Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 248 1 CHHEDIPURWA STATION ROAD BEHIND GURU NANAK SCHOOL GONDA UTTAR PRADESH 271001 | GONDA | UTTAR PRADESH | 271001 | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Technical Evaluation is not OK |
| 4 | Rejected-Technical | Rejected-Technical Technical Evaluation is not OK |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
26 May 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Superintending Engineer Electricity Work Circle Malviya road Basti
Increasing Capacity of 33/11 Malviya Road Substation from 1x5 MVA to 2x5 MVA and Construction of One No. 11 KV Feeder Bay
2022_PVVNV_689574_1
01/EWC(B)2022-23
Open Tender
Electrical Works
Lump-sum
Basti
As per tender
2 documents required · 2 mandatory
₹1,180
SE EWC
₹20,000
4 Jun 2022
20 Apr 2022
27 May 2022
20 Apr 2022
26 May 2022
20 Apr 2022
90 days
11 KV LINE MATTERIAL
,e0,l0 dzkl vkeZ gksfYMax DySEi
th0vkb0 ckjcsM ok;j
MsUtj cksMZ DySEi lfgr
uV ,oa cksYV
ih0th0 DySEi
,e0,l0 LVs DySEi
,e0,l0 ^bZ&czSdsV^ ¼,e0,l0 fLVªi½
pSuy czsfdV
,ywfefu;e iSUV
jSM vkfDlkbM iSUV
,e0,l0 gksfYMax DySEi Vki pSuy gsrq
,e0,l0 gksfYMax DySEi xkfMZax ,afxy gsrq
,e0,l0 czsflax DySEi
Vh vkQ
PG Clamp for Dog
Cu. Control Cable 2x2.5 mm2
Cu. Control cable 4x2.5 mm2
24 V Battery & Invertor
Shifting, loading, carriage (from store center basti )& Erection of Single pole structure on 11 mtr. ST Pole including all works of excavation of pit, pole erection, grouting in the ratio 1 : 4 : 8 (cement, sand, 40mm brick ballast) back filling of earth, proper ramming & fitting of all accessories ('V' type cross arm clamps with bolt and nut, Channel-bracket/F-Bracket,Polymer pin insulator, danger board with clamp, Pole no. painting,earthing, painting of pole with painr, making of plinth around ST Pole etc. complete).
Shifting, loading, carriage(from store center basti) & Erection of Double Pole structure on 11.0 mtr. ST Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories For Single Circuit (M.S. angle iron bracing with clamps, top channel with clamps,Polymer disc insulator B & S type, disc fitting B & S type,Polymer pin insulator, P.G. Clamp, 'E' bracket, danger board with clamp,pole no. painting, earthing, grouting of Stay Rod,painting of pole with painr, making of plinth around ST Pole etc. complete). including all work as per norms etc. complete).
Shifting, loading, carriage (from store center basti )& Erection of Single pole structure on 13 mtr. ST Pole including all works of excavation of pit, pole erection, grouting in the ratio 1 : 4 : 8 (cement, sand, 40mm brick ballast) back filling of earth, proper ramming & fitting of all accessories ('V' type cross arm clamps with bolt and nut, Channel-bracket/F-Bracket,Polymer pin insulator, danger board with clamp, Pole no. painting,earthing, painting of pole with painr, making of plinth around ST Pole etc. complete).
Shifting, loading, carriage(from store center basti) & Erection of Double Pole structure on 13.0 mtr. ST Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories For Single Circuit (M.S. angle iron bracing with clamps, top channel with clamps,Polymer disc insulator B & S type, disc fitting B & S type,Polymer pin insulator, P.G. Clamp, 'E' bracket, danger board with clamp,pole no. painting, earthing, grouting of Stay Rod,painting of pole with painr, making of plinth around ST Pole etc. complete). including all work as per norms etc. complete).
Guarding between two poles like single poles, double poles, four poles, etc. to guard LT, 11 KV Line telephone and river crossing, road crossing etc. with G.I. wire no. 6 SWG and G.I. wire no. 8 SWG, including supply, cutting, fabrication and fixing of guarding channel 75 x 40 x 3010 mm with clamps nut & bolts etc. as per drawing.
Chopping of branches of trees of Eucalyptus, Neem, Keekar and other kind of trees along the route of the line and disposal of the same at suitable place.
Shifting, loading, carriage & Laying, spreading, lifting and final sagging of 3 phases of ACSR Dog conductor in accordance with profile and sag chart including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03 Nos. conductor in parallel.
Laying 11 KV, 3 x 185 mm2 XLPE(double ckt), Power cable from outgoing switch/double pole gear to 11 KV double poles in the cable trench 0.45m wide, 0.90m depth. Providing 150 thickness mm local sand for cushion beneath and 150 mm above the cable (quantity of local sand required 0.375 cubm/m in length). making of permanent trench 0.5*0.9*80 mtr with slab cover of 3 inch thickness
laying of cable in gi pipe on road crossing including all works.
jointing charges of 11 kv cj kit
HT connection as per requirement.
Providing & wearing of 6 inch 3.5 mm long G.I. pipe in the feeder cable of size of (3 x 120)mm2 XLPE power cable before making the outdoor cable boxes. The work includes the sealing of G.I. Pipe, top end and lower end of the pipe and proper dressing of cable etc. The work includes lifting, mounting and clamping of 11 KV feeder cable boxes on the feeder with double pole structure and making connections.
PART-B-WORK (SUB-STATION)Note: All the materials required to complete the works will be provided by the contractor.
Shifting, Loading, carriage of following structures.
(a) 33KV Bus Bar Isolator and its Structure
(b) 33 KV L.A. with structure
(c) 33 KV fuse with set structure
(d) 11 kv xlpe cables
(e) 33 KV VCB/CT/ Control Panel/ with structure
(f) 11 kv incoming panel
(g) 11 kv outgoing panel
(h) 11 kv bus coupler
(i) All other small items
Erection,Grouting of following fabricated structures as per RESSPO Drawing.
(a) 33 KV Bus Isolato structure
(b) 33 KV L.A. structure
(c) 33 KV fuse set structure
(d) 33 kv VCB Structure with plinth
(e) 33 KV CT with structure
Erection,mounting and fitting of equipment on erected structures as per RESSPO Drawing.
(a) 33 KV Bus Isolator
(b) 33 KV L.A.
(c) 33 KV fuse set
(d) 33 kv VCB
(e) 33 KV CT
Plinth for 5 MVA Transformer
Construction of plinth for 5 MVA, 33/11 KV Transformer of size (3.5 x 3.5 x 1.5)m (0.50m below ground level and 0.5 m above ground level) as per details & drawing attached :–
Excavation of earth (4.70 x 3.70 x 0.5) m
Flooring of plinth in C. C. 1 : 4 : 8 (cement, sand & brick ballast) for making foundation bed. Size (4.70 x 3.70 x 0.15) m
Ist Class brick work for side walls size 0.345 m wide upto 0.3 M height and 0.23 m wide upto 0.35 m height cm C.C. ratio of 1 : 4 (cement & find sand)
Filling of brick ballast in plinth in ratio 1 : 4 : 8 (cement, coarse sand & brick ballast) with proper ramming. Size (4.0 x 3.0 x 0.65) m
R.C.C. work in the top layer of plinth in ratio 1:2:4 in size (4.46 x 3.46) m and 0.20 m thickness by using MS bar of 12mm both ways. The work also includes binding of steel reinforcement.
Quantity of M.S. Tor of size 12mm dia required for reinforcement of plinth in RCC work should be 18 nos. bars of 3.4 mtr. length and 12 nos. bars of 4.4 Mtr. length. Works also includes cutting, bending and laying etc. in the T/F Plinth.
Grouting of 02 Nos. 90 / 105 lb. Rail pieces of 3.46 M long and (50 x 50 x 6) mm M.S. Angle in R.C.C. work at the top of plinth work also includes cutting of rail and angle pieces etc.
12 mm thick plaster with cement mortar ratio 1 : 4 (cement & fine sand) of plinth of 0.5 M above ground level.
Earth Mat Work (Including Iron Items)
Excavation of earth of size (0.5 x 0.75 x 369) m & (0.5 x 0.75 x 60) m in switchyard area as per drawing for laying of 32 mm dia M.S. Round and 40 x 6 mm size M.S. strip and refilling & ramming of the same earth into the trenches after completion of work
Laying of Earth Mat(including iron items)
Laying of 32 mm dia M.S. Round Bar in 0.75 m deep trenches as excavated in items.
Welding with lap joint minimum length 150mm over lapping on both side of item (i) shall be done so that all the edges may fill completely with high quality Arc welding. All joints shall be painted with black bituminous paint.
Jointing of 32 mm dia M.S. Round in earth mat at cross joint using high quality Arc welding. 75 mm piece of 32 mm Dia M.S. Round shall also be welded to make the joints strong for transfer the fault current. Work also included cutting welding and painting with black bituminous paint of joint etc.(including iron items)
Fabrication of 32 mm dia bar for 3.0 m long electrodes and digging them into ground so that jointing of earth electrode with the Earth Mat can be done by using 75mm long piece of M.S. Round using high quality Arc welding and paints of joints with black bituminous paint. and also boring and lowering of gi pipe with copper cone of 20 feet long 6 nos.(including iron items)
Laying of M.S. Earth Strip :–(including iron items)
Laying of M.S. Earth strip of size 40 x 6 mm (min. weight = 1.9 Kg/m) about 50 mtr. length for connecting the Earth Mat with steel structure.
The work also includes cutting, bending, straigh - tening, over-lapping and welding the Earth Strip with Earth Mat and various steel structures by using high quality Arc welding in already digging trenches.
Painting of Earth Strip of size (40 x 6) mm with one coat of ready mixed primer with two coats of ISI mark synthetic channel green paint.
33 KV Bus Bar Jumpering :
33 KV Bus bar to 33 KV lighting arrestor
33 Kvlighting arrestor to bus isolator
33 KV bus isolator to fuse set
33 KV fuse set to CT
33 kv CT to 33 KV VCB
33 KV VCB Set to 33/11 Power Transformer includes supply & installation of proper size copper lugs with power Transformer.
Installation of 33/11 KV, 5 MVA Transformer as per following
Shifting of 5 MVA 33/11 KV, Transformer to transformer plinth in Switch Yard.
Erection of shifted Transformer at plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect.
Boring and lowering of DELTA earthing with 3 no.G.I. Pipe size 2.25 inch dia… into the ground up to water level 30mtr., with the lower end of solid copper cone Approx 225mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the M.S. earth Strip for Transformer neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support.
Boring lowering of gi pipe 2.25 inch dia upto 30mtr below earth level for both side of transformer including welding with MS strip with transformer
Fabrication and erection of neutral earthing L Type support made of M.S. Channel size 100 x 50 mm. Structure shall be 4 Mtr. long with 1 Mtr. Arms. Structure shall be grouted in ratio 1:3:6 in block size 300 x 300 x 700 mm and painted with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint work includes connecting neutral bushing rod of power Transformer and M.S. Earthing strip with the help of flexible copper bond, M.S. Bolt and washer.
Fabrication and erection of cable support made of two pieces of M.S. Angle (50 x 50 x 6) / 65 x 65 x 6) mm, 2.75 meter long, joined to each other by means of 5 Nos. M.S. Flat (50×6)mm pieces of size 150 mm long each by welding at equal intervals and grouting in a block of size (300 x 300 x 700) mm in CC 1 : 3 : 6 complete with one coat of ready mixed primer and two coats of Al. paint. Work includes providing of three Nos. M.S. clamps made of (50 x 6) mm M.S. Flat for holding the cable including nuts and bolts.
Installation of 11/33 KV Switch Gears in Control Room :
Carefully & safely shifting of 11 KV switch gears from outside to inside the switch gear room, grouting of foundation bolts in C.C. ratio of 1 : 2 : 4 (including cutting of RCC floor and finishing of RCC floor) as per requirement placing, aligning and fixing of 11 KV anchor GI bolts and nuts of proper size for completion of work.
Safely mounting of 11 KV PT on 11 KV Incoming switch gear filling of oil (if required) making all electrical connections and testing & commissioning of work.
Proper fixing and making bus bar connection in between two switch gears after proper cleaning. Work also include proper insulation, taping by empire, PVC and H.T. tape etc.
H.T. Power Cable Laying :
Laying 11 KV, (3 x 300) mm2 XLPE, Cable from power transformer to 11 KV Incoming switch gear in the cable trench 0.45 m wide, 0.90m depth. Providing 150 mm local sand for cushion beneath and 150 mm above the cable (quantity of local sand required 0.375 cubm/m in length). The cable shall be duly protected by brick. On both side of cable by laying brick vertically and bricks would also be laid horizontally on top of vertically laid bricks along the cable (minimum 18 Nos. of bricks per mtr. length are to be laid top and outer side along the cable. (double circuit)
Jointing of following 11 KV Power Cable ends :
Making of 11 KV XLPE Heat shrinkable out door jointing kits after duly plumbing and taping of cable, providing, fixing and crimping of proper size good quality lugs.
Installation of 24 V Battery and invertor
Copper Control Cable Laying as per following.
Laying of different size of (2 x 2.5)mm2 / (4 x 2.5) mm2 Armoured control cables i.e. from Buchholz realy to Marshalling box Marshalling box to indication protection board in switch gear room, 33 KV CT's to CT's Junction Box, CT 33 KV, V.C.B. Control Panel , and capacitor Bank Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box and indication board as per required for installed equipment.
Earthing of 11 KV Switch Gears :
Preparation of earth mat for earthing of indoor equipments by means of M.S. earth strips (40 x 6) mm connecting to 4 Nos. earthing electrodes of 32 mm dia. (including fabrications of earthing electrodes) 3m long on either side and boring with copper cone of gi pipe on both sides of 45 feet long pipe (as per RESSPO drg. RES-40). This work includes driving of earthing electrodes, driving them into earth so that its top remains 500 mm below ground level, earth work, laying, bending, welding of M.S. earth strips (40 x 6) mm and also laying of the M.S. strip (40 x 6) mm in trench of control room and connecting to both sides squares including cost of earth strip (40 x 6) mm approx. 40m length.
Earthing of all indoor equipments by laying and providing M.S. earth strip (40 x 6) mm including cutting, bending and welding etc.
Installation of 33 KV control panel for “VCB” with complete earthing and respectively installation of battery and battery charger in control room and making connection.
Construction of Control cable and power cable trench as per details
contruction of control cable trench as per existing substation trench the work includes dismantalling of old trench also.
Fabrication and fixing cable trench cover of by concrete slab.
painting of all substation structures including old .
Writing of following particulars on 11 KV pannel in English Script in Block letters with white enamel paint including cost of paints.
(i) Name for feeder on front & back side of pannel
(ii) Date of testing
(iii) Date of commissioning
Earthing of Outdoor equipment with G.I. Strip with Earth Mat work.
Testing of all 33 /11 KV Switchgears and S/S Pannels etc.
All other carriage,erection and small works/materials associated to successfully complete the work in all respect.
dismantalling and restting of security for completion of works
M/S jai ambey traders
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .