Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10,092.01Accepted-Finance | 1 | Accepted-Finance qualified | |
| 2 | 2₹10,118.40+₹26.39 (0.26%)Accepted-Finance | 2 | Accepted-Finance qualified | |
| 3 | 3₹10,214+₹121.99 (1.21%)Accepted-Finance | 3 | Accepted-Finance qualified | |
| 4 | 4₹10,265.76+₹173.75 (1.72%)Accepted-Finance | 4 | Accepted-Finance qualified | |
| 5 | 5₹48,845.70+₹38,753.69 (384.0%)Accepted-Finance | 5 | Accepted-Finance qualified |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
25 Mar 2021, 4:00 pmClosed
Executive Engineer
Electric Division JPDCL Udhampur
Handling and fabrication of Store materials
2021_PDD_120631_1
ED/UDH/43 of 2020-21, dt. 15-03-2021
Open Tender
Electrical Works
Item Wise
10 days
District Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer Electric Division JPDCL
₹30,000
9 Jul 2021
17 Mar 2021
27 Mar 2021
17 Mar 2021
25 Mar 2021
17 Mar 2021
17 Mar 2021 - 20 Mar 2021
Unloading of PCC Poles 11 Mtr Long
Unloading of PCC Poles 9 Mtr Long
Unloading of PCC Poles 8 Mtr Long
Unloading of ST Poles 13 Mtr Long
Unloading of ST Poles 11Mtr Long
Unloading of ST Poles 9 Mtr Long
Unloading of ST Poles 8 Mtr Long
Loading of PCC Poles 11 Mtr Long
Loading of PCC Poles 9 Mtr Long
Loading of PCC Poles 8 Mtr Long
Loading of ST Poles 13 Mtr Long
Loading of ST Poles 11Mtr Long
Loading of ST Poles 9 Mtr Long
Loading of ST Poles 8 Mtr Long
Shifting/ Dragging of existing / New PCC/ ST Poles at a average distance upto 50 Mtr for stacking to easily accesible place for loading/Unoading Purpose and its stacking
Unloading of 25 KVA Transformer(New/ Old/ Damaged Transformer)
Unloading of 50/63 KVA Transformer(New/ Old/ Damaged Transformer)
Unloading of 100 KVA Transformer(New/ Old/ Damaged Transformer)
Unloading of 200/250 KVA Transformer(New/ Old/ Damaged Transformer)
Unloading of 300/400/500 KVA Transformer(New/ Old / Damaged Transformer)
Unloading of 630 KVA Transformer(New/ Old/ Damaged Transformer)
Loading of 25 KVA Transformer
Loading of 50/63 KVA Transformer
Loading of 100 KVA Transformer
Loading of 200/ 250 KVA Transformer
Loading of 300/400/500 KVA Transformer
Loading of 630 KVA Transformer
Dragging of existing / New / Damaged 25 KVA Tranformer at an average distance upto 50 Mtr and its stacking properly
Dragging of existing / New 50/ 63 KVA Tranformer at an average distance upto 50 Mtr and its stacking properly
Dragging of existing / New / Damaged 100 KVA Tranformer at an average distance upto 50 Mtr and its stacking properly
Dragging of existing /New /Damaged 200/ 250 KVA Tranformer at an average distance upto 50 Mtr and its stacking properly
Dragging of existing /New/Damaged 300/ 400/500 KVA Tranformer at an average distance upto 50 Mtr and its stacking properly
Dragging of existing / New/ Damaged 630 KVA Tranformer at an average distance upto 50 Mtr and its stacking properly
Unloading of Old/ New ACSR Conductor
Loading of Old/ New ACSR Conductor
Shifting of Old/ New ACSR Conductor from unloading site to stacking site at an average distance upto 50 Mtr and its stacking
Unloading of DPC CU/ AL Wire
Loading of DPC CU/ AL Wire
Stacking of Single/ Three phase meters
UnLoading of Channel/ Angle/ Flat Iron
Loading of Channel/Angle/Flat Iron
Carriage/ Shifting of Channel/ Angle/ Flat Iron at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
Unloading of PVC Cable single core 95/ 120/ 185 mm sq
Loading of PVC Cable single core 95/ 120/ 185 mm sq
Carriage/shifting of PVC Cable single core 95/ 120/ 185 mm sq at an average distance upto 50 Mtr
UnLoading of PVC Cable single core 300/ 400 mm sq
Loading of PVC Cable single core 300/ 400 mm sq
Carriage of PVC Cable single core 300/ 400 mm sq at an average distance upto 50 Mtr
UnLoading of PVC Cable single core 630 mm sq
Loading of PVC Cable single core 630 mm sq
Carriage of PVC Cable single core 630 mm sq at an average distance upto 50 Mtr
Unloading of AB/XLPE 25/ 35/ 50/ 70/ 95 mm sq single core Cable for HT/ LT Lines
Loading of AB/XLPE 25/35/50/70/95 mm sq single core Cable for HT/ LT Lines
Carriage of AB/XLPE 25 /35/ 50/ 70/ 95 mm sq single core Cable for HT/ LT Lines at an average distance upto 50 Mtr
Unloading of AB/XLPE 120/ 150/ 185/ 240 mmsq single core Cable for HT/ LT Lines
Loading of AB/ XLPE 120/ 150/ 185/ 240 mm sq single core Cable for HT/LT Lines
Carriage of AB/ XLPE 120/ 150/ 185/ 240 mm sq single core Cable for HT/ LTLines at an average distance upto 50 Mtr
Unloading of AB/XLPE 25/ 35/ 50 mm sq three core Cable for HT/ LT Lines
Loading of AB/XLPE 25/ 35/ 50 mm sq three core Cable for HT/ LT Lines
Carriage of AB/XLPE 25/ 35/ 50 mm sq three core Cable for HT/LT Lines at an average distance upto 50 Mtr
Unloading of AB/XLPE 70/ 95 mm sq three core Cable for HT/LT Lines
Loading of AB/XLPE 70/ 95mmsq three coreCable for HT/LT Lines
Carriage of AB/XLPE 70/ 95 mm sq three core Cable for HT Lines upto 50 mtrs
Unloading of AB/XLPE 120/ 150 mm sq three core Cable for HTLines
Loading of AB/XLPE 120/ 150 mm sq three core Cable for HT /LTLines
Carriage of AB/XLPE 120/ 150 mm sq three core Cable for HT/LT Lines at an average distance upto 50 Mtr
UnLoading of AB/ XLPE 185/ 240 mm sq three core Cable for HT/ LT Lines
Loading of AB/XLPE 185/ 240 mm sq three core Cable for HT Lines
Carriage of AB/XLPE 185/240 mm sq three core Cable for HT Lines at an average distance upto 50 Mtr
UnLoading of AB/ XLPE 300/ 400 mm sq three core Cable for HT Lines
Loading of AB/XLPE 300/ 400 mm sq three core Cable for HT/ LT Lines
Carriage of AB/XLPE 300/ 400 mm sq three core Cable for HT/ LT Lines at an average distance upto 50 Mtr
Fabrication of Channel Cross Arms of sorts/angle arms of sorts
Fabrication of clamps from MS flat (suitable for 8 mtr/9mtr, 11 mtr and 13 mtr poles)
Fabrication of Earthing Plates from MS plate
Fabrication of earthing spikes from MS tar steel of sorts as per REC Standards
Fabrication of foundation bolts from MS tor steel including threading as per REC Standards
Fabrication of Earthing pipe from GI pipe and welding of earthing plate as per REC Standards
Unloading/Loading of Straight jointing kit/Heat shrinkable Kit for AB/ XLPE cables of HT/ LT Lines
Unreeling, laying of ACSR Weasel/ Squirrel/ Rabbit conductor
Cutting of ACSR Weasel/ Squirrel/ Rabbit conductor, making bundles of conductor and stacking within 25 mtrs.
Unreeling, laying of PVC Cables
Cutting and making bundles of PVC Cables and stacking
Unreeling, laying of XLPE Cables
Cutting and making bundles of XLPE Cables and stacking
Unreeling, laying of PVC/ XLPE/ AB Cables
Cutting and making bundles of PVC/ XLPE/ AB Cables and stacking
Unloading of Link/ Knife/ HG/ DO/ LA Set
Loading of HG/ DO/ LA/ GO Set
Carriage/ Stacking of HG/ DO/ LA/ GO Set at an average distance upto 50 Mtr
Unloading of CT/ PT Unit
Loading of CT/ PT Unit
Carriage/ Stacking of CT/ PT Unit at an average distance upto 50 Mtr
UnLoading of 11KV Disc Insulators / Pin Insulators
Loading of 11kv Disc Insulators/ Pin Insulators
Carriage/ Stacking of 11kv Disc Insulators/ Pin Insulators
UnLoading of Shackle/ Busbar Insulators
Loading of Shackle/ Busbar Insulators
Carriage/ Stacking of Shackle/ Busbar Insulators
UnLoading of Al Busbar/ Al Strip
Loading of Al Busbar/ Al Strip
Carriage/Stacking of Al Busbar/ Al Strip
UnLoading of GI wire / Guy wire
Loading of GI wire / Guy wire
Carriage/ Stacking of GI wire / Guy wire
UnLoading of HV/ LV Bush Insulators
Loading of HV/ LV Bush Insulators
Carriage/Stacking of HV/ LV Bush Insulators
Un loading of HV/ LV Bushrods
Loading of HV/ LV Bushrods
Carriage/Stacking of HV/LV Bushrods
Unloading of Earthing rods etc
Loading of Earthing rods etc
Un loading of LT Switch 100A/ 200A
Loading of LT Switch 100A/ 200A
Carriage/Stacking of LT Switch 100A/200A
Carriage/ Stacking of Earthing rods etc
Fabrication of Guy Rod ,TB,AP
Fabrication of V-cross
RAGHAV SARIN
M/S HARSH VARDHAN CHAND
R K ELECTRICALS CONSTRUCTION AND SUPPLIERS
M/S RATHER CONSTRUCTIONS AND TRADERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .