Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 CrAdmitted-Finance RANCHI | RANCHI | RANCHI | JHARKHAND | ₹10.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹10.7 CrAdmitted-Finance 30 INDUSTRIAL AREA KOKAR RANCHI 834004 JHARKHAND | RANCHI | JHARKHAND | 834004 | ₹10.7 Cr | L2 | Admitted-Finance |
| 3 | L3₹12.9 CrAdmitted-Finance | ₹12.9 Cr | L3 | Admitted-Finance |
| 4 | L4₹13.0 CrAdmitted-Finance 504 MANGAL MURTI HEIGHTS RANI BAGAN HARMU ROAD RANCHI | RANCHI | JHARKHAND | 829205 | ₹13.0 Cr | L4 | Admitted-Finance |
| 5 | L5₹13.6 CrAdmitted-Finance RANCHI | RANCHI | JHARKHAND | 829205 | ₹13.6 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Raj Construction L2 | M/s MAA SHARDA CONSTRUCTION L5 | ANAND CONSTRUCTION INFRASTRUCTURE PVT LTD L4 | ATUL PRATAP CONSTRUCTION L1 | M/S SETH KUMAR L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00EARTH WORK | ||||||||
| 2.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 8,072 | Sqm | 15 ₹1,21,080 | 15.4 ₹1,24,308.8 | 17 ₹1,37,224 | 14 ₹1,13,008 Lowest | 16 ₹1,29,152 |
| 3.00 | Felling trees of the girth (measured at a height of 1 m above groundlevel), including cutting of trunks and branches, removing the roots andstacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth | 6 | Each | 460 ₹2,760 | 465 ₹2,790 | 512 ₹3,072 | 426 ₹2,556 Lowest | 512 ₹3,072 |
| 4.00 | Beyond 60 cm girth upto and including 120 cm girth | 2 | Each | 2,054 ₹4,108 | 2,077 ₹4,154 | 2,285 ₹4,570 | 1,900 ₹3,800 Lowest | 2,285 ₹4,570 |
| 5.00 | Earth Work in excavation in Foundation Trenches in Ordinary soil (vide classification of soil item -B) and disposal of excavated earth as obtained to a distance upto 50 M including all lift, leveling ramming the foundation trenches, removing roots of tree shrubs all complete as per approved design, building specification and direction of E/I | 2,428.82 | Cum | 161 ₹3,91,040.02 | 167 ₹4,05,612.94 | 180 ₹4,37,187.6 | 149 ₹3,61,894.18 Lowest | 180 ₹4,37,187.6 |
| 6.00 | Extra for earth work in hard soil as per specification & direction of engineer in charge (Vide classification of soil item B) | 798.99 | Cum | 16 ₹12,783.84 | 16.64 ₹13,295.19 | 18 ₹14,381.82 | 15 ₹11,984.85 Lowest | 18 ₹14,381.82 |
| 7.00 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock | 110.06 | Cum | 547 ₹60,202.82 Lowest | 554 ₹60,973.24 | 610 ₹67,136.6 | 560 ₹61,633.6 | 610 ₹67,136.6 |
| 8.00 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | 1,705.76 | Cum | 131 ₹2,23,454.56 | 59 ₹1,00,639.84 | 70 ₹1,19,403.2 | 54 ₹92,111.04 Lowest | 65 ₹1,10,874.4 |
| 9.00 | Providing coarse clean local SAND IN FILLING in foundation trenches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and 1.5 M lifts including cost of all materials, labours, royalty and taxes all complete as per building specification and direction of Engineer In charge | 242.91 | Cum | 625 ₹1,51,818.75 | 632 ₹1,53,519.12 | 695 ₹1,68,822.45 | 578 ₹1,40,401.98 Lowest | 695 ₹1,68,822.45 |
| 10.00 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling and plugging 12 mm diameter holes with cement mortar 1:2 (1 cement: 2 coarse sand) to match the existing floor. With Chlorpyriphos EC 20% with 1% concentration | 1,587 | Sqm | 268 ₹4,25,316 | 271 ₹4,30,077 | 298 ₹4,72,926 | 248 ₹3,93,576 Lowest | 298 ₹4,72,926 |
Tender Value
₹13.0 Cr
EMD Value
₹13.0 L
Closing Date
4 May 2026, 5:00 pmClosed
Project Director (Technical)
JUIDCO Bhavan, Kutchery Chowk
CONSTRUCTION OF MANJHIAON BUS STAND GARHWA JHARKHAND
2026_UDD_112705_1
JUIDCO/NIT/BS/Manjhiaon/694
Open Tender
Civil Works
Works
540 days
Manjhiaon
Please refer Tender documents.
5 documents required · 5 mandatory
₹25,000
₹13.0 L
21 Jul 2026
10 Apr 2026
5 May 2026
10 Apr 2026
4 May 2026
10 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | EARTH WORK | - | - | - | - |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | Sqm | - | - |
| 3 | Felling trees of the girth (measured at a height of 1 m above groundlevel), including cutting of trunks and branches, removing the roots andstacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth | - | Each | - | - |
| 4 | Beyond 60 cm girth upto and including 120 cm girth | - | Each | - | - |
| 5 | Earth Work in excavation in Foundation Trenches in Ordinary soil (vide classification of soil item -B) and disposal of excavated earth as obtained to a distance upto 50 M including all lift, leveling ramming the foundation trenches, removing roots of tree shrubs all complete as per approved design, building specification and direction of E/I | - | Cum | - | - |
| 6 | Extra for earth work in hard soil as per specification & direction of engineer in charge (Vide classification of soil item B) | - | Cum | - | - |
| 7 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock | - | Cum | - | - |
| 8 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | - | Cum | - | - |
| 9 | Providing coarse clean local SAND IN FILLING in foundation trenches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and 1.5 M lifts including cost of all materials, labours, royalty and taxes all complete as per building specification and direction of Engineer In charge | - | Cum | - | - |
| 10 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling and plugging 12 mm diameter holes with cement mortar 1:2 (1 cement: 2 coarse sand) to match the existing floor. With Chlorpyriphos EC 20% with 1% concentration | - | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.35 MB
SBDManjhiaon.pdf
Tender Documents • 17.03 MB
BOQ_152198.xls
BOQ • 0.79 MB
Corrimajh.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].