Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.9 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹28.9 L+₹2,410.90 (0.08%)Accepted-Finance | L2 | Accepted-Finance ok | |
| 3 | L3₹29.8 L+₹93,078.98 (3.22%)Accepted-Finance | L3 | Accepted-Finance ok | |
| 4 | L4₹30.3 L+₹1.4 L (4.79%)Accepted-Finance VILLAGE RASWALA P O DEOTHI TEHSIL DISTT SOLAN | SOLAN | SOLAN | HIMACHAL PRADESH | L4 | Accepted-Finance ok | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical |
Tender Value
₹24.1 L
EMD Value
₹60,000
Closing Date
23 Feb 2017, 5:00 pmClosed
Executive Officer MC Solan
Executive Officer MC Solan
Construction of Street Vendor market with Parking under MC Solan at Bye Pass Solan Sub head First floor
2017_UDDHP_14907_1
MCSolan/2017-7342-43 Dated 01/02/2017
Open Tender
Civil Works
Item Rate
60 days
MC Solan
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,000
Yes
Executive Officer MC Solan
₹60,000
Yes
7 Feb 2020
17 Feb 2017
25 Feb 2017
17 Feb 2017
23 Feb 2017
17 Feb 2017
Amount
Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm. so as to give a fair finish including centring, shuutering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in: a) Collumn, pillars, posts and struts.
Beams, cantilever, girders and lintels.
Flat Surface such as soffits of suspended floors, roofs, landings and the like.
Providing and laying cement concrete 1:1.5:3 (1cement :1.5 sand :3 graded stone aggregate 20mm. nominal size) and curing complete excluding cost of form work and reinforcement for feinforced concrete work in:Column,pillars, posts,and struts.
Suspended floors roofs, landings and shelves and their supports, balconies, beams, girders, bressumers and cantilevers upto floor two level
Brick work using common burnt clay building bricks in cement mortar 1:6(1cement:6 sand) all floors and all height. In cment mortar 1:6(1 cement: 6 Sand) Second class bricks
Half brick work using common burnt clay building bricks in cement mortar 1:4 (1cement:4sand)Second class bricks all floors and all height.
6mm Cement plaster to ceiling in cement mortar 1:4(1 cement: 4 Sand)
10mm thcik cement plaster in single coat on the rough side of brick/concrete/stone walls for interior plastering upto floors two level including arises, internal rounded angles, chamfers and/or rounded angles not exceeding 80mm in girth and finished even and smooth in cement mortar 1:4(1cement:4sand)
Providing wood work in frames of doors, windows, clerestory, windows and other frames wrought, framed and fixed in Position. 1st Class Deodar Wood
Providing and fixing paneled glazed shutters for doors windows and clerestory windows including black enamaelled iron butt hinges with necessary screws. 50mmthick 1st Class Deodar Wood
Glazing with Glass panes of 5.5 mm thickness (weight not less than 13.75 Kg/Sqm).
White washing with lime on undecorated wall surfaces two coats to give an even shade including throughly brooming the surface to remove all dirt dust mortar dirt and other foreign matter.
Applying Birla white wall care putty over plaster surface after thoroughly brushing the surface free from mortar drops, dust, loose materials and other foreign matters sand papered smooth to give final matter finish to the surface complete
Finishing wall with weather proof exterior grade emulsion of approved design (Apexultima) or its equarlied on undecorated wall surfaces (two coats) to give an even shade and final finish after throughly cleaning the surface to remove all dirt, dust and other foreign matter etc including sand paper smooth complete.
Applying priming coat over new wood and wood based surfaces after and including preparing the surface by thoroughly cleaning oil, grease, dirt and other foreigen matter, sand papering and knotting. Readymixed paint brushing with white lead for priming.
Painting two coats( excluding priming coat) on new wood and wood based surfaces with ready mixed paint to give an even shade including cleaning the surface of dirt, dust and other foreign matter sand papering and stopping. With white enamel paint.
Providing mild steel /tor steel reinforcment for r.c.c. work including bending ,binding and placing in position complete up to floor level . Tor steel
BHUPENDER SINGH THAKUR
VIKRANT SHARMA
Virender Thakur
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .