| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 CrAccepted-AOC MATOSHI RAVNAGAR JANGAMWADI TARODA NAKA NANDED 431 605 | NANDED | NANDED | MAHARASHTRA | 431605 | L1 | Accepted-AOC Work Order Done | |
| 2 | L2₹8.9 Cr+₹8.0 Cr (914.4%)Rejected-Finance 102 SAIPREM COMPLEX JUNA AUSA ROAD LATUR 413 512 | LATUR | LATUR | MAHARASHTRA | 413512 | L2 | Rejected-Finance Financially Rejected | |
| 3 | L3₹9.0 Cr+₹8.1 Cr (925.0%)Rejected-Finance BLDG NO 8 BEHIND BOMBAY STOCK EXCHANGE RAJABHADUR MANSION AMBALAL DOSHI MARG 2ND FLOOR VILLAGE TOWN FORT CITY MUMBAI | L3 | Rejected-Finance Financially Rejected |
Tender Value
₹8.0 Cr
EMD Value
₹4 L
Closing Date
20 Mar 2026, 3:00 pmClosed
Assistant Director Department Of Archaeology
Assistant Director Department Of Archaeology Chhatrapati Sambhajinagar
kankaleshwar temple compound wall Tq Dist Beed
2026_TCADM_1286801_1
Etender/Notice 13/2026-27
Open Tender
Civil Works - Others
Percentage
730 days
beed
please refer tender documents
3 documents required · 3 mandatory
₹3,540
Yes
₹4 L
Soneri Mahal Department Of Archaeology
5 May 2026
13 Mar 2026
23 Mar 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
16 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes,shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 4,044.2 | Sqmt | 7 | ₹28,309.4 |
| 2 | Excavation for foundation in earth, soils of all types sand, gravel and soft murum,Including removing the excavated matreial upto a distance of 50 M beyond the building area stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling ,ramming, watering Including shoring and strutting etc.complete (Lift upto 1.50m ) SSR 2022-23 Page No.153 Item No. 21.02 | 2,743.21 | Cum | 215 | ₹5,89,790.15 |
| 3 | Excavation for foundation in earth, soils of all types sand, gravel and soft murum,Including removing the excavated matreial upto a distance of 50 M beyond the building area stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling ,ramming, watering Including shoring and strutting etc.complete ( Lift upto 1.50m to 3.0m ) SSR 2022-23 Page No.153 Item No. 21.04 | 305.75 | Cum | 268 | ₹81,941 |
| 4 | Providing and laying in situ M-20 cement concrete of trap/ granite / quartzite / gneiss metal with 15% plum of trap stones for foundation and bedding of retaining walls and jetty etc. including necessary formwork,compacting,curing,bailing out water manually in tidal range etc. complete. SSR 2022-23 Page No.326 Item No. 49.26 | 82.66 | Cum | 7,184 | ₹5,93,829.44 |
| 5 | Filling in plinth and floors with contractors material/brought from outside and approved by Engineer in charge in layers of 15 cm to 20 cm including watering and compaction etc. complete.SSR 2022-23 Page No.157 Item No. 21.37 | 617.63 | Cum | 1,067 | ₹6,59,011.21 |
| 6 | Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete. SSR 2022-23 Page No.157 Item No. 21.38 | 602.35 | Cum | 2,064 | ₹12,43,250.4 |
| 7 | Providing and laying Cast in situ/Ready Mix cement concrete in M15 of trap/ granite/quartzite/gneiss metal for foundation and bedding / steps including steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface, only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.),with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) SSR 2022-23 Page No.175 Item No. 24.04 | 515.59 | Cum | 7,329 | ₹37,78,759.11 |
| 8 | Providing and Laying in situ /Ready Mix cement concrete M-25 of trap /granite /quartzite /gneiss metal for R.C.C.work in foundations like raft,strip foundations,grillage and footings of R.C.C.column sand steel stanchions etc.including bailing out water,Steel centering formwork,laying /pumping cover blocks,compaction and curing roughening the surface if special finish is to be provided (Excluding reinforcement and structural steel)etc.complete,with fully automatic microprocessor based PLCwith SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer)etc.complete.With fine aggregate (Crushed sand VSI Grade) SSR 2022-23 Page No.178 Item No. 25.13 | 191.13 | Cum | 8,297 | ₹15,85,805.61 |
| 9 | Providing and laying Cast in situ /Ready Mix cement concrete M-25 of trap /granite/quartzite/gneiss metal for R.C.C.columns as per detailed design sand drawing or as directed including steel centering,formwork,cover blocks,laying /pumping,compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finishis to be provided and curing etc.complete,(Excluding reinforcement and structural steel).with fully automatic microprocessor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) SSR 2022-23 Item No. 25.33 ,Page No.180 | 191.19 | Cum | 15,245 | ₹29,14,691.55 |
| 10 | Providing uncoursed rubble masonry of trap / granite / quartzite / gneiss stones in cement mortar 1:6 in foundation and plinth of inner walls / in plinth of external walls including bailing out water manually , striking joints on un exposed faces and watering etc.complete. SSR 2022-23 Page No.199 Item No. 28.01 | 98.52 | Cum | 6,251 | ₹6,15,848.52 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
BOQ_2212802.xls
BOQ • 0.35 MB
tenderdraftkankaleshwarcompoundwall.pdf
Tender Documents • 3.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .