc including mechanical carriage, manual carriage of and un-laoading at divisional stores
Dismantaling of ERS at site including manual carriage ,mechnical carriage and un lading at Divisional stores.
M/S ALJAN ENGINEERS AND CO
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Tendernotice_2.pdf
PDF • 1.49 MB
BOQ_720414.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .