Tender Value
₹5.0 Cr
EMD Value
₹10.0 L
Closing Date
2 Jul 2026, 3:00 pm
1)Khamgaon - Construction of Boundary wall at Khamgaon Station on UP and DN road (1380 m). Project id: 01.01.64.25.3.50.003 2)Nandura - Construction of Boundary wall at Nandura Station on UP and DN road (2060 m). Project id: 01.01.64.25.3.50.004 3)Shegaon - Construction of Boundary wall at Shegaon Station on UP and DN road (1740 m). Project id: 01.01.64.25.3.50.005 4)Biswa Bridge Station - Construction of Boundary wall at Biswa Bridge Station on UP and DN road (1340 m). Project id: 01.01.64.25.3.50.006
DRMWBSL192026t1
DRMWBSL192026t1
Open
12 Months
Raigad, Maharashtra
₹0
₹10.0 L
8 Jun 2026
8 Jun 2026
18 Jun 2026
and DN road (1340 m)
Item- 1 NS items
S No. Item Description of Item Unit Qty Rate Amount
1 NS-3 Providing & laying in position 7mm Dia HTS Kg 4250.00 137.00 582250.00
Indented wires with UTS of 1470 MPa confirming
to IS-6003 for manufacturing of PSC element by
using mechanical pulling arrangement like
Rabbit/ Bed master including all accessories for
stressing & destressing operations as per
approved make etc, complete as per drawings
and direction of Engineer - incharge. Note: The
rate is inclusive of all contractors labour,
materials including, cutting, pulling arrangement,
machineries, tools & plants, taxes etc. complete.
Payment will not be made for any wastages .
2 NS-5 "Providing & grouting of PSC Column with RCC Numbers 474.00 709.00 336066.00
Foundation as per approved drawing with M- 60
grade cementitious grout (Non Shrink) of
approved make by suitable means (Free
flowing/pump), curing etc. complete as per
directions of Engineer-in- charge. Note: The rate
is inclusive of all contractors labour, tools &
plants, all materials including approved quality of
non- shrink cementious grout og M60 grade,
aggregates, all machineries, placing in position,
etc. Complete in all respect. Payment will not be
made for any wastages."
BHUSAWAL DIVN-ENGINEERING/CENTRAL RLY
3 NS-1A "Fabrication, Manufacturing & Transportation of Each 1419.00 1293.00 1834767.00
Precast Prestressed Concrete elements of M45
grade design mix concrete (i) Fabrication &
manufacturing of Prestressed Concrete (Pre-
tensioned) elements such as panel, column etc.
as per approved drawing in Controlled Factory
Environment with approved methodology by
using long line casting met hod. Concreting
should be done by batch mixing plant with
capable of producing zero slump concrete,
transported through mechnical arrangement &
layed on the bed, finishing, curing and also
provision of steam curing. Cutting, making
necessary cutout/holes of required sizes for
services in PSC element after achieving required
strength, yard handling & stacking all complete
as per approved shop drawings & design mix as
per the direction of the En gineer-in-charge .
(Cost of HTS wires shall be paid separately under
relevant item). (ii) Transportation of Precast PSC
Elements from casting yard to site of work by
suitable Truck/Trailor with proper accessories,
including the cost of loading, unloading &
stacking at site with the help of required capacity
cranes . (iii) The rate is inclusive of all
ingredients i.e. cement, sand, aggregate,
admixtures, water etc. including handling,
batching, mixing, transporting, placing and
vibrating of concrete, curing, scaffolding,
shuttering, formwork, mould, staging, lifting
arrangement as per approved drawing etc. with
all lead and lift with contractor's own labour,
tools & plants machineries all taxes etc complete
as required for successful completion of the item.
Note-1: No payment shall be made for damaged
Precast elements Note-2: 70% payment shall be
made when PSC elements reach to site and
balance 30% payment shall be made after
erection & placement in position. Note-3: Incase
of change of size of precast PSC element,
payment shall be adjusted on volumetric pro-rata
basis. a) PSC Panel of Size 2330mm X 600mm X
80mm as per Approved Type Plan"
4 NS 4/c Erection & Installation of Precast PSC/RCC Each 474.00 832.00 394368.00
elements in correct & final position with proper
line, level and plumb at site making all
arrangements (i.e cranes, push-pull jacks & all
other T&P) for lifting, placing, Steel Props for
holding in position after Erection & Alignment of
elements, within erection tolerance as per
IS:15916 as per approved shop drawings and all
complete as per the direction of Engineer
grouting shall be paid separately). Note-1: The
rate is inclusive of all contractors labour,
materials including machineries, tools & plants,
etc. complete. Note-2: In case of change of size
of precast PSC element, payment shall be
adjusted on volumetric pro-rata basis. c) RCC
Foundation 1300mm X 800mm X 700mm as per
Approved Type Plan
BHUSAWAL DIVN-ENGINEERING/CENTRAL RLY
5 NS 4/a Erection & Installation of Precast PSC/RCC Each 1419.00 228.00 323532.00
elements in correct & final position with proper
line, level and plumb at site making all
arrangements (i.e cranes, push-pull jacks & all
other T&P) for lifting, placing, Steel Props for
holding in position after Erection & Alignment of
elements, within erection tolerance as per
IS:15916 as per approved shop drawings and all
complete as per the direction of Engineerin-
Charge. (Cost of grouting shall be paid
separately). Note-1: The rate is inclusive of all
contractors labour, materials including
machineries, tools & plants, etc. complete. Note-
2: In case of change of size of precast PSC
element, payment shall be adjusted on
volumetric pro-rata basis. a) PSC Panel of Size
2330mm X 600mm X 80mm as per Approved
6 NS 4/b Erection & Installation of Precast PSC/RCC Each 474.00 304.00 144096.00
elements in correct & final position with proper
line, level and plumb at site making all
arrangements (i.e cranes, push-pull jacks & all
other T&P) for lifting, placing, Steel Props for
holding in position after Erection & Alignment of
elements, within erection tolerance as per
IS:15916 as per approved shop drawings and all
complete as per the direction of Engineer in-
Charge. (Cost of grouting shall be paid
separately). Note-1: The rate is inclusive of all
contractors labour, materials including
machineries, tools & plants, etc. complete. Note-
2: In case of change 250mm as per Approved
Type Plan of size of precast PSC element,
payment shall be adjusted on volumetric pro-rata
basis. b) PSC Cloumn (H-Section) of size 2650mm
7 NS 4/d Erection & Installation of Precast PSC/RCC Each 474.00 19.00 9006.00
elements in correct & final position with proper
line, level and plumb at site making all
arrangements (i.e cranes, push-pull jacks & all
other T&P) for lifting, placing, Steel Props for
holding in position after Erection & Alignment of
elements, within erection tolerance as per
IS:15916 as per approved shop drawings and all
complete as per the direction of Engineer in-
Charge. (Cost of grouting shall be paid
separately). Note-1: The rate is inclusive of all
contractors labour, materials including
machineries, tools & plants, etc. complete. Note-
2: In case of change of size of precast PSC
element, payment shall be adjusted on
volumetric pro-rata basis. d) Column Cap 300mm
X 300mm X 150mm as per Approved Type Plan
BHUSAWAL DIVN-ENGINEERING/CENTRAL RLY
8 NS - "Fabrication, Manufacturing & Transportation of Each 474.00 1722.00 816228.00
1/b Precast Prestressed Concrete elements of M45
grade design mix concrete (i) Fabrication &
manufacturing of Prestressed Concrete (Pre-
tensioned) elements such as panel, column etc.
as per approved drawing in Controlled Factory
Environment with approved methodology by
using long line casting met hod. Concreting
should be done by batch mixing plant with
capable of producing zero slump concrete,
transported through mechnical arrangement &
layed on the bed, finishing, curing and also
provision of steam curing. Cutting, making
necessary cutout/holes of required sizes for
services in PSC element after achieving required
strength, yard handling & stacking all complete
as per approved shop drawings & design mix as
per the direction of the En gineer-in-charge .
(Cost of HTS wires shall be paid separately under
relevant item). (ii) Transportation of Precast PSC
Elements from casting yard to site of work by
suitable Truck/Trailor with proper accessories,
including the cost of loading, unloading &
stacking at site with the help of required capacity
cranes . (iii) The rate is inclusive of all
ingredients i.e. cement, sand, aggregate,
admixtures, water etc. including handling,
batching, mixing, transporting, placing and
vibrating of concrete, curing, scaffolding,
shuttering, formwork, mould, staging, lifting
arrangement as per approved drawing etc. with
all lead and lift with contractor's own labour,
tools & plants machineries all taxes etc complete
as required for successful completion of the item.
Note-1: No payment shall be made for damaged
Precast elements Note-2: 70% payment shall be
made when PSC elements reach to site and
balance 30% payment shall be made after
erection & placement in position. Note-3: Incase
of change of size of precast PSC element,
payment shall be adjusted on volumetric pro-rata
basis. b) PSC Column CH-Section) of size
2650mm X 250mm X 250mm with grooved as
per Approved Type Plan"
BHUSAWAL DIVN-ENGINEERING/CENTRAL RLY
9 NS - Fabrication, Manufacturing & Transportation of Each 474.00 4200.00 1990800.00
2/a Precast RCC elements of M30 grade design mix
concrete (i) Fabrication and manufacturing of
precast concrete element such as foundation &
column cap as per approved drawing,
manufactured in controlled factory environment
with approved methodology including moulds,
mixing, transporting and placing of concrete,
vibrating, curing, finishing, making necessary
cutout/holes of required sizes for services, yard
handling & stacking all complete as per
IS:11447:1985 and as per approved shop
drawings and design mix as per the direction of
Engineer in Charge (Cost of steel for
reinforcement shall be paid separately under
relevant item ) . (ii) Transportation of Precast
RCC Elements from casting yard to site of work
by suitable Truck/Trailor with proper accessories,
including the cost of loading, unloading &
stacking at site with the help of required capacity
cranes. ((iii) The rate is inclusive of all
ingredients i.e. cement, sand, aggregate,
admixtures, water etc. including handling,
batching, mixing, transporting, placing and
vibrating of concrete, curing, scaffolding,
shuttering, formwork, mould, staging etc. with all
lead and lift with contractor's own labour, tools &
plants machineries all taxes etc complete as
required for successful completion of the item.
Note-1: No payment shall be made for damaged
Precast elements. Note-2: 70% payment shall be
made when PSC elements reach to site and
balance 30% payment shall be made after
erection & placement in position . Note-3: Incase
of change of size of precast RCC element,
payment shall be adjusted on volumetric pro-rata
basis. a) RCC Foundation 1300mm X 800mm X
700mm as per Approved Type Plan
BHUSAWAL DIVN-ENGINEERING/CENTRAL RLY
10 NS - Fabrication, Manufacturing & Transportation of Each 474.00 97.00 45978.00
2/b Precast RCC elements of M30 grade design mix
concrete (i) Fabrication and manufacturing of
precast concrete element such as foundation &
column cap as per approved drawing,
manufactured in controlled factory environment
with approved methodology including moulds,
mixing, transporting and placing of concrete,
vibrating, curing, finishing, making necessary
cutout/holes of required sizes for services, yard
handling & stacking all complete as per
IS:11447:1985 and as per approved shop
drawings and design mix as per the direction of
EngineerinCharge (Cost of steel for
reinforcement shall be paid separately under
relevant item ) . (ii) Transportation of Precast
RCC Elements from casting yard to site of work
by suitable Truck/Trailor with proper accessories,
including the cost of loading, unloading &
stacking at site with the help of required capacity
cranes. ((iii) The rate is inclusive of all
ingredients i.e. cement, sand, aggregate,
admixtures, water etc. including handling,
batching, mixing, transporting, placing and
vibrating of concrete, curing, scaffolding,
shuttering, formwork, mould, staging etc. with all
lead and lift with contractor's own labour, tools &
plants machineries all taxes etc complete as
required for successful completion of the item.
Note-1: No payment shall be made for damaged
Precast elements. Note-2: 70% payment shall be
made when PSC elements reach to site and
balance 30% payment shall be made after
erection & placement in position . Note-3: Incase
of change of size of precast RCC element,
payment shall be adjusted on volumetric pro-rata
basis. b) Column Cap 300mm X 300mm X
150mm as per Approved Type Plan
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
drmwbsl192026t1.pdf
ATTACHMENT
GCC-2022-uptoACS10.pdf
ATTACHMENT
GCCACS11.pdf
ATTACHMENT
AnnexureVIB.pdf
ATTACHMENT
AnnexureVIAFormatofEMDandPBG.pdf Annexure VIA Format of EMD and PBG
ATTACHMENT
BeneficiaryName.pdf
ATTACHMENT
PCEcircular.pdf
ATTACHMENT
AnnexureVIAFormatofEMDandPBG.pdf
ATTACHMENT
Download all tender documents and submit your bid