| 1 | 1₹26.4 LAccepted-AOC H 11 HOUSING BOARD UNIT MADHAYANKUTTAI P O METTUR DAM 636452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹26.4 L Quoted ₹27.0 L | 1 | Accepted-AOC L1 |
| 2 | 2₹28.5 LRejected-AOC M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹28.5 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | THIAGARAJAN ENGINEERING CONTRACTOR L2 | KPRABHAKARAN ENGINEERING CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for dismantling of Air motors/inspection and renewal of internals, vanes, bearings and reassembling works. | 6 | No. | 5,230 ₹31,380 | 4,980 ₹29,880 |
| 2.00 | Charges for Attending ESP field failure. | 48 | No. | 7,035 ₹3.4 L | 6,700 ₹3.2 L |
| 3.00 | Charges for cleaning the accumulated coal dust, fly ash & other waste materials and air washing of the hot primary air duct, hot secondary air duct, various floors of Air pre heater, flue gas duct, cold primary air duct, cold secondary air duct, Primary air fan, Forced draught fan, Induced draught fan and its floors, ESP CRM floor, ESP roof top, structure, floor, walk way, hand rails, pipes etc from Economizer out let to chimney in Units III & IV area. | 42 | Times | 29,830 ₹12.5 L | 28,410 ₹11.9 L |
| 4.00 | Charges for renewal of worn out Multi disc & coupling Bolts | 6 | No. | 21,105 ₹1.3 L | 20,100 ₹1.2 L |
| 5.00 | Charges for dismantling, renewal of bearings & Gears and internals, reassembling of CRM gear boxes. | 6 | No. | 14,070 ₹84,420 | 13,400 ₹80,400 |
| 6.00 | Charges for dismantling, renewal of bearings & Gears and internals, reassembling of ERM gear boxes. | 6 | No. | 10,890 ₹65,340 | 10,275 ₹61,650 |
| 7.00 | Charges for cleaning and dismantling of ID cooler | 3 | No. | 13,495 ₹40,485 | 12,855 ₹38,565 |
| 8.00 | Charges for assembling of ID cooler | 3 | No. | 23,020 ₹69,060 | 21,920 ₹65,760 |
| 9.00 | Charges for hydraulic testing of the renewed working oil cooler @ 15 Kg/Cm2 pressure for 30 minutes in the presence of Board Engineer | 3 | No. | 9,170 ₹27,510 | 8,650 ₹25,950 |
| 10.00 | APH – Inspection of speed reducer internals. | 3 | No. | 25,480 ₹76,440 | 24,035 ₹72,105 |
Tender Value
Refer Docs
EMD Value
₹23,900
Closing Date
19 Mar 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I Boiler Rotating parts Units III and IV Preventive and Breakdown maintenance Works and other allied works as and when required basis for the period of 365 days from the date of commencement of work
2025_EB_529968_1
CE / MTPS-I / SE / M-I / BM /OT.312 / 2024-25
Open Tender
Power/Energy Projects/Products
365 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹23,900
Yes
25 May 2026
5 Mar 2025
20 Mar 2025
5 Mar 2025
19 Mar 2025
5 Mar 2025
Amount
Charges for dismantling of Air motors/inspection and renewal of internals, vanes, bearings and reassembling works.
Charges for Attending ESP field failure.
Charges for cleaning the accumulated coal dust, fly ash & other waste materials and air washing of the hot primary air duct, hot secondary air duct, various floors of Air pre heater, flue gas duct, cold primary air duct, cold secondary air duct, Primary air fan, Forced draught fan, Induced draught fan and its floors, ESP CRM floor, ESP roof top, structure, floor, walk way, hand rails, pipes etc from Economizer out let to chimney in Units III & IV area.
Charges for renewal of worn out Multi disc & coupling Bolts
Charges for dismantling, renewal of bearings & Gears and internals, reassembling of CRM gear boxes.
Charges for dismantling, renewal of bearings & Gears and internals, reassembling of ERM gear boxes.
Charges for cleaning and dismantling of ID cooler
Charges for assembling of ID cooler
Charges for hydraulic testing of the renewed working oil cooler @ 15 Kg/Cm2 pressure for 30 minutes in the presence of Board Engineer
APH – Inspection of speed reducer internals.
Inspection ,replacing the worn out over running clutch and related works.
APH – Inspection – Replacing the worn out fluid coupling of the speed reducer.
Charges for renewal of Runner half coupling of both speed reducer side and fluid coupling side.
Charges for removal of insulation skin casing sheets and insulation for an area of 3m2 and removal of access door plate of 2m2 and refixing the same after completion of work.
Charges for dismantling and cleaning of PA / APH lub oil cooler
Charges for assembling of PA / APH lub oil cooler
Charges for hydraulic testing of the renewed working oil cooler @ 15 Kg/Cm2 pressure for 30 minutes
Charges for over hauling of Rotark /Auma actuator Model SA 100 E90 in Boiler area by leading, lifting, draining Oil, dismantling, cleaning, checking mechanical operation attending minor defects, renewing oil seal, O ring, gasket assembling.
Labour charges for welding eroded initial welding joints in the flue gas duct above 2 Meter level
Welding Electrodes
T & P and Consumable Charges for S.No.1 to 19
THIAGARAJAN ENGINEERING CONTRACTOR (BID ID -1273042)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid