Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAdmitted-Finance 4 R G BARUAH ROAD SUNDARPUR GUWAHATI KAMRUP ASSAM 781005 | KAMRUP METRO | ASSAM | 781005 | ₹7.9 L | L1 | Admitted-Finance |
| 2 | L2₹8.4 L+₹50,574.85 (6.38%)Admitted-Finance 107 265 BRAHAMA NAGAR KANPUR UP 208012 | KANPUR NAGAR | UTTAR PRADESH | 208012 | ₹8.4 L+₹50,574.85 (6.38%) | L2 | Admitted-Finance |
| 3 | L3₹9.2 L+₹1.3 L (16.2%)Admitted-Finance A 76 SURENDRA NAGAR ISMAILGANJ FAIZABAD ROAD LUCKNOW UTTAR PRADESH 226016 UDYAM UP 50 0018139 | LUCKNOW | UTTAR PRADESH | 226016 | ₹9.2 L+₹1.3 L (16.2%) | L3 | Admitted-Finance |
| 4 | L4₹10.9 L+₹3.0 L (37.5%)Admitted-Finance KARNATAKA | RAICHUR | KARNATAKA | 584123 | ₹10.9 L+₹3.0 L (37.5%) | L4 | Admitted-Finance |
| 5 | L5₹11.2 L+₹3.2 L (41.0%)Admitted-Finance GF 3 F 12 KSSIDC BUILDING 5TH CROSS 1ST STAGE PEENYA INDUSTRIAL ESTATE BANGALORE | BENGALURU URBAN | KARNATAKA | 560058 | ₹11.2 L+₹3.2 L (41.0%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | POWER ONE MICRO SYSTEMS PVT LTD L5 | ECS ENGINEERING PVT LTD L4 | DS Systems Pvt Ltd L1 | SUN POWER CONVERSION PVT LTD L3 | Awasthi Electric Works L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply, installation, testing, and commissioning of online UPS system of nominal capacity 40 KVA (3 phase 4 wire input and 3 phase 4 wire output) with SMF Battery for 30 mins backup, with MS Rack & IRIT Link for SMF Batteries, including providing battery interconnecting cables of copper conductor, copper lugs/thimbles, and necessary accessories as per requirement. | 1 | Job | 8,68,000 ₹8,68,000 | 8,85,000 ₹8,85,000 | 6,82,900 ₹6,82,900 | 7,50,000 ₹7,50,000 | 6,80,000 ₹6,80,000 Lowest |
| 2.00 | Dismantling of Existing 40 KVA UPS, including the dismantling of all accessories such as batteries, connecting cables etc complete as required along with shifting the dismantled UPS as per Directions of EIC. | 1 | Job | 30,000 ₹30,000 | 25,000 ₹25,000 | 10,000 ₹10,000 | 5,000 ₹5,000 Lowest | 12,000 ₹12,000 |
| 3.00All Inclusive Comprehensive Maintenance Contract of the 1 No. 40 KVA Online UPS System, ensuring serviceability, repairs, including supply & replacement of all defective spare parts of UPS (excluding batteries), quarterly preventive maintenance, breakdown maintenance as and when required, complete as per OEM recommendations. | ||||||||
| 3.01 | AICMC for First Year after one year DLP | 1 | Job/Annum | 50,000 ₹42,315 | 50,000 ₹42,315 | 25,000 ₹21,157.5 Lowest | 39,500 ₹33,428.85 | 35,000 ₹29,620.5 |
| 3.02 | AICMC for Second Year after one year DLP | 1 | Job/Annum | 55,000 ₹42,823 | 50,000 ₹38,930 | 25,000 ₹19,465 Lowest | 43,500 ₹33,869.1 | 38,500 ₹29,976.1 |
| 3.03 | AICMC for Third Year after one year DLP | 1 | Job/Annum | 61,000 ₹43,694.3 | 50,000 ₹35,815 | 30,000 ₹21,489 Lowest | 47,500 ₹34,024.25 | 42,000 ₹30,084.6 |
| 3.04 | AICMC for Fourth Year after one year DLP | 1 | Job/Annum | 68,000 ₹44,805.2 | 50,000 ₹32,945 | 30,000 ₹19,767 Lowest | 50,000 ₹32,945 | 46,500 ₹30,638.85 |
| 3.05 | AICMC for Fifth Year after one year DLP | 1 | Job/Annum | 76,000 ₹46,071.2 | 50,000 ₹30,310 | 30,000 ₹18,186 Lowest | 52,500 ₹31,825.5 | 51,500 ₹31,219.3 |
Tender Value
₹8.5 L
EMD Value
₹25,538
Closing Date
8 Aug 2026, 12:00 pmClosed
Sr. Manager (Engg.-Elect)
AAI, Dibrugarh Airport
REPLACEMENT OF 40 KVA UPS AT DWR BUILDING DIBRUGARH
2026_AAI_284120_1
AAI/DIB/ENGG(E)/CW-02/2026-27
Open Tender
Electrical Works
Item Rate
120 days
AAI, Dibrugarh Airport
As per NIT criteria
12 documents required · 12 mandatory
₹1,180
₹25,538
8 Sept 2026
15 Jul 2026
10 Aug 2026
15 Jul 2026
8 Aug 2026
15 Jul 2026
15 Jul 2026 - 22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Supply, installation, testing, and commissioning of online UPS system of nominal capacity 40 KVA (3 phase 4 wire input and 3 phase 4 wire output) with SMF Battery for 30 mins backup, with MS Rack & IRIT Link for SMF Batteries, including providing battery interconnecting cables of copper conductor, copper lugs/thimbles, and necessary accessories as per requirement. | 1 | Job | 1.25 | ₹1.25 |
| - | Dismantling of Existing 40 KVA UPS, including the dismantling of all accessories such as batteries, connecting cables etc complete as required along with shifting the dismantled UPS as per Directions of EIC. | 1 | Job | 1.25 | ₹1.25 |
| - | All Inclusive Comprehensive Maintenance Contract of the 1 No. 40 KVA Online UPS System, ensuring serviceability, repairs, including supply & replacement of all defective spare parts of UPS (excluding batteries), quarterly preventive maintenance, breakdown maintenance as and when required, complete as per OEM recommendations. | - | - | - | - |
| - | AICMC for First Year after one year DLP | 1 | Job/Annum | 1.25 | ₹1.25 |
| - | AICMC for Second Year after one year DLP | 1 | Job/Annum | 1.25 | ₹1.25 |
| - | AICMC for Third Year after one year DLP | 1 | Job/Annum | 1.25 | ₹1.25 |
| - | AICMC for Fourth Year after one year DLP | 1 | Job/Annum | 1.25 | ₹1.25 |
| - | AICMC for Fifth Year after one year DLP | 1 | Job/Annum | 1.25 | ₹1.25 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
TD.pdf
Tender Documents • 7.60 MB
BOQ_331601.xls
BOQ • 0.29 MB
Corrigendum_I.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .