| 1 | L1₹5.1 CrAccepted-AOC | ₹5.1 Cr | L1 | Accepted-AOC L1 accepted |
| 2 | L2₹5.2 Cr+₹9.4 L (1.84%)Rejected-AOC NA | NA | NA | 121004 | ₹5.2 Cr+₹9.4 L (1.84%) | L2 | Rejected-AOC L2 rejected due refund of emd |
Tender Value
Refer Docs
EMD Value
₹8.9 L
Closing Date
23 Nov 2020, 5:00 pmClosed
Executive Engineer
Provincial Division No. II, PWD B and R Br., Sirsa
Periodical Renewal by way 30mm thick BC and 5 years paid maintenance cost on DHS road to Sikanderpur-Rasulpur-Darbi-Sangar Sarista NH-10 Suchan-Kusumbi road in Km. 0.00 to 19.05 in Sirsa Distt.
2020_HRY_150176_1
Periodical Renewal by way 30mm thick BC and 5 year
Open Tender
Civil Works
Item Wise
180 days
Sirsa
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
₹8.9 L
Yes
18 May 2021
9 Nov 2020
24 Nov 2020
9 Nov 2020
23 Nov 2020
9 Nov 2020
Amount
Providing and laying tack coat with bitumen VG-10 grade pressure distributor at the rate of 0.30 kg. per sqm. On the prepared bituminous surface cleaned with mechanical broom including cost of bitumen as per clause No.503 as per MoRT&H specification (5th edition) 2013. Instrution issued from time to time by MORT&H regarding bitumen VG-10 will be followed strictly. Package-I =102065.00 Package-II= 72600.00 Total:- 174665.00 Sqm
Providing & Laying 30 mm thick compacted Bituminous Concrete (BC) in one layer with 100-120 TPH batch type hot mix plant and with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with appropriate vibratory rollers to achieve the desired compaction as per clause No. 507 of MoRT&H specification (5th Revision) 2013 for road and bridge works (5th Revision)2013 using minimum 5.4% bitumen grade VG-30 and processed waste plastic @ 7% of bitumen content as per IRC SP -98 -2013 as binder content by weight of total mix, complete in all respects including cost of bitumen instruction issued from time to time by MoRT&H regarding machinery & bitumen will be followed strictly. The use of self propelled mechanical paver fitted with electronic sensor device conforming to MoRT&H specification in mandatory. If bitumen required more than 5.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. Note :-1. Before carrying out bituminous work, coating & Stripping of bitumen aggregate mix is to be performed in accordance with IS-6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti-stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-Charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor. Instruction issued from time to time regarding bitumen from MORD will be followed strictly. Note:- Where there is only BC on existing black top, cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal /or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No.3004.3.3 and 3004.2 of MoRT&H specification . Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work. and nothing extra shall be payable. Package-I= 3061.95 Package-II= 2178.00 Total:- 5239.95 Cum
Providing & Marking center line / side line 2.5mm thick (minimum) with hot applied thermo-plastic road marking paint 10 cms wide/ 15cm wide complete in all respect such as furnishing all labour, materials, tolls equipments including all incidental costs necessary for carrying out in work at site confirming to the technical specification as clause No. 803 of MORT&H specification for road and bridge works (5th revision) of 2013/ Latest edition. Each container of the thermoplastic material shall have the name trademark or other means of identification of manufacturer, batch number, date of manufacture color maximum application temperature and maximum heating temperature. The thermoplastic paint material shall be of Asian Paint-Apcomark/Berger-Sigmarc/Prismo. The glass beads shall be of Potters/Sovitec/Fleolite. The thermoplastic material shall be sampled and tested in accordance with appropriate ASTM/BS method. The contractor shall furnish to the Engineer-in-Charge a copy of certified test reports from the manufacturer of the thermoplastic material meet all requirement of the specifications. The reflector zing glass beads shall meet the requirement of clause 803.4.2 and test methods mentioned in clause 803.4.2.4 shall be meticulously followed. The minimum thickness specified is exclusive of surface of glass beads the method of thickness measurement shall be in accordance with appendix B and C of BS:3262 (part-3). Note: - Before start of work the contractor shall give brand, batch number, manufacturing date of the material to be used along with a photocopy of bill duly signed by the contractor and get approved the same from Engineer-In-Charge before use. Package - I= 4265.12 Package-II= 3220.60 Total:- 7485.72 Sqm
Preparation and formation of berms and slopes as per X-sections including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift, but including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. As per X-section attached at DNIT at Section -9. This item also includes E/W if required in sub grade for Widening and Shoulder. Earth used for sub grade, shoulder and berms should have minimum CBR of 8%. Note:-No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer. Package -I= 17.48 Km. Package-II= 13.20 Km. Total:- 30.68 Km.
Pavement Marker (Cat Eyes) Moulded shank raised pavement markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing internal reflection of the light entering the lens face and shall support a load of 16000 KG tested in accordance to ASTM D 4280 Type H and complying to specifications of Category A of MORTH Circular No. W/NH/33023/10-97-DO III dt. 11.06.1997. The height width and length shall not be exceed 50mm, 100mm and 100 mm and with minimum reflective area of 13 Sqcm. On each side and the slope to the base shall be 35+/- degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19+/-2 mm and height not less than 30+/- mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the engineer (of reputed make such as Avery Dennison/3M/etc.) (NS) Package -I= 100 Nos. Package- II=100 Nos. Total:- 200 Nos.
Routine Maintenance Routine Maintenance Cost after completion of Construction for Ist Year. Package-I @ Rs.6825.34/- Per Km.
Package-II @ Rs.6673.94/- Per Km.
Routine Maintenance Cost after completion of Construction for IInd Year. Package-I @ Rs.13650.68/- Per Km.
Package-II @ Rs.13347.80/- Per Km.
Routine Maintenance Cost after completion of Construction for IIIrd Year. Package-I @ Rs.20476.03/- Per Km.
Package-II @ Rs.20021.74/- Per Km.
Routine Maintenance Cost after completion of Construction for IVth Year. Package-I @ Rs.27301.37/- Per Km.
Package-II @ Rs.26695.68/- Per Km.
Routine Maintenance Cost after completion of Construction for Vth Year. Package-I @ Rs.27301.37/- Per Km.
Package-II @ Rs.26695.68/- Per Km. Note :- The bidder is not required to quote his rate for routine maintenance as indicated in the bill of quantities are to be considered for financial evaluation and determining L-1 contractor irrespective of rates quoted by the contractor. If the rates quoted by the contractor differ from fixed base rates, then it will not be considered and rates as fixed in the DNIT will be considered. However, the total amount of L-1 will not be increased from the total amount quoted by the contractor and rebate to that extent shall have to be given by the contractor. Further the payment for routine maintenance to the contractor shall be regulated based on his performance of maintenance activities as per chapter eleven of rural road in manual (IRC-SP-20-202).
M/s Ramesh Chander Contractor Co. P. Ltd.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .