Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.2 LAccepted-AOC | ₹48.2 L | L1 | Accepted-AOC As per order |
| 2 | L2₹49.7 LRejected-Finance | ₹49.7 L | L2 | Rejected-Finance As per decision |
| 3 | L3₹51.9 LRejected-Finance SAI NIWAS ROAD NO 3 HOUSE NO 14 VIVEK NAGAR CHOTA GOVINDPUR JAMSHEDPUR JHARKHAND 8351015 | JAMSHEDPUR | EAST SINGHBHUM | JHARKHAND | 8351015 | ₹51.9 L | L3 | Rejected-Finance As per decision |
| 4 | L4₹53.7 LRejected-Finance MAIN ROAD GHATSHILA | GHATSHILA | JHARKHAND | ₹53.7 L | L4 | Rejected-Finance As per decision |
| 5 | L5₹54.9 LRejected-Finance | ₹54.9 L | L5 | Rejected-Finance As per decision |
Tender Value
₹65.0 L
EMD Value
₹1.3 L
Closing Date
9 Apr 2026, 5:00 pmClosed
Executive Engineer, MDD-5, Dimna
Executive Engineer, Minor Distribution Division No. 5, Dimna, Jamshedpur.
Construction of Boundary wall and provision of 2 no. motor operator and 2 no. security guard for operation of OL-38 ex km 85.47 of CLMC.
2026_WRD_111671_1
WRD/MDD5/DIMNAJSR/F2-03 /2025-26
Open Tender
Civil Works
Percentage
330 days
Ghatsila
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
₹1.3 L
Yes
24 Jul 2026
16 Mar 2026
10 Apr 2026
16 Mar 2026
9 Apr 2026
16 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classlflcatlon Of soil Item-A)and disposal of excavated earth as Obtained ( 50M away from the edge of the trenches) with initial lead of 150M and initial lift of 1.5m as specification and direction of E/I. [WRD 6.1.8] | - | M3 | 177.76 | - |
| 2 | Extra for earth work in hard soil (Vide classification of soil item-B) all complete as per specification and direction of E/A. (WRD 6.1.9) | - | M3 | 15.38 | - |
| 3 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lift including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I.(Mode of measurement compacted volume) [ BCD 5.1.10] | - | M3 | 589.51 | - |
| 4 | Providing desigation 75A one brick flat soling joints filled with local sand Including cost of watering taxes royalty all complete as per building specification and direction Of E/l. [ BCD 5.6.1] | - | M² | 356.52 | - |
| 5 | Providing and laying in position cement concrete of M10 excluding the cost of centering and shuttering-All work upto plinth level 1:3:6 (1 cement:3 coarse sand Zone-lll:6 graded stone aggregate 20 mm nominal size) [BCD 5.3.1.4] | 1 | M3 | 4,125.41 | ₹4,121.28 |
| 6 | Providing and laying In position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-all work upto plinth level.1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) [BCD 5.3.9.1] | - | M3 | 5,218 | - |
| 7 | Providing designation 75A Brick work in C.M. (1:4) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and directionof E/I.[BCD 5.2.10] | - | M3 | 5,752.05 | - |
| 8 | Providing 12mm. Thick cement plaster (1:4) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. [JH-BCD-SOR- 5.7.2] | - | M² | 174.07 | - |
| 9 | Providing 25mm. Thick cement plaster (1:4) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. [JH-BCD-SOR- 5.7.12] | - | M² | 258.87 | - |
| 10 | Centering and shuttering including strutting propping etc. and removal of form for foundation,footing,bases of column for mass concrete. (BCD 5.3.17.1) | 1 | M² | 194.5 | ₹194.31 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
document.pdf
Tender Documents • 5.98 MB
BOQ_150789.xls
BOQ • 2.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].