Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.2 LAccepted-AOC COLABA MUMBAI | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹62.8 L+₹2.2 L (3.60%)Rejected-Finance COLABA MUMBAI | L2 | Rejected-Finance Other than being lowest | |
| 3 | L3₹63.7 L+₹3.1 L (5.11%)Rejected-Finance | L3 | Rejected-Finance Other than being lowest | |
| 4 | L4₹64.6 L+₹4.0 L (6.56%)Rejected-Finance COLABA MUMBAI | YAVATMAL | MAHARASHTRA | 445001 | L4 | Rejected-Finance Other than being lowest | |
| 5 | L5₹65.5 L+₹4.9 L (8.08%)Rejected-Finance PLOT NO 1134 1196 MORIVALI VILLAGE TAL AMBARNATH DIST THANE AMBERNATH 421505 | AMBERNATH | THANE | MAHARASHTRA | 421505 | L5 | Rejected-Finance Other than being lowest |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
27 Mar 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
REPAIR ROUTINE MAINT OF 06 NOS ELECTRIC LIFTS (08 PS 13 PS LIFT AND MANNING AND OPERATION OF BLDG NO R 1, R 2, R 13, R 19, R26, R31, R33, R34, ASHA2, ASHA4, ASHA5 (TOTAL 11 NOS BUILDING) IN G 14 STOREY BUILDING AT NAVY NAGAR, RS COLABA UNDER GE (NW)
2024_MES_643709_1
8185/CWE (NW) Mumbai/E8
Open Tender
Civil Works
Item Rate
330 days
GE (NW) Navy Nagar
Class C
Category c (ii) and d (v)
8 documents required · 8 mandatory
₹1,000
Yes
GE (NW) Navy Nagar
₹1.1 L
Yes
3 Jun 2024
23 Feb 2024
29 Mar 2024
23 Feb 2024
27 Mar 2024
15 Mar 2024
23 Feb 2024 - 14 Mar 2024
Amount
SCHEDULE 'A' PART I Repairs/maintenance of lifts including carrying out daily check and periodical services of fully automatic electrical lift with power operated door simplex, collective control system with repair/maintenance of unserviceable damaged parts such as bearings, bushes all type of shoes headers, hangers, car door, door locks, control cards, connector/links, welding of crack/broken MS parts, Repairs/maintenance of unserviceable damaged door safety edge and or sensor mechanical safety lock, magnetic lock or contact, car position indicator, door sill, car door sill necessary wiring, hall push button assembly,Landing Operating Panel of any size and capacity including all connected Accessories, complete with illuminated push button & direction indicator with LED display with LPT/LPC card of stainless steel inclusive of harness wiring for luminating of push button of each floors and cutting wall including making good distrubed surface as per existing surface & cable as per requirement or safe operation of lifts minor repair to cabin, cabin light, fan etc ensure safety and smooth functioning of lift and disconnecting and repairs/maintenance of unserviceable/worn out parts such as warm wheel, warm shaft bushes, thrust bearing, pedestal bearing and necessary packing including overhaling, cleaning alignment of gear box assembly and after Repairs/replacement of wornout parts re-assembley and fixing with existing machine with proper alignment complete maintanance of car top, binding of loose wire at control panel and rust painting at car top and door and allied parts including testing complete as directed by Engineer-in-Charge for the following lifts :- Note : - Two mechanics shall be available round the clock at lift complaint cell for safe & smooth functioning of the lift and to carry-out rescue operation.
Note : - (i) Two mechanics shall be available round the clock at lift complaint cell for safe & smooth functioning of the lift and to carry-out rescue operation. (ii) The Contractor has to carry out the AMC of the Lifts through OEM or authorized rep of OEM only. (iii) The AMC should cover any/all parts of Lifts its function found defective the same should be repaired or replaced by the OEM as per the timeline covered under norms.
8 Ps (544 Kg) capacity lift (G+14) installed in bldg No R-19, R-21, R-32, R-33 ,NKG and Tula (Total 6 Nos lift).
13Ps (884 Kg) capacity lift (G+14) installed in bldg No NKG and R-32 (Total 02 Nos lift).
SCHEDULE 'A' PART Il Taking down old unserviceable STM- Belt PV30 -1.73S-PU-42 and supply and fixing STM- Belt PV30 -1.73S-PU-42 complete all as specified and directed by Engr in Charge
Supply and fixing in repairs Governer rope of size 8 mm dia(8/19 Construction) ungalvanised including necessary connection with pully in machine room and shaft pit complete with clamps, nuts bolts, and washers etc, for high rise building for 8/13/Goods lifts complete all as specified and directed by Engr in Charge
Supply and fixing in repairs CEGARD MINI w/Y Cable harness along with control box in full height( 2.00 Mtr) complete as specified and directed by Engineer-in-Charge.
Supply and fixing in repairs retrofit belt pulley complete all as specified and directed by Engr-in-Charge.
Supply and fixing in repairs automatic door drive unit with VVVF of 1 HP capaicity complete all as specified and directed by Engineer-in-Charge.
Supply and fixing in repairs landing push button box along with illuminated call button with control wiring suitable for lift of G+14 storey building complete all as directed by Engineer-in-Charge.
Dismantling and taking out unserviceable old control panel and control wiring and supply and fixing new CAN BAS Integrated Drive based collective control panel in hinged MS powder coated cabinet with control wiring comprising with multiple microcontrolled programmed chip based, controlled by pulse modulation, complete with all safeties such as thermal overload protection, over current protection, auto phase reverse link to each other in net work and compatible to 18 KW/24HP capacity VVVF drive including proper connection with proper lugs, terminal connectors, screws and motor connection with galvanised sheet trunking 24 SWG including wiring of main motor with suitable size of stranded copper cable etc complete all as specified and directed by Engineer-in-Charge.
Supply and fixing in repairs shaft wiring in hoist way upto lower limit with PVC insulated copper conductor cable single core, 1100 Volts grade 0.75 Sqmm 24 Nos single core & 1.0 Sqmm for earth wire duly bunched with wire binding locking strip, drawing through in and including galvanised sheet metal trunking of 24 SWG up to ground floor in hoist for control to all function including inbuilt connection for control panel, PCB, Hall push button, fire switch and lower limit switch suitable for lift installed in G+14 Storey building complete all as specified and directed by the Engineer-in-Charge. .
Supply and fixing in repairs CAN BAS Integrated drive suitable for 13 Ps lift G+14 storey building including making all electric connection complete all as specified and directed by Engr in Charge.
Supply and fixing in repairs aluminium covered wire wound dynamic breaking resistor to absorb the reverse energy dissipation of motor during regeneration in control operation suitable for 11.0KW/15HP motor complete all as specified and directed by Engr in Charge.
Disconnecting and taking out unserviceable ARD and repair of ARD for proper operation including necessary wiring with machine and controller consisting of the following :-
Supply and fixing in repairs PCB Card, relay with control wiring for lift installed in G+14 storey building complete all as specified and directed by Engr in Charge
Supply and fixing in repairs ARD system suitable for upto 15/18 KW motor including wiring with connected items in existing G+14 Storey building for 8 ps/ 13 ps/ Goods lifts 415V,50 Hz,3 phase with a speed of 1.2 mtr/sec including maintenance free battery 12 V, 18 AH (04 Noswith five year Maintenance free battery) to match with the existing capacity motor and controller system and testing on completion complete all as specified and directed by Engineer-in-Charge.
SCHEDULE 'A' PART Ill Manning and operation of electrically operated lifts (6Ps,8 Ps & 13Ps) per Bldg, of any make and capacity daily 08 hrs in one shift from 0600 hrs to 1400 hrs including Sundays & holidays, including cleaning, taking care of entire lift installation from any pilferage, theft or damage etc complete all as directed by Engineer-in-Charge for R-1, R-2, R-13, R-19, R-26, R-31, R-33, R-34, Asha-2, Asha-4, Asha-5 one lift attendant (semi- skilled) each for (11 Nos Building) ( 1 shift x 11 Nos x 11 months) = 121
NOTES (i) Passes will be processed alongwith (after verification on signed certificate, Pass shall not be granted without submission of qualification proof & experience certificate for lift operator of not less than 5 years in the field. In case of OEM, the qualification mentioned in note is not applicable which shall be verified by Engineer-in-Charge before issue of passes. (ii) Contractor shall submit ID proof, Residential proof, Bank A/C details to department and obtain approval of Engineer-in-Charge before employing a person as Operator (iii) Payment to employees shall be done by crossed cheque through Aadhaar linked bank account only and it shall not be less than minimum fair wages as per act in vogue. The contractor shall submit proof to Engineer-in-Charge before claiming any payment. (iv) Lift operator (semi skilled) shall be available with lift cell as per the shift timings specified in the tender and he will report to JE E/M in-Charge or Lift Cell in-Charge. In case of emergency he will function according to their direction. If he is found absent or move without intimating to in-Charge of Lift Cell or JE E/M he will be treated as absent for the said shift and recovery to this effect for Rs 1500/- per shift shall be affected. (v) Payment as per quoted rate shall also be deducted in addition to the penalty as specified above. (vi) In case of malfunctioning if any noticed, lift operator shall intimate to the lift cell.
(vii) In case of any necessity for rescue operation or accident, Rescue Operator shall be capable of rescue the passenger and reacting to the situation (accident etc) Rescue operator engaged for rescue operation shall immediate attend the complaint within 30 minutes failing which penalty at Rs 500/- per hour or part thereof shall be levied (viii) Contractor shall submit the labour licenece as applicable as per latest laws/acts & Copy of GST Regn registered number issued by concerned authority. (ix) Insurance coverage, compensation if any applicable or necessitated due to mis operation of lift shall be the responsibility of contractor. The quantum of compensation shall be assessed based on the BOO composing of Lift Inspector of Maharashtra State, representatives of both agencies carrying out M&O works and routine maintenance work of lift and members from department. (x) Contractor has to submit proof of payment of EPF subscription made by him as applicable as per latest laws/acts alongwith RAR failing which RAR will not be progressed for payment.
(xi) The bidders shall not quote rate less than minimum fair wages including other statutory requirement such EPF and ESI including GST as given at para 19 of Sch A Notes. If the quoted amount is less than the estimated cost, the lowest bidder will have to deposit FDR/BGB as elaborated herein after in favour of Accepting Officer within 07 days of opening of financial bid. (xii) The deposited amount shall be the difference between estimated cost and amount quoted by lowest bidder for respective item. FDR/BGB shall be released only after satisfactory completion of work. If the contractor fails to pay minimum wages to employees and other statutory requirments like EPF and ESI, the department shall have right to withhold the said amount which will be verified and confirmed by GE. The decision of Accepting Officer regarding amount to be withhold shall be final and binding. The withhold amount will be utilised by GE for payment to employees if contractor fails to pay minimum wages and balance amount if any shall only be released. If the lowest bidder fails to deposit the amount as stated above within 07 working days, it shall be treated as willful negligence of the bidder with ulterior motives and such tenderer shall be banned from bidding for a period of six months commencing from the date of opening of Financial Bid . The contractor shall sumbit 03 Nos of BGBs/FDRs of equal amount as mentioned above. The BGBs/FDRs validity shall be 04 months, 08 month & 12 months respectively for the purpose of encashment/ release as the case may be. (xiii) The rates quoted shall be inclusive of suitable reliver wherever sundays & holidays are mentioned for working (xiv) Quoted rates should include Stationary,Uniform,Shoes,log book and all safety equipments/ Harness which shall be included as part of contractors profit.
Monarch Enterprises
Shree Elevator Engineering Co.
Escon Elevators Pvt Ltd
shakti engineering and electrical works
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .