| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 CrAccepted-AOC | ₹1.4 Cr | 1 | Accepted-AOC awarded |
| 2 | 2₹1.5 Cr+₹7.1 L (5.02%)Rejected-Finance | ₹1.5 Cr+₹7.1 L (5.02%) | 2 | Rejected-Finance high bidder |
Tender Value
₹2.8 Cr
EMD Value
₹5.5 L
Closing Date
12 May 2025, 10:00 amClosed
Executive Engineer
FARIDKOT CANAL GW DIVISION FARIDKOT
Laying U/G Pipeline and Constructing Water courses for the outlet RD 136500/R Raunta Disty
2025_WR_137784_1
Laying U/G Pipeline and Constructing Water courses for the outlet RD 136500/R Raunta Disty
Open Tender
Civil Works - Canal
Item Rate
120 days
GHOLIA
Pre Qualification Details
2 documents required · 2 mandatory
₹2,000
Yes
₹5.5 L
Yes
Faridkot
23 May 2025
31 Mar 2025
12 May 2025
31 Mar 2025
12 May 2025
31 Mar 2025
7 Apr 2025
Amount
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads,excluding royalty
Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods.
Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% in 15 cm layers including ramming, watering and consolidating lead upto 30 metres
Dressing of new earthwork.
Preparation for Sub Grade for Lining
First Class burnt Brick work laid in cement sand mortar 1:6 in foundation and plinth
10 mm thick plaster with cement mortar 1:4 on bed & top of side walls.
10 mm thick plaster with cement mortar 1:4 on walls.
First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth
10mm thick Cement Plaster 1:3 on walls
10mm thick cement plaster 1:3 on bed & top of side walls
R.C.C 1:2:4 with stone blast mixing by manual means.
Cement Conc. 1:4:8 witb stone ballast, mixing by manual means.
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
Cold twisted deformed bars fe 500 grade for RCC work where not included in the complete rate of RCC i/c bending binding and placing in position
Supplying & laying dry brick bats
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Cement Conc. 1:2:4 with stone ballast or shingle mixing by manual means.
Providing orange colour safety footrest of minimum 6mm thick plastic encapsulated as per IS:10910 on 12mm dia steel bar confirming to IS: 1786 having minimun cross section as 23mm x 25mm and over all minimum length 263mm and width as 165mm with minimum 112mm space between protruted legs having 2mm tread on top surface by ribbing or chequering besides necessary and adequate anchoring projections on tail length on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test as per specification and having manufacturer‘s permanent identification mark to be visible even after fixing, including fixing in manholes with 230x150x75cm cement concrete block 1:2:4 (1 cement: 2 sand: 4 stone aggragate) complete as per design
Providing, lowering precast concrete NP-2 Plain end pipes and collar with reinforcement, in trenches to correct gradient and alignment, cutting of reinforcement cement concrete plain end pipes, stringing in trenches, jointing ends and fixing collar with cement mortar 1:2 as per IS 458:2003 into trenches for all depths and laying out same to correct alignment, gradients, levels etc. complete in all respect (Dia 600 mm)
Rehandling of earth work recently excavated
10 mm thick plaster with cement mortar 1:3 on bed & top of side walls
10 mm thick plaster with cement mortar 1:3 on walls
First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth
Providing, lowering precast concrete NP-2 Plain end pipes and collar with reinforcement, in trenches to correct gradient and alignment, cutting of reinforcement cement concrete plain end pipes, stringing in trenches, jointing ends and fixing collar with cement mortar 1:2 as per IS 458:2003 into trenches for all depths and laying out same to correct alignment, gradients, levels etc. complete in all respect (Dia 450 mm)
Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 1.5 mtr.
Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 1.5 to 2.25mtr.
Lowering, jointing of RCC NP-2 plain end pipes 500 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect.
Jointing and cutting of RCC NP-2 plain end pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment as per IS 458:2003 ( @2.50 metre / No)
Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank
Providing and fixing of Alfa Alfa Valve fitted on riser pipe to act as Nakka (D regulators)
Providing & Fixing of Steel Shutter Gate Assembly in Main Pipeline complete in all respect
Providing & Fixing of Assembly/Appurtments consisting of a Alfa Valve and operating arrangement in Main Pipeline complete in all respect
Dismantling of Brick work in Cement
Lowering, jointing of RCC NP-2 plain end pipes 450 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect.
Lowering, jointing of RCC NP-2 plain end pipes 400 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect.
Any other Item
M/S GARGA CONSTRUCTION COMPANY (BID ID -641314)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .