Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Fee/PreQual/Technical/Finance | -0.03% | ₹2.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.2 L+₹21.96 (0.01%)Admitted-Fee/PreQual/Technical/Finance | -0.02% | ₹2.2 L+₹21.96 (0.01%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.2 L+₹65.89 (0.03%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹2.2 L+₹65.89 (0.03%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.2 L
EMD Value
₹2,200
Closing Date
24 Aug 2026, 6:00 pmClosed
Executive Engineering UPSIC KANPUR
Executive Engineering UPSIC KANPUR
Construction of Flag Hosting At Ward 98 30/62 in front of Etawah Bazar Arya Nagar Vidhan Sabha Kanpur
2026_MSME_1177324_2
957/EE4/26-27
Open Tender
Civil Works
Percentage
90 days
KANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineering UPSIC KANPUR
₹2,200
10 Sept 2026
17 Aug 2026
25 Aug 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 Mtr. Including filling watering and ramming of excavated earth into the trenches of into the space between the building and the sides of foundation trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the foundation trenches.DSR 2.6.1 | 1.02 | cumt | 136.55 | ₹139.28 |
| 2 | Providing and laying in cement concrete 1:5:10 brick ballast 40 nominal size and form work, curing complete as per Technical Specification DSR 4.1.10 | 0.51 | cumt | 5,015.05 | ₹2,557.68 |
| 3 | First Class brick work with 1:4 cement coarse sand mortor …….. In Foundation & Plinth …. Complete item DSR 6.1.1 | 1.37 | cumt | 5,670.57 | ₹7,768.68 |
| 4 | Brick work with common burnt clay (Non Modular) Bricks of class-150 in Super structure above plinth level up to floor v level in all shape and sizes: cement mortar 1:4 DSR 6.4.1 | 2.71 | cumt | 7,189.04 | ₹19,482.3 |
| 5 | Granite Stone Slab 18 mm thick mirror polished quarter rounded with anti skid lines in treads of stair case full length flooring over 20 mm thick base laid over jointed with cement slurry mixed with pigment to match the shade of including rubbing & polishing complete with base of cement mortor 1:4 etc.DSR 8.2.2.2. | 1 | cum | 3,951.59 | ₹3,947.64 |
| 6 | Supplying /Fixing of stain less Steel Railing in Horizontal railing using 4 no 20mm dia bar and on Top of Railing using 50 mm dia of Steel pipe with 80 mm dia master piller including cost of material fixtures handles locks screw fastner and necessary bending etc as required for proper completion of the work as per direction of engineer incharge.. | 231.24 | kg | 594.24 | ₹1,37,412.06 |
| 7 | Supply and fixing of board … complete | 1 | job | 6,444 | ₹6,444 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_2212566.xls
BOQ • 0.27 MB
TermsandConditionTenderCivilWorks.pdf
Tender Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .