Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 CrAdmitted-Finance GAT NO 562 1 A SURLI ROAD KARMALA CHOWK TEMBHURNI TAL MADHA DIST SOLAPUR 413 211 | TEMBHURNI | SOLAPUR | MAHARASHTRA | 413211 | ₹12.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹14.1 CrAdmitted-Finance | ₹14.1 Cr | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MS DESHMUKHAND COMPANY L1 | Surendra Infrastructure Pvt. Ltd. L2 |
|---|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | |||||
| 1.10 | Lossening & Recompaction (Bed Preparation) | 13,525.42 | Sqm | 798.5 ₹1.1 Cr | 65 ₹8.8 L |
| 1.20 | Cement Treated Sub-Base (crusher material) | 4,748.81 | Cum | 6,610 ₹3.1 Cr | 9,600 ₹4.6 Cr |
| 1.30 | Cement Treated Base (crusher material) | 4,574.14 | Cum | 9,045.44 ₹4.1 Cr | 11,200 ₹5.1 Cr |
| 1.40 | GSB (grade-I) laying | 3,207.47 | Cum | 4,510 ₹1.4 Cr | 7,100 ₹2.3 Cr |
| 1.50 | Soling for damages more then 250mm depth | 349.8 | Cum | 3,840 ₹13.4 L | 6,200 ₹21.7 L |
| 1.60 | SAMI Layer (for crack width 9mm or more) incl. tackcoat | 13,525.42 | Sqm | 546 ₹73.8 L | 295 ₹39.9 L |
| 1.70 | BC Laying (40mm thickness) incl. tackcoat | 541.02 | Cum | 25,538.3 ₹1.4 Cr | 20,700 ₹1.1 Cr |
| 2.10 | Resurfacing of Existing Bridge (M-25) | 116.5 | Cum | 15,940 ₹18.6 L | 18,750 ₹21.8 L |
| 3.10 | Deployement & Seperately usage of Hydraulic Excavator with Dozer blade assembly/ attachement | 90 | Days | 30,450 ₹27.4 L | 10,500 ₹9.4 L |
Tender Value
₹13.5 Cr
Closing Date
1 Nov 2023, 3:00 pmClosed
Executive Director (P)
NHIDCL, RO-Port Blair
Urgent Road Restoration from Km 107.76 to Km 129.445, Km 130.6 to Km 138 and Km 155 to Km 181 on NH-4 in the UT of Andaman and Nicobar Islands in Package-III on Item Rate and Work Order Basis, through Open Tender in FY 2023-24- 2nd Call
2023_NHIDC_777733_1
NHIDCL/RO/AN/ 2nd Call/ FY 2023-24/31
Open Tender
Civil Works - Roads
90 days
North and Middle Andaman District
As per tender documents
5 documents required · 5 mandatory
₹11,800
Yes
GM NHIDCL
Exempted
NHIDCL, RO-Port Blair
6 Nov 2023
21 Oct 2023
2 Nov 2023
21 Oct 2023
1 Nov 2023
21 Oct 2023
21 Oct 2023 - 26 Oct 2023
26 Oct 2023
Amount
Laying and Jointing PVC Pipe. Heading
Lossening & Recompaction (Bed Preparation)
Cement Treated Sub-Base (crusher material)
Cement Treated Base (crusher material)
GSB (grade-I) laying
Soling for damages more then 250mm depth
SAMI Layer (for crack width 9mm or more) incl. tackcoat
BC Laying (40mm thickness) incl. tackcoat
Resurfacing of Existing Bridge (M-25)
Deployement & Seperately usage of Hydraulic Excavator with Dozer blade assembly/ attachement
Surendra Infrastructure Pvt. Ltd.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
RFP.pdf
Tender Documents • 1.50 MB
BOQ_817539.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid