| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | -0.07% | ₹1.9 L | L1 | Admitted-Finance |
| 2 | L2₹2.0 L+₹2,725.95 (1.40%)Admitted-Finance | +1.33% | ₹2.0 L+₹2,725.95 (1.40%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 L+₹3,446.38 (1.77%)Admitted-Finance 8 2 4 8 NABIN CHAND BORAL LANE KOLKATA 700012 | KOLKATA | WEST BENGAL | 700012 | +1.70% | ₹2.0 L+₹3,446.38 (1.77%) | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
14 Aug 2026, 2:00 pmClosed
Dy.C.E. (WS)
CMO BUILDING, 5, S. N BANERJEE ROAD KOL-700 013
FABRICATION AND INSTALLATION OF DELIVERY LINE TO COMMON HEADER FROM NEW PUMP UNIT NO. 4 AT MUKUNDAPUR BPS
2026_KMC_1035615_1
KMC/WS/MBPS/26-27/02
Open Tender
Miscellaneous Works
Percentage
15 days
MUKUNDAPUR BPS
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,000
1 Sept 2026
5 Aug 2026
17 Aug 2026
5 Aug 2026
14 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DJB ITEM CODE 26.1.6 EARTH WORK IN EXCAVATION MECHANICAL MEANS (HYDRAULIC EXCAVATOR)/MANUAL MEANS IN FOUNDATION TRENCHES OR DRAINS (NOT EXCEEDING 1.5 M IN WITH OR 10 SQM ON PLAN), INCLUDING DRESSING OF SIDES AND RAMMING OF BOTTOMS, LIFT UP TO 1.5 M, INCLUDING GETTING OUT THE EXCAVATED SOIL AND DISPOSAL OF SURPLUS EXCAVATED SOIL AS DIRECTED, WITHIN A LEAD OF 50 M. (SCHEDULE OF RATE 24-25 DELHI JAL BOARD) | 18.9 | M3 | 205.45 | ₹3,883 |
| 2 | DJB ITEM CODE 26.1.11 CENTERING AND SHUTTERING INCLUDING STRUTTING, PROPPING ETC. AND REMOVAL OF FORM WORK FOR FOUNDATIONS, FOOTINGS, BASES FOR COLUMNS FOR ALL HEIGHTS ETC. FOR MASS CONCRETE. (SCHEDULE OF RATE 24-25 DELHI JAL BOARD) | 37.8 | SQM | 307.95 | ₹11,640.51 |
| 3 | DJB ITEM CODE 26.1.28 SUPPLY OF MS PIPE OF ALL SIZES. (SCHEDULE OF RATE 24-25 DELHI JAL BOARD) | 492.98 | KG | 88.55 | ₹43,653.38 |
| 4 | CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.3 M.S. Pipes 2.3.1 Gas cutting of M.S. pipes and/or M.S. plates of different thickness all complete as per specification and direction of the Engineer-in- Charge. Thikness in mm 5mm to 8mm thick plate | 31.4 | MTR | 298 | ₹9,357.2 |
| 5 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 2. Welding in M.S. structural work with gas or electric: (a) Tack weld | 365 | PNT | 9 | ₹3,285 |
| 6 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 2. Welding in M.S. structural work with gas or electric: (b) Continuous weld. | 6,280 | PCM | 9 | ₹56,520 |
| 7 | CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.26 Hire charges of moveable crane with fuel & manpower having load handling capacity upto 14MT with the 45 deg. moveable arrangement & the boom length of 40 feets for loading & unloading of various materials / accessories of water supply works. For minimum engagement of 8 hrs. In a day | 2 | DAY | 7,936 | ₹15,872 |
| 8 | CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.1.6 Flange joint to C.l./D.l/MS. pipes and specials including supply of rubber gasket. nuts. bolts. washers etc. of best quality to make the joint watertight at required hydraulic pressure all complete as per specification & direction of the Engineer-in-Charge. Diameter in mm 700mm dia. | 1 | EA | 4,271 | ₹4,271 |
| 9 | CHAPTER - VII MISCELLANEOUS ITEMS Coating of 'Food Gr. Epoxy' Resin of thickness not less than 240 micron with a low-viscosity, crystallization-resistant food grade epoxy resin base with a reactive diluents combined with high build epoxy amine adducts as per BS 5493 standard and a polyamide or amido polyamine or any other suitable hardener. It shall react with epoxy resin at normal ambient temperature, suitable for solvent-free coatings as per recommended proportion for use on metal, concrete and wood surface to protect from corrosion, give anti-fungal properties ,as per guide line of FDA and USDA as well as damage from chemical reaction after making the surface free from dust, oil and moisture etc. all complete as per instruction and to the satisfaction of ElC. [ This item will be operated on prior permission from the concerned SE/Dy Chief Engineer] | 12.56 | SQM | 802 | ₹10,073.12 |
| 10 | DJB ITEM CODE 49.1.3 FILLING AVAILABLE EXCAVATED EARTH (EXCLUDING ROCK) IN TRENCHES, SIDES OF FOUNDATIONS, ETC. INLAYERSNOTEXCEEDING20CMINDEPTH, CONSOLIDATING EACH DEPOSITED LAYER BY RAMMING AND WATERING, LEAD UP TO 50METERS. (SCHEDULE OF RATE 24-25 DELHI JAL BOARD) | 18.9 | M3 | 255 | ₹4,819.5 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
techbid.pdf
Tender Documents • 0.46 MB
BOQ_2543901.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .