| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.9 L+₹11,234.42 (3.00%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹3.9 L+₹18,724.02 (5.00%)Rejected-Finance VILL P O AMJAI BARDHAMAN BARDHAMAN 713203 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713203 | L3 | Rejected-Finance L3 |
Tender Value
₹4.4 L
EMD Value
₹5,600
Closing Date
28 Jun 2024, 11:00 amClosed
AREA ENGINEER EnM, JHANJRA AREA
OFFICE OF THE GENERAL MANAGER, JHANJRA AREA, PO-LAUDOHA, BO, DIST. - PASCHIM BARDHAMAN, PIN-713385
Installation of winch along with 240mtr track line fitting from 0 Dip R-VI seam to 0 dip R-V seam for transportation of material of CM-1 section at UG of MIC,JPC
2024_ECL_310648_1
ECL/GM/JNR/EnM/A2/24-25/38 dated 12.06.2024
Open Tender
Miscellaneous Works
Item Rate
15 days
JHANJRA UNDERGROUND
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,600
12 Sept 2024
17 Jun 2024
29 Jun 2024
17 Jun 2024
28 Jun 2024
18 Jun 2024
17 Jun 2024 - 24 Jun 2024
Amount
PART A Installation of 22KW/550v winch at 0 Dip after dismantling it from 480 interconnection in between main incline and belt incline.
Dismantling of one no 22kW/550V winch with brake assembly, gear box, 22kW/550V motor, base plate, tensioning arrangement, fencing etc from 480 interconnection in between main Incline and belt indine after necessary cleaning of the site
Loading, transportation and unloading of 22kW/550V winch with brake assembly, gear box, 22kW/550V motor, base plate, tensioning arrangement, fencing etc from 480 interconnection in between main incline to surface with the help of MUV for necessary fabrication and adjustment Job
Cleaning of haulgae drum, brake assembly, base frame etc at surface and necessary welding and gas cutting for fabrication of the base farme and haulage drum for proper fitting at site
Cleaning of site,leveling, transportation of drill- panel,drill cable drill machine to the site, trench cuting and fixing of base frame & U-girder by floor boltin at 0 dip in RVI seam
Loading, transportation and unloading of 22kW/550V winch with brake assembly, gear box, 22kW/550V motor, base plate, tensioning arrangement, fencing etc from surface to O Dip for installation and 550V starter, 550V breaker, PVCDWA cable of approx 30 mtr from 480 interconnection in between main incline to 0 Dip and fitting of the haulage
Transportation of 22mm haulage rope from surface to O Dip after un-reeling from drum
Fitting of haulage rope to the drum after necessary fabrication job of diversion pulley and trial run
Supply of DA Cylinder
Supply of oxygen
PART B Installation of 30 lb track rail from 0Dip R-VI to 0Dip of R-V at UG of MIC JPC.
Total no of 6 mtr . 30lb of rails requried for 240m of track length To loading, transportation and unloading at 950 Incline 80 pieces of 30 lb. track rail, 80 No's of fishplates (240m of track line) with MUV.
To loading transportation and unloading at 950 inicine 240 No's of 2" x 4" sleeper with help of MUV. No of sleeper required for 240 m trackline
To lay 240m = 80 pairs of track rails and wooden sleepers and fitting of trackline Including maintaing of grade
Supply of MS NUT BOLT(3/4 X4")
Supply of FISH PLATE
Supply of DOG NAIL
Supply of DA
Supply of oxygen
Total impact of GST for the purpose of CTC
N.K. ENTERPRISE
F.R. ENTERPRISE
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .