| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 CrAdmitted-Finance | ₹4.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.4 CrAdmitted-Finance | ₹6.4 Cr | L2 | Admitted-Finance |
| 3 | L3₹7.1 CrAdmitted-Finance | ₹7.1 Cr | L3 | Admitted-Finance |
| 4 | L4₹7.0 CrAdmitted-Finance | ₹7.0 Cr | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical TECHNICALLY NOT ACCEPTABLE |
| Sl No | Description | Qty | Unit | ENERINFRA PRIVATE LIMITED L1 | Vichitra Constructions Pvt Ltd L4 | Advance Infrastrurctures Pvt Ltd L3 | Bluegrass Technologies Private Limited L2 |
|---|---|---|---|---|---|---|---|
| 1.00METALLIC MATERIALS AND CORROSION | |||||||
| 2.00Magnetic Cleaning and Electronic Geometry Pigging | |||||||
| 3.00 | Mobilisation/ Demobilisation of pigging tools, tackles, consumables, accessories and personnel by Contractor at work site including but not limited to magnet pigs, electronic geometry pigs and pig tracking device, temporary launcher and receiver as per Specification and other provision of the bid document including supply of material, equipment, manpower, etc. as required for geometry inspection and magnet cleaning in accordance with the EIL Specification B411-000-06-41-EGP-0010:
A) Mobilisation
B) Demobilisation
NOTE: Lumpsum charge is applicable for Mobilization and Demobilization charge only, and not for the entire Magnetic Cleaning and EGP charge. | 1 | Lumpsum | 50,000 ₹50,000 | 1,00,000 ₹1 L | 1,00,000 ₹1 L | 5,00,000 ₹5 L |
| 4.00 | Magnetic Cleaning:
Running of adequate no. of Magnet Pigs for pipeline including pig tracking for each segment, preparation of site report as per Specification and provisions of the bid document. | 770 | m | 100 ₹77,000 | 450 ₹3.5 L | 400 ₹3.1 L | 450 ₹3.5 L |
| 5.00 | Electronic Geometry Pigging:
Running of adequate no. of Electronic Geometry Pig (Caliper) including pig tracking for each segment, preparation of site report on pipeline, data analysis at Contractors facility as per Specification and provisions of the bid document. | 770 | m | 100 ₹77,000 | 600 ₹4.6 L | 1,500 ₹11.6 L | 450 ₹3.5 L |
| 6.00 | Defect Verification:
Defect verification at a max. of 3 locations for each segment inspected including supply of all tools, tackles, instruments, personnel and their transportation, all earth work, repair of pipeline coating wherever exposed, backfilling, work complete in all respect as per direction of engineer-in-charge.
NOTE: Unit EACH signifies each segment of the pipeline. | 1 | each | 10 ₹10 | 25,000 ₹25,000 | 50,000 ₹50,000 | 50 ₹50 |
| 7.00 | Final Report:
Preparation of final work report as per agreed format and submission to Client / Client's Consultant in total of 4 copies. | 1 | Lumpsum | 10 ₹10 | 75,000 ₹75,000 | 50,000 ₹50,000 | 3,00,000 ₹3 L |
| 8.00CATHODIC PROTECTION | |||||||
| 9.00CP System for HDD portions of the pipeline: | |||||||
| 10.00 | Survey, design, engineering, supply, installation, testing and commissioning of cathodic protection system to protect the external surface of the each HDD section of pipeline as per the enclosed specification vide document no.: B411-000-06-45-CSW-9562, R0. All work shall be carried out conforming to the scope of work, design basis, data sheets, specifications, standards, drawings, etc as per the provisions of GCC, SCC including specification no. 6-45-0027 , 6-45-0029 and all materials, equipment, consumables, start-up/ commissioning spares etc. which include transportation, storage of materials at site, manpower, in line with direction of Engineer-in -charge. | 1 | Lumpsum | 1,00,000 ₹1 L | 9,00,000 ₹9 L | 25,00,000 ₹25 L | 10,50,000 ₹10.5 L |
Tender Value
Refer Docs
EMD Value
₹15 L
Closing Date
13 Oct 2025, 2:00 pmClosed
DGM
AS PER BID DOCUMENT
BALANCE HDD CROSSINGS WORKS FOR KCPL PROJECT OF GAIL
2025_GAIL_249368_1
MKK/B411-000-MK-T-9562/15
Open Tender
Miscellaneous Works
60 days
AS PER BID DOCUMENT
AS PER BID DOCUMENT
4 documents required · 4 mandatory
₹0
₹15 L
Yes
REFER BID DOCUMENT
8 Dec 2025
23 Sept 2025
14 Oct 2025
23 Sept 2025
13 Oct 2025
26 Sept 2025
26 Sept 2025
Amount
METALLIC MATERIALS AND CORROSION
Magnetic Cleaning and Electronic Geometry Pigging
Mobilisation/ Demobilisation of pigging tools, tackles, consumables, accessories and personnel by Contractor at work site including but not limited to magnet pigs, electronic geometry pigs and pig tracking device, temporary launcher and receiver as per Specification and other provision of the bid document including supply of material, equipment, manpower, etc. as required for geometry inspection and magnet cleaning in accordance with the EIL Specification B411-000-06-41-EGP-0010: A) Mobilisation B) Demobilisation NOTE: Lumpsum charge is applicable for Mobilization and Demobilization charge only, and not for the entire Magnetic Cleaning and EGP charge.
Magnetic Cleaning: Running of adequate no. of Magnet Pigs for pipeline including pig tracking for each segment, preparation of site report as per Specification and provisions of the bid document.
Electronic Geometry Pigging: Running of adequate no. of Electronic Geometry Pig (Caliper) including pig tracking for each segment, preparation of site report on pipeline, data analysis at Contractors facility as per Specification and provisions of the bid document.
Defect Verification: Defect verification at a max. of 3 locations for each segment inspected including supply of all tools, tackles, instruments, personnel and their transportation, all earth work, repair of pipeline coating wherever exposed, backfilling, work complete in all respect as per direction of engineer-in-charge. NOTE: Unit EACH signifies each segment of the pipeline.
Final Report: Preparation of final work report as per agreed format and submission to Client / Client's Consultant in total of 4 copies.
CATHODIC PROTECTION
CP System for HDD portions of the pipeline:
Survey, design, engineering, supply, installation, testing and commissioning of cathodic protection system to protect the external surface of the each HDD section of pipeline as per the enclosed specification vide document no.: B411-000-06-45-CSW-9562, R0. All work shall be carried out conforming to the scope of work, design basis, data sheets, specifications, standards, drawings, etc as per the provisions of GCC, SCC including specification no. 6-45-0027 , 6-45-0029 and all materials, equipment, consumables, start-up/ commissioning spares etc. which include transportation, storage of materials at site, manpower, in line with direction of Engineer-in -charge.
INSTRUMENTATION
TELECOMMUNICATION WORKS
OPTICAL FIBRE CABLE INSTALLATION
Submission of as-built drawings and all documentation in accordance with the specifications.
Supply & installation of OFC distance markers (metal plates on pipeline markers) at all pipeline marker locations as per specifications and direction of CLIENT/CONSULTANT.
Supply of Permanently lubricated HDPE conduit for following sizes in required length of pressure rating 6 kgf/cm2 to be laid in pipeline trench or in separate trench directly or inside CS conduit including FAT, storage, transportation to site, loading, unloading etc. all complete
Duct with nominal diameter 40 mm or less
Laying, Testing and commissioning of the following sizes of HDPE duct/pipe of pressure rating 6 kgf/cm2, including supply of clamps, small iron structures, spacers, and duct accessories like push-fit couplers, bends and elbows, end plugs, simple plugs, sonic heads, etc, and including small civil works, cleaning with compressed air, calibrating, testing for air tightness, sealing of ends, including all labour and materials, as per directions of the Engineer-in-Charge.
Duct with nominal diameter 40 mm or less
Supply and Installation of Jointing pit/ blowing pit, sand, OFC joint identification markers, electronic markers etc. including jointing of OFC (with OFC laid by other contractor at both ends of HDD) in jointing pits, back filling, pulling wire for OFC/Duct Pulling (rugged and durable) etc. all complete
PIPELINES
INSTALLATION OF PIPELINE BY TRENCHLESS TECHNIQUE (USING HORIZONTAL DIRECTIONAL DRILLING)
Complete work for all type of crossings (RIVER/CANAL/ DRAIN/ NALA/ ROAD/ RAILWAY/ UTILITY) (between the limits as indicated in the drawing/ Scope of work) in all types of soil/ strata (including Normal Strata/ Hard Strata/ Hard Rock, as defined subsequently) including all additional drilled lengths necessitated by Contractor's design and based on site conditions, carrying out geo-technical investigation, carrying out topographical and hydrological survey and collection of data to establish the bed of the water body (for River/ Unlined waterbody); calculation of scour depth of water body crossings (for River/ Unlined Waterbody), including construction design calculation and engineering of the crossing for all types of crossings, "Receiving and taking-over", handling, loading, transportation and unloading of externally corrosion coated/ bare line pipes (as applicable) from designated place(s) of issue/ dump site(s) to Contractor's own stock-yard(s)/ work site; mobilization and de- mobilization at site(s), supply of all materials as per "Scope of Supply" all consumables, equipment, manpower, other resources, temporary acquisition of additional land as required for string preparations/ all other works, and execution of, but not limited to, the following works in accordance with specifications, drawings; preparation of all necessary construction drawings for Owner's approval, Preparation of detailed construction method statement, calculations and installation procedures, Strings preparation including welding, NDT of welds and re-beveled areas, radiography, weld repair and re-test, pre-hydro testing of completed string, corrosion coating of field joints with HDD sleeves, inspection of corrosion coating and repair of defects, installation of pipeline string by Horizontal directional drilling, Supply & Installation of 168.3mm size, 6.4 mm thk., API 5L Gr. B/ IS 3589 Fe 410 CS conduit for OFC (including 500µm of epoxy coating on CS Conduit as required) below the lowest level of the crossing including cover by separate horizontal directional drilling to the correct profile as per approved drawings and specification, Post-installation hydrotest including leaks and repair of defects and retesting, etc. for defects attributed to Contractor's faulty work, safe disposal of corrosion Inhibited water and bentonite, Supply, fabrication and construction of protective fencing as required; supply, fabrication and erection of pipeline markers; Restoration and clean-up etc., Preparation of as-built drawings and other records etc. All other works not specifically listed herein, but required as per drawings, scope of work, specifications, standards and provision of contract document, calculations, and instruction of Engineer-in- Charge, leading to successful completion of works. Notes: 1. Length of HDD shall be measured as actual curvilinear length between tie-ins at entry and exit. 2. Payment shall be made on pro rata basis for any Increase/ decrease in HDD length.
Scope of Work Installation of Pipeline (Line Pipe Free issue from Owner) Pipe Material Grade API 5L Gr. X-70 PSL 2 Pipe OD 610 mm Type of Crossing Road/ Highway Type of Soil/Strata Hard Strata (Soft Rock/ Murrum / Weathered Rock etc.) Crossing Name NH-544 Toll Plaza Chainage of Crossing 106.287 km Pipe Wall Thickness 12.7 mm
Scope of Work Installation of Pipeline (Line Pipe Free issue from Owner) Pipe Material Grade API 5L Gr. X-70 PSL 2 Pipe OD 610 mm Type of Crossing Road/ Highway Type of Soil/Strata Hard Strata (Soft Rock/ Murrum / Weathered Rock etc.) Crossing Name NH-544 Road crossing Chainage of Crossing 113.5 km Pipe Wall Thickness 12.7 mm
Scope of Work Installation of Pipeline (Line Pipe Free issue from Owner) Pipe Material Grade API 5L Gr. X-70 PSL 2 Pipe OD 610 mm Type of Crossing Road/ Highway Type of Soil/Strata Hard Rock Crossing Name NH-544 Road crossing Chainage of Crossing 140.49 km Pipe Wall Thickness 12.7 mm
REPAIR OF DEFECTS (ATTRIBUTABLE TO OWNER)
Repair of defects in Pipes/ Line Pipes Repair of defects in pipes/ line pipes (by Cutting and re-beveling including NDT of re-beveled area or by Jack out) of all thicknesses and external coating noted at the time of taking delivery by Contractor, including performing all works as per specifications, scope of work, standards and directions of Engineer-In-Charge, supply of all repair material and inspection.
Type of Repair by Jack out for dents in bevels (for dent between 1 mm and 3 mm in depth) Pipe OD 610 mm
Type of Repair by Cutting and re-beveling including NDT (for dent exceeding 3mm in depth) Pipe OD 610 mm
Repair of Holiday/ Cosmetic defects in Coating Supply of all coating repair materials as per the requirements of the relevant specifications, supply of all consumables, utilities, equipment, and all manpower required, pipe cleaning and surface preparation, repairing of coating defects (resulting in holiday in coating) and testing including all handling, transportation, etc. for line pipes, performing all works necessary for the completion of the works strictly in accordance with the relevant specifications and instructions of Engineer-in-Charge. This rate shall be applicable per sq. cm of the exposed steel area and/ or damaged coating area, as applicable.
Type of Repair Repair of Cosmetic defects Type of Coating 3LPE
Type of Repair Repair of Holiday Type of Coating 3LPE
LEAKS/ BURSTS (ATTRIBUTABLE TO OWNER)
Repair of Leaks/ Bursts in Pipeline All works for locating any major leak/burst (occurred during hydrostatic testing) or any minor leak by sectionalizing or any other methods which cannot be located by visual means, including necessary repairing/ replacing defective pipe length, including cutting and removing out defective pipes, transportation, pretesting of replacement pipe and welding into mainline, NDT of welds and re-beveled area, repair and re-testing of defective welds, coating/ painting of welded joints, clean-up, retesting the pipeline/ pipe segment including providing all necessary equipment, labour, materials, consumables and inputs other than Owner supplied materials and performing all works as per drawings, scope of work, specifications, standards enclosed with the Contract and directions of Engineer-in-Charge. Note: 1. This rate is applicable for manufacturing defects in Company/ Owner supplied material only.
Type of Leak Major Leak (detected by visual method) Pipe OD 610 mm
Type of Leak Minor Leak (detected by sectionalizing) Pipe OD 610 mm
IDLE TIME PRESERVATION WORKS
Idle time preservation of Pipeline and Associated facilities: Preservation of complete pipeline and associated facilities and its maintenance by filling and pressurizing with nitrogen including supply and maintenance of nitrogen or by filling and pressurizing with corrosion inhibited water including supply and maintenance of water with regular dosing of inhibitor to maintain the effectiveness of the inhibitor water (along with disposal of corrosion inhibited water at a proper/ suitable location, after due preservation works) and supply of all consumables, all equipment, man- power, etc., complete as per the requirements of specifications, scope of work, standards, other provisions of Contract document and instructions of Engineer-in- Charge as per following details:
Type of Preservation By Filling Nitrogen Pressure (Bar(g)) 2.0 Pipe OD 610 mm Period Up to 3 Month
PRE-COMMISSIONING AND COMMISSIONING ASSISTANCE FOR PIPELINES
Carrying out pre-commissioning activities and pre-commissioning checks to the specified acceptance criteria, making the entire pipeline system including stations ready for commissioning, providing assistance during the complete duration of commissioning operations, supply of all equipment, man-power, consumables, including all type of pigs and required quantity of nitrogen (if & as required), materials for all temporary works and performing all associated works, complete as per the relevant specifications, scope of work, standards, other provisions of Contract document and instructions of Engineer-in-Charge
Pre-Commissioning Works as per details: Type of Activity Dewatering Pipe OD 610 mm
Pre-Commissioning Works as per details: Type of Activity Drying Pipe OD 610 mm
Pre-Commissioning Works as per details: Type of Activity Swabbing Pipe OD 610 mm
Commissioning Assistance : All works for Commissioning assistance as per details below: Pipe OD 610 mm
TRANSPORTATION OF SURPLUS ITEMS TO OWNER'S DESIGNATED STORAGE YARD/ DUMPSITE (AFTER COMPLETION OF INSTALLATION WORKS)
Loading, transportation including all works necessary for transportation, loading, unloading, handling, stacking etc. of all surplus piping/ pipeline material from Contractor’s storage yard/ worksite/ temporary storage facility including arrangement of all handling equipment such as trailers, trucks, cranes etc, carrying out inspection of surplus material & recording of pipe & coating defects & any other defects in the surplus material at the time of handing over in the presence of Company's representative at Owner designated storage yard/ dump site & as per the Scope of work, other provisions of the Contract and instructions of Engineer-in-Charge.
Approximate Distance of transport 100 km
GST IN PERCENTAGE ON NET TOTAL AMOUNT
Description of Work / Item(s)
Amount
METALLIC MATERIALS AND CORROSION
Magnetic Cleaning and Electronic Geometry Pigging
Mobilisation/ Demobilisation of pigging tools, tackles, consumables, accessories and personnel by Contractor at work site including but not limited to magnet pigs, electronic geometry pigs and pig tracking device, temporary launcher and receiver as per Specification and other provision of the bid document including supply of material, equipment, manpower, etc. as required for geometry inspection and magnet cleaning in accordance with the EIL Specification B411-000-06-41-EGP-0010: A) Mobilisation B) Demobilisation NOTE: Lumpsum charge is applicable for Mobilization and Demobilization charge only, and not for the entire Magnetic Cleaning and EGP charge.
Magnetic Cleaning: Running of adequate no. of Magnet Pigs for pipeline including pig tracking for each segment, preparation of site report as per Specification and provisions of the bid document.
Electronic Geometry Pigging: Running of adequate no. of Electronic Geometry Pig (Caliper) including pig tracking for each segment, preparation of site report on pipeline, data analysis at Contractors facility as per Specification and provisions of the bid document.
Defect Verification: Defect verification at a max. of 3 locations for each segment inspected including supply of all tools, tackles, instruments, personnel and their transportation, all earth work, repair of pipeline coating wherever exposed, backfilling, work complete in all respect as per direction of engineer-in-charge. NOTE: Unit EACH signifies each segment of the pipeline.
Final Report: Preparation of final work report as per agreed format and submission to Client / Client's Consultant in total of 4 copies.
CATHODIC PROTECTION
CP System for HDD portions of the pipeline:
Survey, design, engineering, supply, installation, testing and commissioning of cathodic protection system to protect the external surface of the each HDD section of pipeline as per the enclosed specification vide document no.: B411-000-06-45-CSW-9562, R0. All work shall be carried out conforming to the scope of work, design basis, data sheets, specifications, standards, drawings, etc as per the provisions of GCC, SCC including specification no. 6-45-0027 , 6-45-0029 and all materials, equipment, consumables, start-up/ commissioning spares etc. which include transportation, storage of materials at site, manpower, in line with direction of Engineer-in -charge.
INSTRUMENTATION
TELECOMMUNICATION WORKS
OPTICAL FIBRE CABLE INSTALLATION
Submission of OFC alignment sheets, as-built drawings and all documentation in accordance with the specifications.
Supply & installation of OFC distance markers (metal plates on pipeline markers) at all pipeline marker locations as per specifications and direction of CLIENT/CONSULTANT.
Supply of Permanently lubricated HDPE conduit for following sizes in required length of pressure rating 6 kgf/cm2 to be laid in pipeline trench or in separate trench directly or inside CS conduit including FAT, storage, transportation to site, loading, unloading etc. all complete
Duct with nominal diameter 40 mm or less
Laying, Testing and commissioning of the following sizes of HDPE duct/pipe of pressure rating 6 kgf/cm2, including supply of clamps, small iron structures, spacers, and duct accessories like push-fit couplers, bends and elbows, end plugs, simple plugs, sonic heads, etc, and including small civil works, cleaning with compressed air, calibrating, testing for air tightness, sealing of ends, including all labour and materials, as per directions of the Engineer-in-Charge.
Duct with nominal diameter 40 mm or less
Supply and Installation of Jointing pit/ blowing pit, sand, OFC joint identification markers, electronic markers etc. including jointing of OFC (with OFC laid by other contractor at both ends of HDD) in jointing pits, back filling, pulling wire for OFC/Duct Pulling (rugged and durable) etc. all complete
PIPELINES
INSTALLATION OF PIPELINE BY TRENCHLESS TECHNIQUE (USING HORIZONTAL DIRECTIONAL DRILLING)
Complete work for all type of crossings (RIVER/CANAL/ DRAIN/ NALA/ ROAD/ RAILWAY/ UTILITY) (between the limits as indicated in the drawing/ Scope of work) in all types of soil/ strata (including Normal Strata/ Hard Strata/ Hard Rock, as defined subsequently) including all additional drilled lengths necessitated by Contractor's design and based on site conditions, carrying out geo-technical investigation, carrying out topographical and hydrological survey and collection of data to establish the bed of the water body (for River/ Unlined waterbody); calculation of scour depth of water body crossings (for River/ Unlined Waterbody), including construction design calculation and engineering of the crossing for all types of crossings, "Receiving and taking-over", handling, loading, transportation and unloading of externally corrosion coated/ bare line pipes (as applicable) from designated place(s) of issue/ dump site(s) to Contractor's own stock-yard(s)/ work site; mobilization and de- mobilization at site(s), supply of all materials as per "Scope of Supply" all consumables, equipment, manpower, other resources, temporary acquisition of additional land as required for string preparations/ all other works, and execution of, but not limited to, the following works in accordance with specifications, drawings; preparation of all necessary construction drawings for Owner's approval, Preparation of detailed construction method statement, calculations and installation procedures, Strings preparation including welding, NDT of welds and re-beveled areas, radiography, weld repair and re-test, pre-hydro testing of completed string, corrosion coating of field joints with HDD sleeves, inspection of corrosion coating and repair of defects, installation of pipeline string by Horizontal directional drilling, Supply & Installation of 168.3mm size, 6.4 mm thk., API 5L Gr. B/ IS 3589 Fe 410 CS conduit for OFC (including 500µm of epoxy coating on CS Conduit as required) below the lowest level of the crossing including cover by separate horizontal directional drilling to the correct profile as per approved drawings and specification, Post-installation hydrotest including leaks and repair of defects and retesting, etc. for defects attributed to Contractor's faulty work, safe disposal of corrosion Inhibited water and bentonite, Supply, fabrication and construction of protective fencing as required; supply, fabrication and erection of pipeline markers; Restoration and clean-up etc., Preparation of as-built drawings and other records etc. All other works not specifically listed herein, but required as per drawings, scope of work, specifications, standards and provision of contract document, calculations, and instruction of Engineer-in- Charge, leading to successful completion of works. Notes: 1. Length of HDD shall be measured as actual curvilinear length between tie-ins at entry and exit. 2. Payment shall be made on pro rata basis for any Increase/ decrease in HDD length.
Scope of Work Installation of Pipeline (Line Pipe Free issue from Owner) Pipe Material Grade API 5L Gr. X-70 PSL 2 Pipe OD 610 mm Type of Crossing Any Other Type of Soil/Strata Hard Rock Crossing Name Bridge culvert Chainage of Crossing 146.25 km Pipe Wall Thickness 12.7 mm
Scope of Work Installation of Pipeline (Line Pipe Free issue from Owner) Pipe Material Grade API 5L Gr. X-70 PSL 2 Pipe OD 610 mm Type of Crossing Any Other Type of Soil/Strata Hard Rock Crossing Name Toll Plaza Chainage of Crossing 139.7 km Pipe Wall Thickness 12.7 mm
REPAIR OF DEFECTS (ATTRIBUTABLE TO OWNER)
Repair of defects in Pipes/ Line Pipes Repair of defects in pipes/ line pipes (by Cutting and re-beveling including NDT of re-beveled area or by Jack out) of all thicknesses and external coating noted at the time of taking delivery by Contractor, including performing all works as per specifications, scope of work, standards and directions of Engineer-In-Charge, supply of all repair material and inspection.
Type of Repair by Jack out for dents in bevels (for dent between 1 mm and 3 mm in depth) Pipe OD 610 mm
Type of Repair by Cutting and re-beveling including NDT (for dent exceeding 3mm in depth) Pipe OD 610 mm
Repair of Holiday/ Cosmetic defects in Coating Supply of all coating repair materials as per the requirements of the relevant specifications, supply of all consumables, utilities, equipment, and all manpower required, pipe cleaning and surface preparation, repairing of coating defects (resulting in holiday in coating) and testing including all handling, transportation, etc. for line pipes, performing all works necessary for the completion of the works strictly in accordance with the relevant specifications and instructions of Engineer-in-Charge. This rate shall be applicable per sq. cm of the exposed steel area and/ or damaged coating area, as applicable.
Type of Repair Repair of Cosmetic defects Type of Coating 3LPE
Type of Repair Repair of Holiday Type of Coating 3LPE
LEAKS/ BURSTS (ATTRIBUTABLE TO OWNER)
Repair of Leaks/ Bursts in Pipeline All works for locating any major leak/burst (occurred during hydrostatic testing) or any minor leak by sectionalizing or any other methods which cannot be located by visual means, including necessary repairing/ replacing defective pipe length, including cutting and removing out defective pipes, transportation, pretesting of replacement pipe and welding into mainline, NDT of welds and re-beveled area, repair and re-testing of defective welds, coating/ painting of welded joints, clean-up, retesting the pipeline/ pipe segment including providing all necessary equipment, labour, materials, consumables and inputs other than Owner supplied materials and performing all works as per drawings, scope of work, specifications, standards enclosed with the Contract and directions of Engineer-in-Charge. Note: 1. This rate is applicable for manufacturing defects in Company/ Owner supplied material only.
Type of Leak Major Leak (detected by visual method) Pipe OD 610 mm
Type of Leak Minor Leak (detected by sectionalizing) Pipe OD 610 mm
IDLE TIME PRESERVATION WORKS
Idle time preservation of Pipeline and Associated facilities: Preservation of complete pipeline and associated facilities and its maintenance by filling and pressurizing with nitrogen including supply and maintenance of nitrogen or by filling and pressurizing with corrosion inhibited water including supply and maintenance of water with regular dosing of inhibitor to maintain the effectiveness of the inhibitor water (along with disposal of corrosion inhibited water at a proper/ suitable location, after due preservation works) and supply of all consumables, all equipment, man- power, etc., complete as per the requirements of specifications, scope of work, standards, other provisions of Contract document and instructions of Engineer-in- Charge as per following details:
Type of Preservation By Filling Nitrogen Pressure (Bar(g)) 2.0 Pipe OD 610 mm Period Up to 3 Month
PRE-COMMISSIONING AND COMMISSIONING ASSISTANCE FOR PIPELINES
Carrying out pre-commissioning activities and pre-commissioning checks to the specified acceptance criteria, making the entire pipeline system including stations ready for commissioning, providing assistance during the complete duration of commissioning operations, supply of all equipment, man-power, consumables, including all type of pigs and required quantity of nitrogen (if & as required), materials for all temporary works and performing all associated works, complete as per the relevant specifications, scope of work, standards, other provisions of Contract document and instructions of Engineer-in-Charge
Pre-Commissioning Works as per details: Type of Activity Dewatering Pipe OD 610 mm
Pre-Commissioning Works as per details: Type of Activity Drying Pipe OD 610 mm
Pre-Commissioning Works as per details: Type of Activity Swabbing Pipe OD 610 mm
Commissioning Assistance : All works for Commissioning assistance as per details below: Pipe OD 610 mm
TRANSPORTATION OF SURPLUS ITEMS TO OWNER'S DESIGNATED STORAGE YARD/ DUMPSITE (AFTER COMPLETION OF INSTALLATION WORKS)
Loading, transportation including all works necessary for transportation, loading, unloading, handling, stacking etc. of all surplus piping/ pipeline material from Contractor’s storage yard/ worksite/ temporary storage facility including arrangement of all handling equipment such as trailers, trucks, cranes etc, carrying out inspection of surplus material & recording of pipe & coating defects & any other defects in the surplus material at the time of handing over in the presence of Company's representative at Owner designated storage yard/ dump site & as per the Scope of work, other provisions of the Contract and instructions of Engineer-in-Charge.
Approximate Distance of transport 100 km
GST IN PERCENTAGE ON NET TOTAL AMOUNT
Bluegrass Technologies Private Limited (BID ID -910361)
Vichitra Constructions Pvt Ltd (BID ID -911625)
Advance Infrastrurctures Pvt Ltd (BID ID -911761)
Bluegrass Technologies Private Limited (BID ID -910361)
Advance Infrastrurctures Pvt Ltd (BID ID -911761)
Vichitra Constructions Pvt Ltd (BID ID -911625)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid