| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.1 CrAdmitted-Finance SC 326 SHASTRI NAGAR GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | -0.10% | ₹4.1 Cr | L1 | Admitted-Finance |
Tender Value
₹4.1 Cr
EMD Value
₹22.5 L
Closing Date
29 Apr 2026, 3:00 pmClosed
CHIEF ENGINEER, KMC
MOtijheel
Development work of the pond located in Ward-62 Sanigwan in Municipal Corporation Kanpur.
2025_NNKAN_1101438_4
1151/AA-2/25-26
Open Tender
Civil Works
Fixed-rate
180 days
zone 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,203
₹22.5 L
12 May 2026
22 Apr 2026
29 Apr 2026
22 Apr 2026
29 Apr 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Excavation in trenches by mechanical means for foundations pipes cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in charge with in a distance of 50 mtr. | - | cum | - | - |
| 2 | Extra lead -1 and lift 3 | - | cum | - | - |
| 3 | Compaction of soil machanical means including all work | - | sqm | - | - |
| 4 | Boaring with hydraulic power pilling side in M-25cc for 30 cm dia etc all work | - | rmt | - | - |
| 5 | RCC Work with cement concrete 1:2:4,1cement :2 coarse sand:4 stone Agregateexcluding centring shutring reinforcment etc all completion | 0.12 | cum | - | - |
| 6 | Mild steel or Iron in Reinforcement including all completion of work. | 0.31 | qtls | - | - |
| 7 | Providing and Laying Cement concrete (1:4:8, 1cement: 4 fine sand: 8 Brick ballast nominal size 40 mm ) and curing complete, including cost of formwork in foundation and floors. | 0.27 | cum | - | - |
| 8 | E/W exavation by labour in foul position etc all work | - | cum | - | - |
| 9 | Class - 150 Brick Work in (1:4 ) cement mortar in Foundation&plinth including supply of all Materials Labour and Tool & Plants etc,required for proper completion of the work. | 0.76 | cum | - | - |
| 10 | 12 mm thick cement plaster 1;4in single coat on Both side of single or half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not exceeding 80 mm in girth and finished even and smooth. | - | sqm | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.59 MB
BOQ_2129183.xls
BOQ • 0.27 MB
tn29042026.pdf
Tender Documents • 0.70 MB
ulb290426.pdf
Tender Documents • 1.14 MB
100stamp.pdf
Tender Documents • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .