| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.3 LAccepted-Finance | ₹35.3 L | L1 | Accepted-Finance Being L1 |
| 2 | L2₹38.8 LRejected-Finance | ₹38.8 L | L2 | Rejected-Finance Being L2 |
| 3 | L3₹39.1 LRejected-Finance | ₹39.1 L | L3 | Rejected-Finance Being L3 |
| 4 | L4₹39.1 LRejected-Finance | ₹39.1 L | L4 | Rejected-Finance Being L4 |
| 5 | L5₹39.3 LRejected-Finance | ₹39.3 L | L5 | Rejected-Finance Being L5 |
Tender Value
₹64 L
EMD Value
₹1.3 L
Closing Date
11 Mar 2026, 2:00 pmClosed
Executive Engineer
Executive Engineer PWD R and B Gandhi Nagar I/C UWD
Construction of RCC boundary wall of the Old Campus along the road from Dr. Pandas residence to Main Gate at Old University Campus University of Jammu
2026_UDJK_304340_1
enit 151 dated 13-2-26
Open Tender
Civil Works
180 days
University of Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
Executive Engineer PWD R and B Gandhi Nagar I/C UW
₹1.3 L
20 Mar 2026
24 Feb 2026
13 Mar 2026
24 Feb 2026
11 Mar 2026
24 Feb 2026
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix)
Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge In cement mortar
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level and above plinth level
Centering and shuttering including strutting, propping etc. and removal of form for a.Foundations, footings, bases of columns etc. for mass concrete.
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
12mm Cement plaster of mix 1 : 6 ( 1 cement : 6 coarse sand)
Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm)
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required welded
Fencing with Angle post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 meters (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per meter cost of total length of barbed wire used. With G.I. barbed wire
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Disposal of Unwanted earth/mulba from the working site upto 10km
Deduction on account of retrival of old bricks found at site.
D/d existing iron used as fencing on old wall.
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_988585.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid