Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Finance | -33.57% | ₹1.3 L | L1 | Admitted-Finance |
| 2 | L2₹1.3 LAdmitted-Finance | -32.21% | ₹1.3 L | L2 | Admitted-Finance |
| 3 | L3₹1.3 LAdmitted-Finance | -31.55% | ₹1.3 L | L3 | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹3,900
Closing Date
2 Mar 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW JAMMU
EXECUTIVE ENGINEER REW JAMMU
Constt. of lane drain near the house of sh. Manohar singh and Jatinder singh to onwards at Roi near puran resort pyt. Babliana Block Satwari Under CDF for the Year 2025-26
2026_RDPR_303578_3
E-NIT No. 838 REWJ of 2025-26 dated 17-02-2026
Open Tender
Civil Works
30 days
jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹3,900
3 Mar 2026
17 Feb 2026
3 Mar 2026
17 Feb 2026
2 Mar 2026
17 Feb 2026
Labour engagged for clearance of site
Earth work in excavation in foundation and trenches lead upto 1 mtr, lift of 1.5 mtr.
CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
FORM WORK Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete.
flooring 1:2:4 c.cement mix
providing fixing of 60mm th. Cement conc. Mix of interlock tile of app. Qty.
Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
structural steel buit up section inclu. Cutting, bending, and complete job.
Sand + Bajri for (10 km)
Cost of Sign Board
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_985850.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid