Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.6 LAccepted-AOC KTA ROAD LAMBA LINE JUNGLIGHAT PO PORT BLAIR 744103 | PORT BLAIR | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744103 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹28.4 L+₹3.4 L (13.8%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹31.3 L+₹6.4 L (25.5%)Rejected-AOC 213 F BLOCK MEGA MARGANPATTE HADAPSAR PUNE 411013 | PUNE | MAHARASHTRA | 411013 | L3 | Rejected-AOC Rejected | |
| 4 | L4₹32.2 L+₹7.2 L (29.1%)Rejected-AOC | L4 | Rejected-AOC Rejected | |
| 5 | L5₹32.2 L+₹7.3 L (29.2%)Rejected-AOC | L5 | Rejected-AOC Rejected |
Tender Value
₹31.5 L
EMD Value
₹63,000
Closing Date
9 Feb 2022, 6:00 pmClosed
GE (I) Campbell Bay
GE (I) Campbell Bay, Army Land, Campbell Bay, Great Nicobar-744302
REPAIRS TO RO PLANT, PRESSURE SAND FILTER, CENTRIFUGAL/ SUBMERSIBLE PUMPSETS AND ALLIED WORKS AT PUMP HOUSES IN INS BAAZ AND ARMY LAND UNDER GE (I) CAMPBELL BAY
2021_MES_480632_3
8772/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE (I) Campbell Bay
Please refer tender documents
8 documents required · 8 mandatory
₹500
Yes
GE (I) Campbell Bay
₹63,000
8 Mar 2022
19 Jan 2022
11 Feb 2022
19 Jan 2022
9 Feb 2022
26 Jan 2022
Amount
Servicing / over hauling of Electric driven Vertical / Horizontal split casing Pump sets Installed at Army Land Pump House coupled with upto 20/7.5/5 HP Motor along with following others repairs. a). Taking out Pump from its Position by decoupling from Motor and disconnecting all suction /delivery water connections , setting aside Pump from base plate , b).Dismantaling of Pump complete part by part carefully , degreasing bearing and display all the parts without damaging any portion for inspection of Engineer-in- Charge to ascertain the serviceability of existing parts. c). Replacement of Gasket set and gland packing rope . d). Reassembeling the Pump complete with all existing serviceable parts obtained against Item 31, greasing the bearing with bearing grease , and new parts as ordered by Engineer in Charge.( New parts shall be measured and paid separately under appropraite Item here-in-after) e) Reinstall the Pump at its existing Position , couple with the Motor and connecting all suction delivery water connections and testing on completion
Servicing / over hauling of Electric driven Vertical / Horizontal submersible pump sets installed in open wells including removel from well and cleaning the surfaces up to 15 HP Motors along with following others repairs a). Taking out Pump from its Position by decoupling from Motor and disconnecting all suction /delivery water connections , setting aside Pump from base plate , b).Dismantaling of Pump complete part by part carefully , degreasing bearing and display all the parts without damaging any portion for inspection of Engineer-in- Charge to ascertain the serviceability of existing parts. c). Replacement of Gasket set and gland packing rope . d). Reassembeling the Pump complete with all existing serviceable parts obtained against Item 31, greasing the bearing with bearing grease , and new parts as ordered by Engineer in Charge.( New parts shall be measured and paid separately under appropraite Item here-in-after) e) Reinstall the Pump at its existing Position , couple with the Motor and connecting all suction delivery water connections and testing on completion Note for Item No.1 & 2 :- (i). Any Parts required for replacement shall be measured and paid seperately under appropriate item as ''Supply only'' (s) of this schedule. However labour element involved in replacement is included in unit rate quoted against this Item. (ii). Any unforeseen minor repair and minor parts that are not covered under Item No-23 to 30, (a) to (e) but required to complete the repair work / smooth functioning of Motor / Pump shall be deemed to be included with the unit rate .Transportation of Stator / Rotor parts for machining & rewinding, shaft impeller bushing for machining , welding , turning at lathe shop at Port Blair are also deemed to be included with unit rate. iii). Rewinding of stator / rotor of motor, any machine work where involved shall be measured and paid separetely against relevant item of this schedule.
Supply only the following Items of Pump set & Motor to incorporate against each Item No-1 & 2 Schedule here-in-above. Gun metal Impeller for 7.5 HP / 20 HP
MS Coupling for 20/7.5 HP
DE ( Driver End ) bearing as per existing size Make- SKF, NBC
NDE ( Non Driver End ) as per existing size Make- SKF, NBC
Bakelite Terminal connection plate with brass nuts bolts and washers
Plastic Rotar Fan
GI Flange 80 mm bore
Pump Shaft suitable for existing pump sets
Leather gasket for flange 100 mm bore.
Leather gasket for flange 80 mm bore.
Rewinding burnt coils of Induction Motor stator cap 20 HP obtained from Item Ser No-1 here-in-above with super enameled copper winding wire as per existing size and gauge to achieve the required /specified RPM along with including taking out old unserviceable winding ,cleaning/ repairing damaged slots , complete as directed
Rewinding burnt coils of Induction Motor stator cap 7.5 HP obtained from Item Ser No-1 here-in-above with super enameled copper winding wire as per existing size and gauge to achieve the required /specified RPM including taking out old unserviceable winding ,cleaning/ repairing damaged slots , complete as directed
Rewinding burnt coils of Induction Motor stator cap 5 HP obtained from Item Ser No-1here in before with super enameled copper winding wire as per existing size and gauge to achieve the required /specified RPM including taking out old unserviceable winding ,cleaning/ repairing damaged slots , complete as directed
MS Channel base frame for 20/7.5 HP Pump set
MS Channel base frame for 5 HP Pump set
Supply & Fix the following items under repairs complete all as specified & directed. DOL starter for 7.5 HP
Single phase preventer for up to 20 HP Pump set
Star Delta starter for up to 20 HP Pump set
Material & Labour sluice vale 80 mm bore PN 1.6 class including removel of old unserviceable valve complete all as directed.
Material & Labour for cleaning of rotational moulded PVC /Steel water storage service tanks of 1000 to 2000 litres capacity on buildings by dewatering complete tank, removing sediments setteld at the bottom of tank and scraping the walls and bottom of tank and cleaning with bleaching powder solution, washing with clear water and wiriting the date of cleaning and due date of cleaning in white paint complete all as directed. (On Weekly Basis )
Material & Labour for overhauling and painting of RO plant of capacity 1000 LPH by carefully dismantling the complete plant from the installed position carrying out the following maintenance and re-installing in its original position including testing in completion with the following, all as specified and directed. (a) Opening the raw water fed pump (01 No) replacing the unserviceable water seal and re-assembling. (b) Opening the FRP sand filter (01 No), removing the existing filter media and filling new media not re-assembling. (c) Opening the FRP Activated Carbon Filter (01 No) removing the eixsting filter media and filling new media and re-assembling. (d) Disconnecting and removing unserviceable PU4 pipes (Approx 15m) and connecting new PU4 pipes. (e) Opening the micron filter (03 Nos), replacing the filter cartridge and re-assembling. (f) Opening the membrane and replacing the same with new membrane. (g) Opening the UV nit (01 No) replacing the unserviceable UV lamp and re-assembling. (h) Disconnecting and removing unserviceable raw water flow indicator (01 No) and connecting new flow indicator.
(j) Disconnecting and removing unserviceable TDS meter (01 No) and connecting new TDS meter. (k) Disconnecting and removing unserviceable Ammeter (01 No) and Voltmeter (01 No) and connecting new Ammeter and Voltmeter. (l) Disconnecting and removing unserviceable stainless steel & CPVC conne3cting pipes (Approx 15m) and and connecting new stainless steel CPVC pipes. (m) Disconnecting and removing unserviceable Pressure switches (05 Nos) and connecting new pressure switches. (n) Disconnecting and removing unserviceable Pressure gauges (05 Nos) and connecting new pressure gauges. (o) Disconnecting and removing unserviceable Hours meter (01 No) and connecting new Hours meter. (p) Disconnecting and removing unserviceable gate valves (05 Nos) and fixing new gate volves. (q) Disconnecting and removing unserviceable Multi Port Valves (02 Nos) and connecting new Multi Port Valves. (r) PVC water tank cleaning of capacity 3000 ltr Note: The quoted rate shall be exclusive of spare parts. The spare parts required as above shall be measured and paid separately under respective items below as 'Supply only' labour element for fixing is deemed to be included in the unit rate quoted.
Supply only 10 micron jumbo filter cartridge required for Maintenance of RO plant.
Supply only 5 micron filter cartridge (20"x2") required for Maintenance of RO plant.
Supply only CPVC pipes 15 mm bore with all necessary CPVC fittings confirming to ASTM D-2846 and SDR-11 fittings in existing RO Plant complete all as specified. Make: PRINCE
Supply only CPVC pipes 20 mm bore with all necessary CPVC fittings confirming to ASTM D-2846 and SDR-11 fittings in existing RO Plant complete all as specified. Make: PRINCE
Supply only DOL Starter suitable for existing RO Plant.
Supply only High pressure Pump suitable for existing RO Plant.
Supply only circulation Pump suitable for existing RO Plant.
Supply only 3 way valve suitable for existing RO Plant.
Supply and fix membrane of dimension 4'' x40'' type of membrane spiral wound as per existing RO plant of makes Hydranautics-USA,GE.
Material & Labour for overhauling of pressure feed filter plant of capacity 27000 LPH by carefully removing the old unserviceable media complete from plant from its installed position carrying out the maintenance and reinstalling in its original position and testing on completion, all as specified and directed
Supply only Sand Fillter Media
Supply only Dolomite.
Supply only Shilack.
Supply only Activated Carbon.
Supply only 3 way valve suitable for RO Plant.
Taking out existing Unserviceble GI pipe and Supplying, laying or fixing in replacement, GI water tubing 50mm dia bore, medium grade, confirming to IS-1239 [Part-1] including all fittings such as bends, tees, short pieces, connectors, elbows, reducers, etc laid in tenches / floors or fixed to walls / ceiling / roof etc including testing and taking up / down existing unserviceable GI tubing with fittings / connections, carefully from trenches / celiling /walls/roofs etc complete all as specified and as directed.
All as per Item No.40 but for 80mm dia bore.
Supply & Fix Gun metal gate /non-return valve,with iron wheel head, screwed both ends for iron pipe 50 mm bore dia with and including taking down the existing old one complete all as specified and directed.
All as per Item No.42 but for 80mm dia bore.
All as per Item No.42 but for 50mm dia Non-Return valve
All as per Item No.42 but for 80mm dia Non-Return valve
Supply & Fix Cast Iron foot Valve 50 mm,with flanged ends jointing with suitable rubber gasket,nuts, and washers complete including taking down the exiting unserviceable valve all as specified and directed by Engineer in charge.
All as per Item No.46 above ,but for 80mm dia valve
Supply & Laying submersible copper cable flat 3 core PVC insulated PVC sheathed industrial heavy duty cable of size 2.5 sq mm complete all as specified & directed Make: Havells, Finolex, Gloster or equivalent
M & L for addition alteration in old GI pipe, screwing, cutting, threading, fixing of GI fittings like union, elbow, Tees, nipples, dummy, plugs etc of upto 80 mm bore including attending any minor work regarding pipe line as per directed by Engr-in-Charge. Note: Rates for necessary G1 fittings like union, tees, nipples, elbow etc is deemed to be inclusive in above quoted rates.
Scraping of old paint of Electric induction Motor upto 20/15 HP Motor , NC Vertical/ Horizontal / Multi staging Pump , Suction , delivery Pipes, sluice valves , NRV Valves at Jalkendra ,Swimming Pool, Rekhamari, old Pump House, STP, AROP, IMPH Sewage Pump House (Approx coverage area-8-10 Sqm) and Painting with one coats of red oxide paint and two coat of synthetic enamel paint of shade as directed by Engnr-in-Charge including writing Sm No. complete as all specified and as directed
M&L for testing of drinking water (outlet of RO Plant) as per the IS Norms (IS-10500) with all requisite necessary parameters specified and directed by Engineer-in-Charge. NOTE: (1) Drinking water samples may be taken from the RO plant as submitted to the testing agency within 12 Hrs of time. (2) Test Report to be submitted to the Engineer-in-Charge within 48 Hrs from collection of samples
NOTE : An Amount of Rs 22,897/- towards Schedule of Credit shall be deducted to arrive the Contract Sum
KCM BUILDERS & CONSTRUCTIONS INDIA PVT LTD
Crown Chemicals
M/S RAJBUILDERS
bansal construction
T.M.RAMANATHAN AND SONS
MAHESWARI CONSTRUCTIONS
RSL Construction
M/S Sudhir Kumar Gupta
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .