| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | L1 | Accepted-AOC low rate | |
| 2 | L2₹2.8 L+₹5,318 (1.91%)Rejected-Finance | L2 | Rejected-Finance High rate |
| Sl No | Description | Qty | Unit | ARUMUGAM . K L1 | P RAGUKUMAR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavating and depositing on bank with initial lead of 10 metre and initial lift of 2 metre in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders as per standard specification | 302 | M3 | 197 ₹59,494 Lowest | 200 ₹60,400 |
| 2.00 | Plain Cement concrete 1:4:8 mix using 40mm HBG metal for foundation and flooring including cost of all materials to site and all labour charges for mixing, laying and curing etc., complete as per standard specification | 1 | M3 | 5,710 ₹5,710 Lowest | 5,712 ₹5,712 |
| 3.00 | R.R. Masonry in Cm 1:5 mix using rough stone Bond stone including cost & conveyance and all labour charges etc., complete | 8 | M3 | 6,000 ₹48,000 Lowest | 6,005 ₹48,040 |
| 4.00 | Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) | 14 | M2 | 585 ₹8,190 Lowest | 587 ₹8,218 |
| 5.00 | Painting the new walls two coats over one coat of priming with best Emulsion paint of approved colour and quality including preparation of surface and finishing neatly etc., complete complying with standard specification and as directed by the department officers etc., complete complying with standard specifications. | 11 | M2 | 263 ₹2,893 Lowest | 265 ₹2,915 |
| 6.00 | Refilling with excavated earth other than sand complying with standard specification. | 299 | M3 | 45 ₹13,455 Lowest | 48 ₹14,352 |
| 7.00 | Supply and delivery and fixing of HDPE tank as per IS 12701/1996 including loading, unloading, transportation and labour charges for fixing of the GI Pipes and Specials for pipe connection works including cutting, threading and fixing charges etc, Complete 2000 liter HDPE tank | 2 | No | 18,770 ₹37,540 Lowest | 18,780 ₹37,560 |
| 8.00 | Supply and delivery PVC 6kg/cm2 pipe and GI Pipe - 50 mm "B" class GI Pipe | 12 | Me | 464 ₹5,568 Lowest | 468 ₹5,616 |
| 9.00 | 90 mm PVC 6kg/cm2 pipe | 552 | Me | 142 ₹78,384 Lowest | 145 ₹80,040 |
| 10.00 | 2' GM Gate valve | 1 | No | 2,323 ₹2,323 Lowest | 2,325 ₹2,325 |
Tender Value
₹3.5 L
EMD Value
₹7,000
Closing Date
17 Sept 2025, 3:00 pmClosed
Executive Officer, Nambiyur Town Panchayat
372 Gobi main road, Nambiyur Town Panchayat, Erode Dt
Extension of pipe line and HDPE Tank in Ward No 3 Konnamadai Guruvaiyurappan Nagar in Nambiyur Town Panchayat
2025_DTP_604050_1
415/2023-3
Open Tender
Civil Works - Water Works
Works
Nambiyur Town panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,000
25 Oct 2025
15 Sept 2025
17 Sept 2025
15 Sept 2025
17 Sept 2025
15 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .