Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹10.7 L+₹8,860 (0.84%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹10.8 L+₹17,760 (1.68%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S EVERGREEN TRADERS L1 | M/S RATHORE ELECTRICALS L2 | chauhan enterprises L3 |
|---|---|---|---|---|---|---|
| 1.00Carriage of following materials from Elec. Store Center Unnao to work dump site along with loading unloading and propoer stocking. Distance 0-70 Km. | ||||||
| 1.01 | PCC/ST Pole of diff. size | 50 | Nos | 1,000 ₹50,000 Lowest | 1,050 ₹52,500 | 1,100 ₹55,000 |
| 1.02 | ACSR Weasel Conductor | 1,070 | Mtr | 5 ₹5,350 Lowest | 12 ₹12,840 | 6 ₹6,420 |
| 1.03 | ABC conductor Three Phase of size 3x50/3x95/3x120 sq mm | 5,940 | Mtr | 10 ₹59,400 | 12 ₹71,280 | 8 ₹47,520 Lowest |
| 1.04 | L.T. Cable 1x400/3.5X70/35 sq mm | 250 | Mtr | 10 ₹2,500 | 12 ₹3,000 | 8 ₹2,000 Lowest |
| 1.05 | Other loose line materials including GI/stay wire, Single and double Pole accessories,
complete stay & earthing, insulator, x-arm, jointing kit etc. | 21 | Job | 3,000 ₹63,000 | 2,500 ₹52,500 Lowest | 2,800 ₹58,800 |
| 2.00Carriage of following Transformer from Elec. Store Center Unnao to diff. work dump site along with loading unloading and propoer stocking. | ||||||
| 2.01 | T/F 25 KVA 11/0.4 KV | 19 | Nos | 3,000 ₹57,000 | 2,500 ₹47,500 Lowest | 3,200 ₹60,800 |
| 2.02 | T/F 100 KVA 11/0.4 KV | 1 | Nos | 4,000 ₹4,000 Lowest | 4,200 ₹4,200 | 4,200 ₹4,200 |
| 2.03 | T/F 250 KVA 11/0.4 KV | 1 | Nos | 6,500 ₹6,500 | 5,600 ₹5,600 Lowest | 6,000 ₹6,000 |
Tender Value
₹10.6 L
EMD Value
₹10,590
Closing Date
13 Sept 2025, 5:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Distribution Circle-Unnao
INCREASING CAPACITY OF 10/16 KVA TO 25 KVA DISTRIBUTION TRANSFORMER AND 100/250 KVA INSTALATION OF NEW TRANSFORMER , CONTROL PANNEL WATER LEVEL EARTHING IN THE AREA OF E.D.S.D.-I, AJGAIN UNDER THE E.D.D. V, HASANGANJ, UNNAO. UNDER BUSINESS PLAN YEAR
2025_MVVNL_1071702_1
96/E.D.C./Unnao/2025-26
Open Tender
Electrical Works
Fixed-rate
180 days
Unnao
as per tender document
2 documents required · 2 mandatory
₹3,540
A/C-No.3355002101008374,IFSCCode- PUNB0335500
₹10,590
18 Sept 2025
6 Sept 2025
15 Sept 2025
6 Sept 2025
13 Sept 2025
6 Sept 2025
Amount
Carriage of following materials from Elec. Store Center Unnao to work dump site along with loading unloading and propoer stocking. Distance 0-70 Km.
PCC/ST Pole of diff. size
ACSR Weasel Conductor
ABC conductor Three Phase of size 3x50/3x95/3x120 sq mm
L.T. Cable 1x400/3.5X70/35 sq mm
Other loose line materials including GI/stay wire, Single and double Pole accessories, complete stay & earthing, insulator, x-arm, jointing kit etc.
Carriage of following Transformer from Elec. Store Center Unnao to diff. work dump site along with loading unloading and propoer stocking.
T/F 25 KVA 11/0.4 KV
T/F 100 KVA 11/0.4 KV
T/F 250 KVA 11/0.4 KV
Dismantling of following Transformer from Plinth / Double Pole with Safe Carriage from work site to dump site along with loading unloading and propoer stocking.
T/F 10 KVA 11/0.4 KV
T/F 16 KVA 11/0.4 KV
Mounting of following Transformer on double pole including its cartage and dragging from dump site to pit site.
T/F 25 KVA 11/0.4 KV
T/F 100 KVA 11/0.4 KV
Placement of 11/0.433 KV Distribution Transformer from dump site to newly constructed T/F plinth and Installation cable termenation and commissioning of 250 KVA Transformer including drassing damaged cable, lugs ,Jumpering & connecting Earthing of body & neutral as per required. ( required mattrial as lugs, flat copper L plate, nuts & bolts etc for above job shall be provided by contractor)
Construction of T/F plinth, suitable for mounting of distribution transformer. Size of the plinth will be 1.5 x 1.5 x1.2 meter solid with brick work. 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth.
Fabrication and erection of Distribution Transformer fencing of frame size 3x2.4 Mtr. Including cost of M.S. Angle size 35x35x5 and M.S. Flat size 35x5, fixing of welded steel wire fabric on steel frames by welding of 10SWG wire fabric, including Painting of two coats of paint in iron based surfaces with ready mixed paint to give bus green shade including cleaning of oil & dust.
New Earthing for Distribution transformers/Control Pannel one neutral and one for body of transformer 40 ft.deep GI pipe of size 40 mm. making all arrangements for its recharging funnel with openable cover of steel chequered plate with hinges and making connections to transformer neutral/body by GI strip of size 35x5 mm after complete running welding and connecting with pipes by clamps/nut bolts and welding.
Providing & fixing of Holding clamps for PCC/ST pole with Nuts & Bolts.
Providing & fixing of Stay clamps/ LT Clamps for PCC/ST pole with Nuts & Bolts.
Erection of single pole including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site.
Erection of double pole including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site.
Fabrication/Modification of MS items/Nuts & Bolts as requirement of site condition.
Making T-off arrangement including fabrication & fitting of accessories.
Grouting of PCC/ST Pole as per RESPO Norms with grouting materials.
Earthing of pole as per RESPO Norms.
Digging of pits, fixing nuzzling and grouting of stay rods as per RESPO Norms with grouting materials.
Laying stringing and sagging of 11 HT Lines by ACSR weaseal conductor including all associated work with joint/jumpers and binding of insulator as required.
Control Pannel water level earthing with 20 ft. deep or upto water level providing GI 5" dia ("B"class) and earthing must be joint in T/F body, neutral as Fuse unit by G.I stripe of size 32x5 mm thick long attached with nut &bolts and G.I pipe cap (All the material will be arranged by the contractor at his own cost.)
Laying stringing and sagging of aerial bunched cable including all fittings on erected PCC/ST Pole of size 3x50/3x95/3x120 sq mm
Fixing of 3-Phase D.O. Fuse set on double pole with ms channel
Providing & Fixing of Dead end clamp on LT pole
Providing & Fixing of Suspesion clamp with I-Hook
Providing & fixing Al. Lugs of diff. size
Safe Carriage of following T/F from work dump site to Electricity store center Unnao with loading, unloading and proper stocking.
Recevied back old T/F 10 KVA 11/0.4 KV
Recevied back old T/F 16 KVA 11/0.4 KV
M/S RATHORE ELECTRICALS (BID ID -5531569)
chauhan enterprises (BID ID -5530858)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .