| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance | ₹3.0 L | L1 | Accepted-Finance LOWEST BIDDER |
| 2 | L2₹3.0 L+₹6,675.94 (2.24%)Rejected-Finance | ₹3.0 L+₹6,675.94 (2.24%) | L2 | Rejected-Finance QUOTED RATE HIGH |
| 3 | L3₹3.1 L+₹9,566.86 (3.21%)Rejected-Finance 119 RABINDRA PALLY KOLKATA 700084 | 24 PARAGANAS SOUTH | WEST BENGAL | 700084 | ₹3.1 L+₹9,566.86 (3.21%) | L3 | Rejected-Finance QUOTED RATE HIGH |
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
20 Aug 2026, 2:00 pmClosed
EE (C)/WS /BR-XI/ JU
BAGHAJATIN MARKET COMPLEX UNIT III, BAGHATJATIN STATION ROAD, KOLKATA-700086
RESTORATION OF W.S SERVICE PIPE SHIFTING AND CHANGE 100 MM DIA PIPE AND INSTALLION SV WITH CHAMBER AND SHIFTING AND REPAIR HOUSE CONNECTION AT JAMADAR PARA, RANGKOL MATH AND SATINDRAPALLY DIFF. BYE LANES IN WD NO 111, BR-XI
2026_KMC_1035792_1
EE(WS)/BR-XI/NIeT/43/2026-27 1st call
Open Tender
CIVIL WORKS
Percentage
35 days
WARD NO 111
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,000
8 Sept 2026
3 Aug 2026
22 Aug 2026
5 Aug 2026
20 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.11 Hire and labour charges for coloured and twisted cloth rope fencing as per design approved by Engineer-in-charge one line with 100 mm dia Eucalyptus or bamboo posts 0.60 m above G.L and 300 mm below G.L 1.50 m apart fitted and fixed complete including painting with white zinc painting (2 coat) complete.Payment of painting to be made seperately. | 99 | METER | 20 | ₹1,980 |
| 2 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.14 Signalling arrangement at both sides of site to avoid any accident during working period 4 nos. red flags during sunlight at 4 corners and 2 nos light (lamp) in other than sunlight. | 11 | Daily | 202 | ₹2,222 |
| 3 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.12 Supplying sign-board made of 25 mm thick sal plank with frame on all side of sal batten 50 mm x 32 mm with nailed on post 3.15m x 100mm x100mm and fitting fixing such with digging holes of dia 300 mm and depth 750 mm in all sorts of soil and repacking and consolidating the gap aroundthe post with cement concrete (1 : 3 : 6) painting 2 coats including cost of nails, bolts and nuts etc. complete in all respect as per direction of theEngineer-in-charge. Payment of concrete and painting to be made separately. (i) 600 mm. x 450 mm. size of board. | 2 | EACH | 427 | ₹854 |
| 4 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 2. Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m In ground floor including roof. (a) upto 150 mm. thick | 8.4 | CUBIC METER | 939 | ₹7,887.6 |
| 5 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.5 Cutting & picking up existing metalled black top portion of road surface to an average depth of 300 mm by using Jack hammer with all necessary tool and plant including reening the serviceable materials & stacking within a lead of 75 mtr. all complete as per direction of the Engineer-in- Charge. | 3.91 | CUBIC METER | 636 | ₹2,488.03 |
| 6 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.1 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 90.67 | CUBIC METER PERCENT | 119.27 | ₹10,814.45 |
| 7 | CHAPTER - III TAKING OUT PIPES AND SPECIALS Cast Iron / Ductile Iron Pipes and Specials TakIng out C.I, / D.I. pipes with specials and valves including stacking the same within a lead of 30 M as per instruction of the Engineer-in-Charge, (Excavation. dewatering. earth filling etc. will be paid separately). Pipe up to 150 mm diameter and depth of trench up to 2 Metre. | 80 | METER | 80 | ₹6,400 |
| 8 | ISI MARKED CENTRIFUGALLY CAST(SPUN) DUCTILE IRON PRESSURE PIPE FOR WATER WITH SOCKET & SPIGOT JOINT CONFORMING TO IS 8329/2000 (LATEST AMENDENDMENT OF STANDARD LENGTH SUITABLE FOR PUSH ON JOINT (RUBBER GASKET JOINTING) WITH CEMENT MORTER LYNING INSIDE THE PIPE S & OUTSIDE ZINC COATED WITH FINISH LAYER OF BITUMINOUS COATING OR SYNTHETIC ENAMEL BLUE EPOXY) COMPATIBLE ZINC COATING. (I) DIA 100MM | 11 | METER | 1,014.41 | ₹11,158.51 |
| 9 | CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.1.2 Lowering any type of Ductile Iron (DI) pipes & specials and laying along trench at any depth as per speclfication and direction of the Engineer-incharge, ( laying over ground. the rates shall be, reduced by 10% and the rates so reduced shall be inclusive of cost of all sorts of holding arrangements]Diameter in mm 100mm dia. | 91 | METER% | 14 | ₹1,274 |
| 10 | CHAPTER - VIII SUPPLYING OF MATERIALS 8.3 All types of Ductile Iron (D.I) Specials (viz. Bend. Tee. Taper. Tail piece etc), size conforming to I.S. Specification No. 9523/2000 with cement mortar lining (inside) and bituminous coating (outside). (25% of payment will be held up till successful hydraulic testing) a) All Socket Tee 100 mm to 300mm dia. | 19.5 | KILOGRAM | 128 | ₹2,496 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
TECHBID.pdf
Tender Documents • 1.38 MB
BOQ_2544557.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .