| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance NO 15A NETHAJI NAGAR 8TH STREET ENNORE HIGH ROAD CHENNAI 600057 | CHENNAI | CHENNAI | TAMIL NADU | 600057 | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 CrAdmitted-Finance 7 145 MALLIKUNDAM PO MECHARI VIA MALLIKUNDAM VIA METTUR TK SALEM DT | ₹1.6 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.7 CrAdmitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹2.7 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M s Kumaresan and co L2 | K DHINAKARAN L3 | JD ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00 | Collection of Field Maps and Revenue records: Towards the charges for collection of field maps, patta, chitta, land owners details, etc., pertaining to both sides of approved alignment as instructed by the Department Officers for survey numbers involved from the starting chainage to ending chainage of this project for the proposed alignment for formation of corridor. (Field work to collect details) | 31,570 | M2 | 0.1 ₹3,157 Lowest | 5 ₹1,57,850 | 0.15 ₹4,735.5 |
| 2.00 | Conversion of Individual FMB into Auto CAD File: Identification of respective lands that are corridored by the Transmission Line by Transect Walking System aiding with GPS devices along the center line of the corridor. Preparation of rough alignment sketch by denoting the Survey Numbers of the land that pass through. Based on the sketch, conversion of indivdual FMB Sketch with Ladder measurements that are corridored by the Transmission Line to be done within the Tolerance Limit in AutoCAD. Tolerance Limit shall be applied as per the Survey of India's Guidelines. | 31,570 | M2 | 0.1 ₹3,157 Lowest | 5 ₹1,57,850 | 0.15 ₹4,735.5 |
| 3.00 | Combining FMB Sketches and converting into KML File: As per prevailing practices/guidelines, width markings to be carried out on either side from mid-line for entire individual FMB Sketches that pass through the Transmission Line Corridor. Further, entire Individual FMB sketches to be combined for forming alignment Topo Drawing. Profiling of the combined FMB Sketches in the field by providing Control Points at every 2km interval using DGPS Instrument. With Reference to the Control Points, the entire Transmission Line Corridor to be compiled as KML File. | 31,570 | M2 | 0.1 ₹3,157 Lowest | 5 ₹1,57,850 | 0.15 ₹4,735.5 |
| 4.00 | Conducting Topographical Surveying: Towards the charges for conducting topographical survey along the Transmission Line to ascertain a corrider width by using Total station (Detailed field survey), If necessary drone can be used with necessary permission if any, including taking of all existing features in the field. The base area of all the towers to be surveyed, Total land area of all the Land owners to be surveyed with the reference of survey stones. Cost of leads, lifts, conveyance, survey tools & plants, hire charges, all labour charges, head loads etc., to be accompanied by the contractor itself. | 31,570 | M2 | 0.3 ₹9,471 Lowest | 5 ₹1,57,850 | 0.5 ₹15,785 |
| 5.00 | Sub-Division Work: Towards the charges for marking Transmission Line Corridor, Tower Base in the individual FMB sketches and combined FMB Sketches. Calculation of land areas of Tower base, Transmission Alignment along with Corridor Width and identification of land owners. Sub-division sketches to be formed based on the identified land areas. | 31,570 | M2 | 0.1 ₹3,157 Lowest | 5 ₹1,57,850 | 0.15 ₹4,735.5 |
| 6.00 | Colour Print of Individual FMB, Combined FMB Sketch, Patta, Sub-division FMB, Topo Map - 6 Sets | 31,570 | M2 | 0.25 ₹7,892.5 | 5 ₹1,57,850 | 0.2 ₹6,314 Lowest |
| 7.00 | Marking of Village Topo-map: Marking of corridor from the centre point of location to be marked in the village Topo-map by using AutoCAD software by using guidelines of the Survey of India. | 2 | Nos | 2,500 ₹5,000 | 5 ₹10 Lowest | 3,500 ₹7,000 |
| 8.00 | Preparation and submission of documents for fixing land value: Preparation and submitting of 8 sets of documents required for arriving land compensation for all survey numbers in Tower locations / Transmission Corridor, including obtaining sales value from Registeration department for fixing the market value of lands for survey numbers and assisting the revenue officials at the collectorate land section as per the guidelines of the revenue department and as per the instruction of engineer in charge. | 2 | Nos | 5,000 ₹10,000 | 5 ₹10 Lowest | 10,000 ₹20,000 |
| 9.00 | Clearing Light jungle for carrying out the Stub-setting & stringing work with all lead, lift including cost of T & P, labour etc. complete | 8,616 | M2 | 2 ₹17,232 | 1 ₹8,616 Lowest | 1 ₹8,616 Lowest |
| 10.00 | Conducting check survey, pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour,all lead, all lift and all head load etc complete. | 10 | Loc | 2,000 ₹20,000 Lowest | 4,000 ₹40,000 | 3,000 ₹30,000 |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
23 Feb 2026, 2:30 pmClosed
CE/TP-I/CNI
O/o the Chief Engineer/Transmission Projects -I / Chennai, 3rd Floor, 230 KV GIS Substation building A10, Guindy Industrial Estate, Guindy, Chennai -32
erection of 110 KV DC line on DC tower by making LILO of the existing Pallakapallyam - Sankari 110 KV feeder-I at the proposed Nathamedu 110 KV SS
2026_EB_659868_1
TP1-163/2025-26 OF CE/TP-I/CNI
Open Tender
Civil Works
Works
180 days
nathamedu
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.4 L
5 Mar 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Collection of Field Maps and Revenue records: Towards the charges for collection of field maps, patta, chitta, land owners details, etc., pertaining to both sides of approved alignment as instructed by the Department Officers for survey numbers involved from the starting chainage to ending chainage of this project for the proposed alignment for formation of corridor. (Field work to collect details) | 31,570 | M2 | - | - |
| 2 | Conversion of Individual FMB into Auto CAD File: Identification of respective lands that are corridored by the Transmission Line by Transect Walking System aiding with GPS devices along the center line of the corridor. Preparation of rough alignment sketch by denoting the Survey Numbers of the land that pass through. Based on the sketch, conversion of indivdual FMB Sketch with Ladder measurements that are corridored by the Transmission Line to be done within the Tolerance Limit in AutoCAD. Tolerance Limit shall be applied as per the Survey of India's Guidelines. | 31,570 | M2 | - | - |
| 3 | Combining FMB Sketches and converting into KML File: As per prevailing practices/guidelines, width markings to be carried out on either side from mid-line for entire individual FMB Sketches that pass through the Transmission Line Corridor. Further, entire Individual FMB sketches to be combined for forming alignment Topo Drawing. Profiling of the combined FMB Sketches in the field by providing Control Points at every 2km interval using DGPS Instrument. With Reference to the Control Points, the entire Transmission Line Corridor to be compiled as KML File. | 31,570 | M2 | - | - |
| 4 | Conducting Topographical Surveying: Towards the charges for conducting topographical survey along the Transmission Line to ascertain a corrider width by using Total station (Detailed field survey), If necessary drone can be used with necessary permission if any, including taking of all existing features in the field. The base area of all the towers to be surveyed, Total land area of all the Land owners to be surveyed with the reference of survey stones. Cost of leads, lifts, conveyance, survey tools & plants, hire charges, all labour charges, head loads etc., to be accompanied by the contractor itself. | 31,570 | M2 | - | - |
| 5 | Sub-Division Work: Towards the charges for marking Transmission Line Corridor, Tower Base in the individual FMB sketches and combined FMB Sketches. Calculation of land areas of Tower base, Transmission Alignment along with Corridor Width and identification of land owners. Sub-division sketches to be formed based on the identified land areas. | 31,570 | M2 | - | - |
| 6 | Colour Print of Individual FMB, Combined FMB Sketch, Patta, Sub-division FMB, Topo Map - 6 Sets | 31,570 | M2 | - | - |
| 7 | Marking of Village Topo-map: Marking of corridor from the centre point of location to be marked in the village Topo-map by using AutoCAD software by using guidelines of the Survey of India. | 2 | Nos | - | - |
| 8 | Preparation and submission of documents for fixing land value: Preparation and submitting of 8 sets of documents required for arriving land compensation for all survey numbers in Tower locations / Transmission Corridor, including obtaining sales value from Registeration department for fixing the market value of lands for survey numbers and assisting the revenue officials at the collectorate land section as per the guidelines of the revenue department and as per the instruction of engineer in charge. | 2 | Nos | - | - |
| 9 | Clearing Light jungle for carrying out the Stub-setting & stringing work with all lead, lift including cost of T & P, labour etc. complete | 8,616 | M2 | - | - |
| 10 | Conducting check survey, pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour,all lead, all lift and all head load etc complete. | 10 | Loc | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
BOQ_791730.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].