Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.2 LAccepted-AOC | ₹60.2 L Quoted ₹60.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹71.9 L+₹11.3 L (18.7%)Rejected-AOC H NO 12 N EXTENSION NEW PALAM VIHAR GURUGRAM 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹71.9 L+₹11.3 L (18.7%) | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical KADARPUR ROAD KADARPUR ROAD NEAR PARJAPATI DHARAMSHALA BADSHAPUR GURUGRAM 122001 | GURUGRAM | HARYANA | 122001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S DDR Buildtech L2 | Nalin construction L1 |
|---|---|---|---|---|---|
| 1.00 | Supply, Erection,testing and commissioning of Puffin 18W White Round Bright LED Panel Light Ceiling Downlight Lamp Kit with LED Driver Surface Mount LED Ceiling Light (Pack of 1)(2 Year Warranty) (complete in all respect) as directed by Engineer-in-charge: Make:-Philips,Bajaj,GE,Wipro,K-lite,crompton greaves` (690.00) SDS. | 60 | Each | 900 ₹54,000 | 600 ₹36,000 Lowest |
| 2.00 | Split AC 2 Tons LG 3 Star Inverter AC | 4 | Each | 60,000 ₹2,40,000 Lowest | 60,000 ₹2,40,000 Lowest |
| 3.00 | Drinking Water cooler 150-Ltr.capicity 2 nos. outlet push Toti provision with 60-LPH per hour R O Ro With Water Cooler Complete in all respect | 1 | Each | 1,75,000 ₹1,75,000 | 55,000 ₹55,000 Lowest |
| 4.00 | Providing and fixing Self Priming Monoblock Pump 1 HP, make Crompton set complete work given Head 6-45 meters, Discharge 57-13 LPM | 1 | Each | 6,500 ₹6,500 | 5,000 ₹5,000 Lowest |
| 5.00 | Vertical Window Blinds | 24 | Sqm | 250 ₹6,000 Lowest | 2,000 ₹48,000 |
Tender Value
₹65.8 L
EMD Value
₹1.3 L
Closing Date
22 May 2026, 12:00 pmClosed
PARVEEN KUMAR
Municipal Corporation Gurugram
Construction of operator room and site office at New F Block Palam Vihar, Ward no 4 in Division 3A under MCG. Re-call
2026_HRY_520895_1
2026BAD1141A 0E98 4149 9E92 BCA40DB7623B285ULB
Open Tender
Civil Works
Works
200 days
Gurugram
2 documents required · 2 mandatory
₹5,000
₹1.3 L
Yes
30 Jun 2026
11 May 2026
22 May 2026
11 May 2026
22 May 2026
11 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, Erection,testing and commissioning of Puffin 18W White Round Bright LED Panel Light Ceiling Downlight Lamp Kit with LED Driver Surface Mount LED Ceiling Light (Pack of 1)(2 Year Warranty) (complete in all respect) as directed by Engineer-in-charge: Make:-Philips,Bajaj,GE,Wipro,K-lite,crompton greaves` (690.00) SDS. | 60 | Each | - | - |
| 2 | Split AC 2 Tons LG 3 Star Inverter AC | 4 | Each | - | - |
| 3 | Drinking Water cooler 150-Ltr.capicity 2 nos. outlet push Toti provision with 60-LPH per hour R O Ro With Water Cooler Complete in all respect | 1 | Each | - | - |
| 4 | Providing and fixing Self Priming Monoblock Pump 1 HP, make Crompton set complete work given Head 6-45 meters, Discharge 57-13 LPM | 1 | Each | - | - |
| 5 | Vertical Window Blinds | 24 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_599794.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .