Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.2 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹43.7 L+₹1.7 L (4.10%)Rejected-Finance WARD NO 26 OLD 36 NEW NEAR FIRE BRIGADE OFFICE RCP TAL COLONY ROAD SURATGARH 335804 SRI GANGANAGAR RAJ | SURATGARH | SRI GANGANAGAR | RAJASTHAN | 335804 | L2 | Rejected-Finance Other than lowest Bid | |
| 3 | L3₹43.9 L+₹1.9 L (4.42%)Rejected-Finance BHAGAT SINGH CHOWK SURATGARH 335804 DISTT SRIGANGANAGAR RAJ | GANGANAGAR | RAJASTHAN | 335804 | L3 | Rejected-Finance Other than lowest Bid | |
| 4 | L4₹45.5 L+₹3.5 L (8.30%)Rejected-Finance 3 107 HOUSING BOARD SRI GANGANAGAR PIN 335001 RAJ | GANGANAGAR | RAJASTHAN | 335001 | L4 | Rejected-Finance other than lowest Bid |
| Sl No | Description | Qty | Unit | AK CONSTRUCTION L1 | M/S Shree Ram Enterprises L3 | M/s Shubham Enterprises L2 | SHILPI CONSTRUCTION COMPANY L4 |
|---|---|---|---|---|---|---|---|
| .01BOQ (COMPREHENSIVE MAINTENANCE TO B/R SERVICES IN CERTAIN BUILDINGS IN ZONE ‘A’ AT TECHNICAL AREA AT AF STATION SURATGARH ) | |||||||
| 1.00 | Demolition of brick masonry built in cement mortar including all quoins, arches and removing rubbish from site etc. complete all as specified and directed. | 7 | Cum | 250 ₹1,750 | 200 ₹1,400 Lowest | 355 ₹2,485 | 225 ₹1,575 |
| 2.00 | M&L for brick work with sub class 'B' bricks, straight or curved on plan exc 6 m mean radius built in cm 1 : 6 complete all as specified and as directed by Engr-in-Charge. | 5 | Cum | 4,500 ₹22,500 | 4,000 ₹20,000 | 4,555 ₹22,775 | 3,500 ₹17,500 Lowest |
| 3.00 | All as per Ser item No 2 here in before but using old bricks | 2 | Cum | 2,500 ₹5,000 | 1,600 ₹3,200 Lowest | 2,357 ₹4,714 | 2,100 ₹4,200 |
| 4.00 | Demolition of cement concrete of any description and in any position not otherwise specifically provided for and removing rubbish from the premises. complete all as specified and as directed. | 1 | Cum | 500 ₹500 | 890 ₹890 | 355 ₹355 | 100 ₹100 Lowest |
| 5.00 | M&L Providing and injecting chemical emulsion for Post Constructional Anti-termite Treatment of soil under existing floors using emulsion @ one litre per hole, 300mm apart including drilling and plugging 12mm dia holes with cement mortar 1:2 (1 cement :2 coarse sand) to match the existing floors all as specified by Engineer-in-charge. | 200 | Sqm | 280 ₹56,000 | 165 ₹33,000 | 129 ₹25,800 Lowest | 145 ₹29,000 |
| 6.00 | M&L Providing and injecting chemical emulsion for Post Constructional Anti-termite Treatment Along the external wall below concrete or masonry apron using chemical emulsion @ 2.25 litres per linear metre including drilling and plugging holes etc. in apron complete all as specified by Engineer-in-charge. | 1,000 | RM | 70 ₹70,000 | 65 ₹65,000 Lowest | 91 ₹91,000 | 110 ₹1,10,000 |
| 7.00 | Post construction treatment at points of contact of wood work by chemical emulsion (in oil or kerosene based solution) @ 0.50 ltr / hole by drilling 6mm dia. Hole at a down ward angle of 45 degree at 150mm centre to centre snd sealing the same complete all as specified and directed by Engr-In-Charge. | 10 | RM | 120 ₹1,200 | 80 ₹800 Lowest | 205 ₹2,050 | 245 ₹2,450 |
| 8.00 | Demolition of cement concrete (un-reinforced ) of any description in ground floors and paving not exceeding 15 cm thick (below or above the ground level) and removing rubbish from the premises. complete all as specified and directed. | 35 | Cum | 300 ₹10,500 | 400 ₹14,000 | 205 ₹7,175 Lowest | 300 ₹10,500 |
| 9.00 | Taking down chowkats or frames including shutters (without taking off shutters from the frame) not exc. 1.5 Sqm each and removing from site complete all as specified and direcetd. | 18 | Each | 150 ₹2,700 | 150 ₹2,700 | 115 ₹2,070 | 100 ₹1,800 Lowest |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
4 Sept 2026, 6:00 pmClosed
GE AF SURATGARH
SURATGARH
COMPREHENSIVE MAINTENANCE TO B/R SERVICES IN CERTAIN BUILDINGS IN ZONE A AT TECHNICAL AREA AT AF STATION SURATGARH
2026_MES_782974_1
8352/E8
Open Tender
Civil Works
Item Rate
240 days
GE AF SURATGARH
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
GE AF SURATGARH
₹1 L
Yes
24 Sept 2026
6 Aug 2026
7 Sept 2026
6 Aug 2026
4 Sept 2026
21 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.01 | BOQ (COMPREHENSIVE MAINTENANCE TO B/R SERVICES IN CERTAIN BUILDINGS IN ZONE ‘A’ AT TECHNICAL AREA AT AF STATION SURATGARH ) | - | - | - | - |
| 1 | Demolition of brick masonry built in cement mortar including all quoins, arches and removing rubbish from site etc. complete all as specified and directed. | 7 | Cum | 141 | ₹987 |
| 2 | M&L for brick work with sub class 'B' bricks, straight or curved on plan exc 6 m mean radius built in cm 1 : 6 complete all as specified and as directed by Engr-in-Charge. | 5 | Cum | 142 | ₹710 |
| 3 | All as per Ser item No 2 here in before but using old bricks | 2 | Cum | 143 | ₹286 |
| 4 | Demolition of cement concrete of any description and in any position not otherwise specifically provided for and removing rubbish from the premises. complete all as specified and as directed. | 1 | Cum | 144 | ₹144 |
| 5 | M&L Providing and injecting chemical emulsion for Post Constructional Anti-termite Treatment of soil under existing floors using emulsion @ one litre per hole, 300mm apart including drilling and plugging 12mm dia holes with cement mortar 1:2 (1 cement :2 coarse sand) to match the existing floors all as specified by Engineer-in-charge. | 200 | Sqm | 145 | ₹29,000 |
| 6 | M&L Providing and injecting chemical emulsion for Post Constructional Anti-termite Treatment Along the external wall below concrete or masonry apron using chemical emulsion @ 2.25 litres per linear metre including drilling and plugging holes etc. in apron complete all as specified by Engineer-in-charge. | 1,000 | RM | 145 | ₹1,45,000 |
| 7 | Post construction treatment at points of contact of wood work by chemical emulsion (in oil or kerosene based solution) @ 0.50 ltr / hole by drilling 6mm dia. Hole at a down ward angle of 45 degree at 150mm centre to centre snd sealing the same complete all as specified and directed by Engr-In-Charge. | 10 | RM | 145 | ₹1,450 |
| 8 | Demolition of cement concrete (un-reinforced ) of any description in ground floors and paving not exceeding 15 cm thick (below or above the ground level) and removing rubbish from the premises. complete all as specified and directed. | 35 | Cum | 145 | ₹5,075 |
| 9 | Taking down chowkats or frames including shutters (without taking off shutters from the frame) not exc. 1.5 Sqm each and removing from site complete all as specified and direcetd. | 18 | Each | 146 | ₹2,628 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.77 MB
BOQ_877234.xls
BOQ • 1.54 MB
Tenderdocuments8352.pdf
Tender Documents • 1.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .