Tender Value
₹38.5 L
EMD Value
₹39,000
Closing Date
2 Jun 2020, 3:00 pmClosed
The Project Director
The Project Director DRDA,VELLORE
Renovation of 9 no of Ponds Ooranies,Kulam Kuttai in Kandhili Block of Vellore District under Renovation of Rural Water Bodies SFC Grant 2019-20 Package no-54
2020_RDTN_158523_1
A9/3844/2020
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹39,000
6 Jun 2020
20 Feb 2020
2 Jun 2020
20 Feb 2020
2 Jun 2020
20 Feb 2020
Amount
KANDHILI BLOCK P-54 9Nos. Works
1.Renavation of Eatti kuttai in Survey No. 60 in Annai sathiya nager Village H/O Periyagaram panchayat
Clearing the juliflora jungle without uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidential charges etc. Complete
Earth work in all soils except hard rock requiring blasting and conveying for formattion of bunds with leads 0 to 100m deploying earth moving machinery and tippers including benching ,formation of bunds,breaking clods,sectioning etc complete.
Construction of Revetment
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Plain Cement Concret 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supllying suitable gravel and providing gravel packing for revetment including machine the same for premeaserment spreading and woaring with water to plastic waste complweted as directed by the engineerincharge
Rough stone dry Packing for revetment and apron using new stone obtained by approved sources incliding the cost of new wedges for filling the gaps etc,and completed
Provision for Name Board
2.Renavation of Chetta kuttai in Survey No.651 in Panchanampathy Village H/O Adiyur panchayat
Clearing the juliflora jungle without uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidential charges etc. Complete
Earth work in all soils except hard rock requiring blasting and conveying for formattion of bunds with leads 0 to 100m deploying earth moving machinery and tippers including benching ,formation of bunds,breaking clods,sectioning etc complete.
Construction of Revetment
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Plain Cement Concret 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supllying suitable graavel and providing gravel packing for revetment including machine the same for premeaserment spreading and woaring with water to plastic waste complweted as directed by the engineerincharge
Rough stone dry Packing for revetment and apron using new stone obtained by approved sources incliding the cost of new wedges for filling the gaps etc,and completed
Construction of Weir
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete.
Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications etc., complete.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Provision for weep hole arrangements
Provision for Tar Pad arrangements
Provision for Name Board
3.Renavation of Karakaran kuttai in Survey No.40 in Karakaran kottai Village H/O Chinnakandhili panchayat
Clearing the juliflora jungle without uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidential charges etc. Complete
Earth work in all soils except hard rock requiring blasting and conveying for formattion of bunds with leads 0 to 100m deploying earth moving machinery and tippers including benching ,formation of bunds,breaking clods,sectioning etc complete.
Construction of Revetment
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Plain Cement Concret 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supllying suitable gravel and providing gravel packing for revetment including machine the same for premeaserment spreading and woaring with water to plastic waste complweted as directed by the engineerincharge
Rough stone dry Packing for revetment and apron using new stone obtained by approved sources incliding the cost of new wedges for filling the gaps etc,and completed
Provision for Name Board
4.Renavation of Bodhi kuttai in Survey No.77/1 in Bodikuttai Village H/O Gummidhigampatti panchayat
Clearing the juliflora jungle without uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidential charges etc. Complete
Earth work in all soils except hard rock requiring blasting and conveying for formattion of bunds with leads 0 to 100m deploying earth moving machinery and tippers including benching ,formation of bunds,breaking clods,sectioning etc complete.
Construction of Revetment
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Plain Cement Concret 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supllying suitable gravel and providing gravel packing for revetment including machine the same for premeaserment spreading and woaring with water to plastic waste complweted as directed by the engineerincharge
Rough stone dry Packing for revetment and apron using new stone obtained by approved sources incliding the cost of new wedges for filling the gaps etc,and completed
Provision for Name Board
5.Renavation of Komutti kuttai in Survey No 512 in Kalarpathi Village H/O Kurumberi panchayat
Clearing the juliflora jungle without uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidential charges etc. Complete
Earth work in all soils except hard rock requiring blasting and conveying for formattion of bunds with leads 0 to 100m deploying earth moving machinery and tippers including benching ,formation of bunds,breaking clods,sectioning etc complete.
Construction of Weir
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete.
Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications etc., complete.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Provision for weep hole arrangements
Provision for Tar Pad arrangements
Provision for Name Board
6.Renavation of Pudhupattu kuttai in Survey No461 in Merkathiyanur Village H/O Matrapalli panchayat
Clearing the juliflora jungle without uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidential charges etc. Complete
Earth work in all soils except hard rock requiring blasting and conveying for formattion of bunds with leads 0 to 100m deploying earth moving machinery and tippers including benching ,formation of bunds,breaking clods,sectioning etc complete.
Construction of Revetment
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Plain Cement Concret 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supllying suitable gravel and providing gravel packing for revetment including machine the same for premeaserment spreading and woaring with water to plastic waste complweted as directed by the engineerincharge
Rough stone dry Packing for revetment and apron using new stone obtained by approved sources incliding the cost of new wedges for filling the gaps etc,and completed
Provision for Name Board
7.Renavation of Thai chetty kuttai in Survey No.7 in Kenginaikenpatti Village H/O Natham panchayat
Clearing the juliflora jungle without uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidential charges etc. Complete
Earth work in all soils except hard rock requiring blasting and conveying for formattion of bunds with leads 0 to 100m deploying earth moving machinery and tippers including benching ,formation of bunds,breaking clods,sectioning etc complete.
Construction of Revetment
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Plain Cement Concret 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supllying suitable gravel and providing gravel packing for revetment including machine the same for premeaserment spreading and woaring with water to plastic waste complweted as directed by the engineerincharge
Rough stone dry Packing for revetment and apron using new stone obtained by approved sources incliding the cost of new wedges for filling the gaps etc,and completed
Provision for Name Board
8.Renavation of Manarivattam kuttai in Survey No.72 in Manari vattam Village H/O Periyakannalapatti panchayat
Clearing the juliflora jungle without uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidential charges etc. Complete
Earth work in all soils except hard rock requiring blasting and conveying for formattion of bunds with leads 0 to 100m deploying earth moving machinery and tippers including benching ,formation of bunds,breaking clods,sectioning etc complete.
Construction of Revetment
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Plain Cement Concret 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supllying suitable gravel and providing gravel packing for revetment including machine the same for premeaserment spreading and woaring with water to plastic waste complweted as directed by the engineerincharge
Rough stone dry Packing for revetment and apron using new stone obtained by approved sources incliding the cost of new wedges for filling the gaps etc,and completed
Provision for Name Board
9.Renavation of Murugen kuttai in Survey No.1159 in Murugan kovil vattam Village H/O Sevathur panchayat
Clearing the juliflora jungle without uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidential charges etc. Complete
Earth work in all soils except hard rock requiring blasting and conveying for formattion of bunds with leads 0 to 100m deploying earth moving machinery and tippers including benching ,formation of bunds,breaking clods,sectioning etc complete.
Construction of Revetment
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Plain Cement Concret 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supllying suitable gravel and providing gravel packing for revetment including machine the same for premeaserment spreading and woaring with water to plastic waste complweted as directed by the engineerincharge
Rough stone dry Packing for revetment and apron using new stone obtained by approved sources incliding the cost of new wedges for filling the gaps etc,and completed
Provision for Name Board
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .