| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.4 LAccepted-AOC | ₹27.4 L | L1 | Accepted-AOC L1 ACCEPTED |
| 2 | L2₹27.5 L+₹4,675.46 (0.17%)Rejected-Finance | ₹27.5 L+₹4,675.46 (0.17%) | L2 | Rejected-Finance L2 |
| 3 | L3₹29.1 L+₹1.7 L (6.17%)Rejected-Finance | ₹29.1 L+₹1.7 L (6.17%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | SARAVANAN KG L2 | mohanraj and co L1 | KNK Constructions L3 |
|---|---|---|---|---|---|---|
| 1.00Name of the Work : Detailed estimate for the Upgradation of road from Periyakurumbapalayam PUE school to OHT (via) Periyakurumbapalayam colony KM 0/0 - KM 0/820 H/O Kalpavi, Ammapettai Panchayat Union of Erode District, under Mines And Minerals Saving fund 2025-26 | ||||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete. | 876 | Sqm | 5.95 ₹5,212.2 Lowest | 5.95 ₹5,212.2 Lowest | 8 ₹7,008 |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 13.5 | Cum | 131.25 ₹1,771.88 | 131 ₹1,768.5 | 120 ₹1,620 Lowest |
| 4.00 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms. | 138.15 | Cum | 687 ₹94,909.05 | 686.5 ₹94,839.98 | 650 ₹89,797.5 Lowest |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 469.97 | Cum | 2,349 ₹11,03,959.53 | 2,348 ₹11,03,489.56 Lowest | 2,500 ₹11,74,925 |
| 6.00 | Providing and laying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 3,133.13 | Sqm | 82.5 ₹2,58,483.23 | 81.1 ₹2,54,096.84 | 80 ₹2,50,650.4 Lowest |
| 7.00 | Providing and laying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 3,133.13 | Sqm | 19.5 ₹61,096.04 | 19 ₹59,529.47 Lowest | 20 ₹62,662.6 |
| 8.00 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. (Paver with using Plastic waste) | 3,133.13 | Sqm | 256 ₹8,02,081.28 Lowest | 257 ₹8,05,214.41 | 280 ₹8,77,276.4 |
| 9.00 | Towards to the name board charges | 1 | No | 1,500 ₹1,500 | 950 ₹950 Lowest | 4,500 ₹4,500 |
| 10.00 | Towards Photography charges | 1 | No | 500 ₹500 | 450 ₹450 Lowest | 500 ₹500 |
Tender Value
₹27.7 L
EMD Value
₹28,000
Closing Date
11 Aug 2025, 3:00 pmClosed
Special Officer, Kalpavi Panchayat
Special Officer, Kalpavi Panchayat, Ammapettai Block.
Upgradation of road from Periyakurumbapalayam PUE school to OHT (via) Periyakurumbapalayam colony KM 0/0 - KM 0/820 H/O Kalpavi, Ammapettai Panchayat Union of Erode District, under Mines And Minerals Saving fund 2025-26
2025_RDTN_586370_1
01/2025/Kalpavi Panchayat
Open Tender
Civil Works - Roads
Works
90 days
Special Officer, Kalpavi Panchayat
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹28,000
Yes
6 Sept 2025
28 Jul 2025
11 Aug 2025
28 Jul 2025
11 Aug 2025
28 Jul 2025
Amount
Name of the Work : Detailed estimate for the Upgradation of road from Periyakurumbapalayam PUE school to OHT (via) Periyakurumbapalayam colony KM 0/0 - KM 0/820 H/O Kalpavi, Ammapettai Panchayat Union of Erode District, under Mines And Minerals Saving fund 2025-26
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. (Paver with using Plastic waste)
Towards to the name board charges
Towards Photography charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SARAVANAN KG (BID ID -1419053)
KNK Constructions (BID ID -1419548)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_700425.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .