Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAdmitted-Finance | ₹3.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.6 CrAdmitted-Finance | ₹3.6 Cr | L2 | Admitted-Finance |
| 3 | L3₹3.6 CrAdmitted-Finance | ₹3.6 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S N.A. Enterprise L1 | Tarun Basumatary L2 | M/S B K B Enterprise L3 |
|---|---|---|---|---|---|---|
| 1.00 | Construction of Intake well | 1 | Job | - | - | - |
| 2.00 | Supply, erection, testing and commissioning of 100 mm dia Raw water pumping main | 1 | Job | - | - | - |
| 3.00 | Supply, erection,commissioning and testing of 10 HP Centrifugal type Raw water pump sets : | 1 | Job | - | - | - |
| 4.00 | Construction Cost of Treatment Plant | 1 | Job | - | - | - |
| 5.00 | Construction of Filter Under Drainage System, Internal Connection, Filter Media etc. | 1 | Job | - | - | - |
| 6.00 | Construction of 60 Cu.m capacity U.G.R | 1 | Job | - | - | - |
| 7.00 | Providing Chemical Dosing (ElectroChlorinator with Test Kit): | 1 | Job | - | - | - |
| 8.00 | Construction of Clear water pump house | 1 | Job | - | - | - |
| 9.00 | Supply, erection,testing and commissioning of 5 HP capacity Clear Water Pump Set | 1 | Job | - | - | - |
| 10.00 | Supply,erection, testing and commissioning of 100 mm dia Clear Water Pumping main | 1 | Job | - | - | - |
Tender Value
₹3.6 Cr
EMD Value
₹7.2 L
Closing Date
23 Dec 2019, 3:00 pmClosed
Addl Chief Engineer cum Director PHED,BTC, Kokrajh
O/o the Addl Chief Engineer cum Director PHED,BTC, Kokrajhar
Construction of Gorkheli Suba PWSS
2019_BoTC_15243_1
BTC/PHED/71 of 2019-20
Open Tender
Civil Works – Lift Irrigation Schemes
550 days
Baksa
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
Prinicipal Secretary, BTC
₹7.2 L
Yes
8 Jan 2020
7 Dec 2019
23 Dec 2019
7 Dec 2019
23 Dec 2019
7 Dec 2019
7 Dec 2019 - 23 Dec 2019
Amount
Construction of Intake well
Supply, erection, testing and commissioning of 100 mm dia Raw water pumping main
Supply, erection,commissioning and testing of 10 HP Centrifugal type Raw water pump sets :
Construction Cost of Treatment Plant
Construction of Filter Under Drainage System, Internal Connection, Filter Media etc.
Construction of 60 Cu.m capacity U.G.R
Providing Chemical Dosing (ElectroChlorinator with Test Kit):
Construction of Clear water pump house
Supply, erection,testing and commissioning of 5 HP capacity Clear Water Pump Set
Supply,erection, testing and commissioning of 100 mm dia Clear Water Pumping main
Const. of 200 Cu.m capacity RCC O.H.R with 16 m. staging:
Cost of Distribution Network
Construction of Accomodation for Staff (i) For intake point
Construction of Accomodation for Staff (ii) For Tratment Plant
Providing ASEB Power Connection including power line(i) For intake point
Providing ASEB Power Connection including power line(ii) For Tratment Plant
Site Development Works
Construction of Compound Fencing
Providing Compound Electrification and lighting
Construction of Approach Road with Box Culvert
Supply of T & P Materials
Trial Run
Supply,Erection, testing and commissioning Diesel Generating Set :(A) At Intake location 12.5 KVA
Supply,Erection, testing and commissioning Diesel Generating Set :(B) At Treatment Plant 15 KVA
Providing House Service Connection
Supply of Laboratory equipment
Construction of 2.0 Sq.m. Toilet in Treatment Plant
Tarun Basumatary
M/S B K B Enterprise
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
BOQ_23094.xls
BOQ • 0.25 MB
SBD_PHE_71.pdf
Tender Documents • 0.46 MB
Download all tender documents and submit your bid